PARCHIM AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002900080002-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
June 30, 2005
Sequence Number: 
2
Case Number: 
Publication Date: 
October 29, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002900080002-0.pdf99.21 KB
Body: 
Approved For Release 2005/07/13 : CIA-RDP80-0081OA002900080002-0 CLASSIFICATION S CRT .VALUATION --j DATE OF CONTENT-j SATE OBTAINED "IEFERENCES- !PAGES REMARKS 25X1 25X1 25X1 25X1 25X1 25X1 25X1 The previously observed boxes were still stored at the field, .o new oxcs soldiers were observed.at the field. J 25X1 1. homment., Since the runway was completed, it is assumed that work at Parchim' airfield.will be terminated in a few weeks. Major 9nirnov who belongs to the Soviet construction headquarters in Werder replaced Captain Berezovchuk who is the Soviet construction supervisor at Parchim airfield. '-?LASSIFICATION REPORT .-J 25X1 1. In late September and early October 1953, work was completed on the runway at Parchim airfield Only the joints between the concrete slabs were being filled Concreting work on the taxiway continued. Powdered prin4; continually arrived at the construction site. It was addressed to the Bate union Spree which stored the print at the site. or Smirnov (Thu) who replaced Captain Berezovchuk (fnu) during his furlough, in late 4 tember., handed over to the construction staff a set of drawings which indicated the areas on the concrete surfaces and on the inside of aircraft revetments wh:%ch were to be provided with camouflage paint in two green colors and one brow-ish shade.1 25X1A 2. In late September and early October Soviet Air Force soldiers unloaded tables, chairs, cupboards, boxes, rifle stands etc, from trucks at the eastern end of the barracks installation. At the same time, personnel, probably assigned to the ec ia end -60o r- up comxnica.tion with the construction sfai"f In Parchim were charged with repair work on the barracks installations, wIc a eg y were to be vacated by the Bauunion and would be occupied by Soviets in the near fu are. SECRET/~ 25X1 Approved For Release 2005/07/13 : CIA-RDP80-0081OA002900080002-0 Approved For Release 2005/07/13 : CIA-RDP80-0081OA002900080002-0 SECRYT 25X1 25X1 2 C ~ Commenter Parchim rir field krill not be occupied by Soviet troops tefore 1 Decemter 1953,, 25X1 3- JConznenta The aircraft crates were observed for the first tiro in the i:eginninr; of September 1953. The date of their arrival has. never been determineda SECR , 25X1 25X1 25X1 Approved For Release 2005/07/13 : CIA-RDP80-0081OA002900080002-0