ROAD BRIDGE AND RAILROAD TRACK CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003000810009-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 21, 2016
Document Release Date: 
April 6, 2009
Sequence Number: 
9
Case Number: 
Publication Date: 
December 16, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003000810009-0.pdf462.27 KB
Body: 
Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - U.S. OFFICIALS ONLY COUNTRY Hungary SUBJECT Road, Bridge, and Railroad Track Construction REPORT DATE DISTR. NO. OF PAGES REQUIREMENT REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 25X1 1. Reconstruction of the Railroad Bridge Near Komarom (see Annex 1 a. Reconstruction work on the railroad bridge over the Danube has been pro- ceeding since June 1953. b. The project includes the incorporation of new iron structure bridge spans to be mounted on the old piers. The piers are a remnant of the old bridge which was destroyed during the war. The spans will be of bow- string construction. c. In July 1953 work was proceeding from both banks of the Danube. On the Hungarian side military labor squads were used. On the Czech side political prisoners and internees were employed. d. The target for completion of this work was to be late fall of 1953- 2. Electrification of the Buda-est--Miskolc Main Lines a. The work on the electrification of the double-track main line between Budapest and Miskolc was started again in spring 1953, after having been suspended over a long period. b. By mid-July 1953 the Budapest-Hatvan section was already completed and in use. By this date the work on the first part of the remaining section between Hatvan and F!zesabony was in full swing. 3. Budapest--Pecs Concrete Road. The concrete road from Budapest to Pies, opened up to traffic in summer 1953, was in part a new construction making use of existing roads. The old roads SECRET/CONTROL - U.S. OFFICIALS ONLY 16 December 1953 Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 SECRET/CONTROL - U.S. OFFICIALS ONLY were reinforced and widened and sharp bends were straightened out. The road section in the area of Sztalinvvros is the only one which is an entirely new construction as the old road alignment did not coincide with the plans for the new industrial settlement. Subway Tumael under the Danube ia Budapest. The work on the tunnel under the Danube is said to be so far advanced that the shafts from both hanky have now met under the river. Construction of the Roau from Komi:.' to Hidas. a. At the beginning of s timer 1953 work has been started on the new con- crete road from Komlo to Midas via Ki.sujbanya. This new road will start to the west of Kornic and i_s to lead 'through the Mecsek mountains in a northeastern direction. The road is to follow a mountain valley to the north of ter gdvar and link up the villages of Kisu jb3.nya and 6binya. The northeasterrn end of the road will reach as far as Hidas. This will establish, a connection from Kom14 to the Szeksz~rd --Bonyhat'-Hidas.- 'ecsva ?ad concrete road. . b..: The surveying and align i.r^g work is al ready completed. Along the full length of the road the ,;round is being cleared of tre"is and roots. The wood obtained in these-operations is sent to the mines in Komld. The actual road construction work (earth work) has been in progress since the be sinning of July or., a sector 10 krrx. from Komlo' in the direction of KisujbInya. Co Several road-construction machines arrived in Komlo in May and June 1953. d. At the beginning of July 1953 civilian internees from Szentldrinc and free laborers started work on the section near Komld. In mid-July 1953 a labor battalion arrived at Hidas to begin the construction of the road from the other end. e. Fox, the construction of the many bridges material is to be used which was originally provided for the construction of the Bitasze4-Mohics railroad line which was never completed. f. The new concrete road will not only cross the Meesek mountains from northeast to southwest but will also link up the Szekszard-Pecsvirad main concrete road with the, Komlot-ItaF;yarszek-Macsekpoldske concrete road. 6. Reinforcement of the Budapest-Vienna Highway. l a. During the war many bridges on this road were destroyed. After the war some were rebuilt as permanent structures, while others were replaced by light emergency structures. As this road is being reconstructed for & maximum load capacity of 60 tons, the bridges (including those newly built after the war) are being pulled down and replaced by new strong structures adapted to the new load capacity of 60 tons. b. Some of these new bridges are described as follows; 1.) Some 3 km. to the west of the Budapest-North railroad bridge, and immediately to the southeast of the point where the highway crosses the Budapest-F,SZtergom railroad line, there is a rein- forced concrete water culvert with an inside diameter of approximately 1.5111. (see Annex 2g). This culvert was under construction in April 1953- 2.) On the western outskirts,of Pi:lisvbrdsvdr (exact location not recalled) there is a reinforced concrete bridge over a water culvert. The bridge (see Annex 2a and 2e) rests on two reinforced concrete abutments without a central pier. The bridge beam is of reinforced concrete and contains three longi- tudinal girders. The span of the bridge is 4-5 m. and the' width of the road approximately 6m. The bridge was completed in April 1953. SECRET/CONTROL -? U.S. OFFIC TATS ONLY Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 Approved For Release 2009/04/06: CIA-RDP80-00810A003000810009-0 SECRET/CONTROL o U.S. OFFICIALS ONLY Annex 1. - d Railroad Bridge at Komarom L=end 1. Railroad bridge in the course of reconstruction 2. Road bridge already completed 3. Bomkrom town area h. Komarno town area 5. Komrom railroad station 6. Komarno railroad station 7. Komarne port SECRET /CONTROL v U ,S , OFFICIALS OILY Approved For Release 2009/04/06: CIA-RDP80-00810A003000810009-0 Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 SECRET/CONTROL v U.S. OFFICIALS ONLY Annex 20 rides of the Budar est `V onna Highway SECRET/CONTROL - U.S. OFFICIALS ONLY Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 SECRET/CONTROL o U.S. OFFICIALS ONLY SECRET/CONTROL UT,S,. OFFICIALS ONLY Annex 20 (continued) Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0 SECRET/CONTROL - U.S. OFFICIALS ONLY Annex 2 (continued) _. 7 SECRET/CON?T'ROL .- U.S. OFFICIALS ONLY Approved For Release 2009/04/06: CIA-RDP80-0081 OA003000810009-0