BREMENHAIN AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002700610009-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 12, 2002
Sequence Number: 
9
Case Number: 
Publication Date: 
October 9, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002700610009-6.pdf204.98 KB
Body: 
Approved For Release 2002/07/29 : CIA-RDP80-00810A002700610009-6 OUNTRY LLI i Bremenhain Airfield VALUATION -...._ se e: below OBTAINED_ DATE OF CCidTf~",. 1'7June to 11 September 953 ,... -.. .. 25X1A C PREPARED_ ,ENCLOSURES 25X1X 25X1X 25X1A Since the June 17 distuu:rbances, construction work at Brenerthain airfield has continued with day and night shifts. In particular, work on the runway h:.s been accelerated,, Construction nate_rial continuously arrived at the '..T1d . `'. In late August 1953, grading work on the landing field was completed, The i rairacre ditches to be laid at the field are to et:^nty into the Neisse River. of the construction staff stated that the location of the airfield ~.v not ^avorable because or the subsoil water pressure. Concreting work on the section of the runway south of P.remorhain-Lodenau.:road uas completed by i September except for a strip in the ni:ddle.'According to a meanbe ? of the construction staff, the entire runway was to be corrnleted b;r 15 .to'ber 1953. Allegedly, the runway was to be extended to the north and a circular A. was to be built and had already been surveyed 1qowevef?, construction .work had not yet started by 11. September . 3. The Lodenau?-Noes road was under improvement with the concrete :,'.`ores having been put in place on one side of the road by 11 Septrrsebea . Concreting work had not yet started,, U oc completion of this roads the Brer enha n-Lodenau road will allegedly be demolished. Only after the destruction of the latter road will concreting work on the ru.nu:?ay strip north of this road be started. 4. in late A,uE=?ust, construction work was cor;apl :ted oil five small brick bui:3 dingo, allegedly, office?c billets, near the park of the Bremenhain estate, A spur track was to bi: built from the Lodenau Rothenburg railroad line to the field dtzrr.p. Three standard-gauge locomotives, one from Hoyerswerda and two from Luckau, were used for construction works The concrete nixing installation was still in operation. However, the L.- eciP.l tilting cars of Hungarian make were usually under repair. An ;z,titraated 700 laborers including 200 to 250 convicts were employed at the ri+.eld. They worked in two, shifts between 3:30 a.m. to 9:30 p.m Tine status of the work was inspecited by a Soviet team apnroxi.,sately every( two weeks. 1 CLASS1F1CAi"iON SW"'tT Approved For Release ?002/07/29 : CIA-RDP80-0081OA002700610009-6 25X1A 9 October 1953 FLD 25X1 25X1 Approved For Release 2002/07/29 CIA-RDP80-0081OA002700610009-6 S? fR1 25X1 25X1A S._'ie's about early September 1953, there has been intensive air activity by u i_ r cr of : coming from the Polish-occupied Garrnan territory to the Soviet Zone of Gerimany. Alrost every everting after nightfall, aircraft crossed over the zonal border and made flights of about 15 minutes duration. Most of the aircre~ t used were propeller .driven aircraft. 2 Work on the runway has been accelerated since late August 1-953. Concreting 1-ork on the northern third of the runway was started on 8 Septeirber. Allegedly, a circular taxiway is to be built in 1954. 9. Work was under =ray on the Rothen'ourg Loder.au road, east of the railroad ~._.raa. The trees and telephone poles along the Bremenhain-Lodenau road were removed and the local resident's expected that the road would be blocked approxir.ter y in late September. A second spur track was being built, from the railroad line tower d the woods south 6,f Ioderaau. 1 13 Major Mironenko (fnu) who arrived at the Soviet construction headquarters In a