HUNGARIAN RAILROADS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002700790004-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
November 23, 2009
Sequence Number: 
4
Case Number: 
Publication Date: 
November 6, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002700790004-2.pdf90.52 KB
Body: 
Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2 Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2 Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains Information affecting the Na- tional Defense of the United States, within themean- ing of Title 18, Sections 793 and 794, of the U.S. Oode, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. 25X1 SECRET/CONTROL - U.S. OFFICIALS ONLY COUNTRY Hungary SUBJECT Hungarian Railroads DATE OF INFO. PLACE ACQUIRED REPORT DATE DISTR. NO. OF PAGES REQUIREMENT REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) le Budapest Northern Railroad Bridge. Steel girders for the span of the Ujpest bridge are assembled near the old Horthy Miklos bridge on Boraros tor. The bridge is expected to be finished about mid 1954. 2. Budapest Southern Railroad Bridge. A new span has been completed, besides the reconstructed old span.' The emergency span is being dismantled. The bridge will eventually carry vehicular traffic and double railroad tracks. 3.. Budapest Subway. Cave-ins have ocourred during work on the Budapest subway at Kosauth t(r and at the National Theatre. 4. Locomotives. The boilers of 40 locomotives constructed by the Mavag Works for the Hungarian State Railroads have been found to be faulty. Because they did not prove to be steam-tight, it was decided to scrap theme 5. Hegyeshalom Budapest Line. 25X1 Automatic signal oontrolL I is being installed along the Hegyesha- lomBudapest line. 6. Budapest-Baja Line. The line from Budapest to Kunszentmikl6s has double tracks. It is then single track from Kunszentmiklos-Ki.sVlSrF6s-Kiskanhalas-Jfnoshalma-Bacsaln s to Baja. The line from Baja-Alarony4k-Szekszard-Cece-Pusztaegres is single track. After Pusztaegres it is double track. SEGRET/CONTROL U.S. OFFICIALS ONLY STATE X ARMY X NAVY X AIR X FBI J JAEC (Not.: Washington Distribution Indicated By "X"; Field Distribution By "#".) 21 October 1953 Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2 Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2 SECRET/CONTROL U.S. OFFICIALS ONLY 7. Dunapataj-Baja Line. A new single track railway line is being built on the left bank of the Danube from Dunapataj via Kaloosa-Dusnok to Baja. It is expected to be finished by the end of 1953. 8. Bridge at Baja. The Danube bridge at Baja has not been improved. The bridge is still single track, with a roadbed laid over the railroad track, so that road traffic must be stopped when trains are passing. SECRET/CONTROL - U.B. OFFICIALS ONLY Sanitized Copy Approved for Release 2009/11/23: CIA-RDP80-0081OA002700790004-2