GUSTAV KLIMENT PIPE ROLLING MILLS, CHOMUTOV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002601070009-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
December 17, 2010
Sequence Number: 
9
Case Number: 
Publication Date: 
November 4, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002601070009-6.pdf132.78 KB
Body: 
Sanitized Copy Approved for Release 2010/12/17: CIA-RDP80-0081 OA002601070009-6 Fi /077 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT COUNTRY Czechoslovakia This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - U. S. OFFICIALS ONLY 50X1-HUM SECURITY INFORMATION SUBJECT Gustav Kliment Pipe Rolling Mills, Chomutov PLACE ACQUIRED REPORT DATE DISTR. 4 November 1953 NO. OF PAGES 2 REQUIREMENT 50X1-HUM REFERENCES 50X1-HUM THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) le The Gustav Kliment Pipe Rolling Mills, Chomutov, are loonted on the'eastern edge of Chomutov and oocoupy an area of approximately two square kilometers. 2. The factory produces a variety of steel and iron pipe from 15 to 600 mm. in diameter, with both 'V'h1.,.Nk and thin wal.:V.s, but it concentrates chiefly on the smaller sizes of from 15 to 40 mm. diameter with thick walls. Most of the pipe of larger diameter is insulated or rust-protected, suggesting that it is for drainage or pipeline use 3. The daily production of pipe amounts to from 15 to 20 railroad cardloads. All finished products seem to be dispatched to the USSR, as the w-citing on the railroad cars is in R'u lsiari. All raw material is received as ingots (iron) or ore, by rail, also with markings in Russian on the cars. 4. Machinery in the factory includes all the well-known types, such as lathes, pipe rolling mills,, stamping, straightening and profiling machines, etc. Most of the machines are old. When new machinee,do arrive, the factory has great difficulty in, finding skilled workers capable of operating them. It frequently happens that valuable parts such as motorsor pumps are removed for use with other machinery. 5. The manufacturing is done in five large hall's, each measuring 100 by 260 meters. Each shop is responsible for the'complete production of a particular size of tube, and each is separately guarded and can be entered only with a special pass. Workers in one shop cannot enter halls to which they are not assigned. A number of members of the plant militia are in each shop..employed as workmen, and they oannot be distinguished from the other workers, since they also wear working olothen. 6. Inspection of finished products is done by. Soviet civilians who stamp the goods when accepted. In the course of production, testing only takes place sporadically, and the testing staff consists mainly of women. It is esti- mated that the average of rejections is approximately 25%, bu.6 runs as high as 40% in the case of small-profile pipe. This poor quality of products is { SECRET/CONTROL - U o S. OFFICIALS ONLY STATE ARMY I 7C NAVY AIR rx (Note Washington Distribution Indicated By "X"; field Distribution By "#".) AEC 0 Sanitized Copy Approved for Release 2010/12/17: CIA-RDP80-0081 OA002601070009-6 Sanitized Copy Approved for Release 2010/12/17: CIA-RDP80-0081 OA002601070009-6 SECRET/CONTROL - U. S. OFFICIALS ONLY caused by the acute shortage of qualified personnel and"the poor maintenance of the machinery. The maintenance and repair staff have to work nightarid Sunday shifts in order just to keep the machinery in bare working order. 7. The total number of employees in the Chomutov factory is Approximately- 5,000; 40% of these are women and 15% of the total constitutes the admin- istrative staff. Important officials of the plant are the following: a.. Ladov (fnu), managing director. b. Partek (fnu), deputy director. c. Lederer (fnu) and Noveta or Novota (fnu), works engineers. g. The managing director and his deputy appear to be political appointees,. while Lederer, who is a Sudeten German, is a steel pipe expert. None of the senior officials can be distinguished from'the workers, as they also wear working overalls. 9. The plant has its on railroad sidings and'five or six locomotives are used for switching inside the factory. The plant also has a small emergency .... electric power plant of its own, but most of its requirements of water, gas, and electric power are supplied from outside. .10. On the northern edge of the factory, three large new shops are being built. to be used as assembly halls. SECRET/CONTROL - U. S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/12/17: CIA-RDP80-0081 OA002601070009-6