RECONSTRUCTION OF ROAD BRIDGES AT SWIECIE KOLOBZESKIE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003000070008-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 21, 2016
Document Release Date: 
March 19, 2009
Sequence Number: 
8
Case Number: 
Publication Date: 
December 16, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003000070008-3.pdf48.23 KB
Body: 
Approved For Release 2009/03/19: CIA-RDP80-0081 OA003000070008-3 CENTRAL INTELLIGENCE AGENCY 1 INFORMATION REPORT SECRET/CONTROL-U.S.OFFICIALS ONLY 1. The damaged concrete road bridge in Swiecie Kolobrzeskie (Schwedt-055/MO3) over tie Friedrichsthaler waterway is being dismantled preparatory to reconstruction. The work will take approximately two years to complete and will be carried out by the Rostock-H,ilding Union. 2. The road from the above bridge leads to the River Oder. Here the bridge originally had four spans, two of which were blown up during the war, and which were finally removed from the river to prevent hindrance to navigation. In the spring of 1953, on the Polish side of the Oder, preparations for rebuilding this bridge were observed. SECRET/CONTROL-U.S.OFPICIALS ONLI (Netei Wahlnotn Dhodbuden Indketed ly "X" I Field Dbt-gwWa by a#u,) SUBJECT Reconstruction of Road Bridges at Swiecie Kolobzeskie This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. REPORT DATE DISTR. 16 December 1953 NO. OF PAGES 1 REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF. CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) Approved For Release 2009/03/19: CIA-RDP80-0081 OA003000070008-3