GONIOMETER DIRECTION FINDER DEVELOPMENT AT FUNKWERK KOEPENICK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003300720005-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
November 18, 2002
Sequence Number: 
5
Case Number: 
Publication Date: 
January 26, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003300720005-1.pdf211.27 KB
Body: 
,~ctttc-~Ax ~~ Approved For Release 2005/12/05 : CIA-RDP80-0081OA003300720005-1 CLASSIFICATION : 3Z FT CENTRAL, INTELLIGENCE AGENCY 25X18 POI T NO, WAFORMATION REPORT CD NO COUNTRY East Germany SUBJECT Goniometer Direction Finder Development at F"unkwerk Koepenick PLACE ACQUIRED DATE OF INFO. TN IS DOCI:HBNT CONTAIN" tkFORtIA!1OS AFF5CTIR6 TIIE IiATtONAL D WISE OF THE UN:TED STATES. WI,IM? THE 0@AIIIR6 OF TITLE IS. 0ECTIOrS 799 AIID 796. OF THE U, F. 0000. A& ipttNUtiU. ]13 TRAESVISSION OR RBY9L- ATION OF ITS C0ETENTS 1 OD RECEIPT DT API ITNAUTROSIZEU PERSON IIf PRORI9ITE9 Of LAW TNF R6PROOUCTIOPi OF TIllS FORM IS PROFIFITHD, 25X1 DATE DISTR. 26 Jans.>asry 195z NO. OF PAGES 3 NO. OF ENCLS.. (LISTED BELOW) SUPPLEMENT TO REPORT NO, THIS IS UNEVALUATED INFORMATION 10 Development of a goniometer direction finder (Goniometerpeiler), which was carried out by Department TEE of Funkwerk Koepenick during 25X1 1952 under plan number K2-32, was taken over into the 1953 develop- ment program under plan number K3-40. The goniometer of the instru- ment could not be completely developed during 1952p when the project was carried over to 1953, it was placed under the scientific.-technical supervision of Wilhelm Grimm, with Erler (fnu) as technician in charge. The following are the 1953 plan characteristics of the project: Continuation of the development of a goniometer direction finder (100 to 305 MFz ) Key words Goniometerpeiler Tee raical Characteristics: The sensitivity of a normal receiver with a preset goniometer is not sufficient. Furthermore, develop- ment provides for the construction of a trial model with the following parts: Cross frame9 goniometer, direction finding input connection (Peiiainga.n;rrs schaltung), receiver with four ranges, power supply 24 Volt D.C., power supply 220 Volt A.C. Total cost is to amount to 1109000 DME including 34,000 DME for 1952 and 239000 DME for 1953. Construction of a model and completion of its trial operation by the second quarter 1954 G ASSIFICATION: SECRET S:1VY ~ tvsl3s ~~ DISTRIBUTION. F I1-ivR J# FRI I I Approved For Release 2005/12/05 : CIA-RDP80-0081OA003300720005-1 25X1 Approved For Release 2005/12/05 : CIA-RDP80-0081OA003300720005-1 25X1 25X1 tudienentwurf) for the plan proposed for 1954 Goniometerpeiler: Frequency ran-e- 100 to 2,500 k'Tz.; 2 ~ The re s' a rch project development DF performance: smaller than 50 micro-Volt per meter at plus minus 1,5 kHz band width for one da rroe ninimur. :?:idth at 1,000 meter wave, length .'A ooer, Lion (at L1, "5 5-0 '-,o 530 mil_cro-:'olt per meter) Intermediate frequency: ?0 klrz:. 25X1 25X1 25X1 25X1 b. The gonicmeter for the 7oniometer direction finder had not yet been entirely completed,, Construction of the intermediate and low frequency parts w&s underway. Demodulator studies h. d made it clear tl,:t a cathode de.modul=-.tor ?s.oulc only be of limited use,.. Inothar denodu1 for woul~- probably be necessary. The su -esticr_ stn,:r inn from T`ussne~;er (frru) of the :.'.airs :.dministr