NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

HYDROELECTRIC POWER STATION SPALOV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003400270004-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 21, 2016
Document Release Date: 
April 14, 2009
Sequence Number: 
4
Case Number: 
Publication Date: 
February 4, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003400270004-1.pdf92.04 KB
Body: 
Approved For Release 2009/04/14: CIA-RDP80-0081 OA003400270004-1 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SECRET/CONTROL COUNTRY Czechoslovakia SUBJECT Hydroelectric Power Station, Spalov PLACE ACQUIRED REPORTI DATE DISTR. 4 February 1954 NO. OF PAGES 2 REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. 1. The Elbe River Electric Works (Polabake Elektrarny), National Corporation, hydroelectric plant at Spalov (0 51A 35), southeast of Zelezny Erod9 is located on the Jizera River where it turns at a right angle toward the south. 20 North of the power plant there is a bill 425 meters above sea level which has been planted with trees. South of the power plant is the village of Spalov, for which it was named. 3. The power plant was originally built before World War II; it measures 20 by 50 meters in size and has three turbines. In 1952, the turbines were changed and all the equipment of the plant was modernized, with the result that the plant at the permanent water eason d th 9 ry s e is now capable of supplying power, even in level of the Jizera River. Attached to the station are a sluice and lock gates for regulating the flow of the water. 5,0 The plant supplies power to the entire area of Turnov, the area of Semily, to Horice (0 51/G 62) and to military installations' in the vicinity of Jicin. It also supplies current to the Voksice military camp and the Cerovka station (sic). SECRET/CONTROL - U.S. OFFICIALS ONLY (Note+ We..6inaton Distribution Indicated by "X"; Field Distribution By " "I This Document contains information affecting the Na- tional Defense of the United States. within the mean- ing of Title IS, Sections 793 and 794. of the U.B. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized Person Is prohibited by law. The reproduction of this form 1s prohibited. U.S. OFFICIALS ONLY 25X1 Approved For Release 2009/04/14: CIA-RDP80-0081 OA003400270004-1 Approved For Release 2009/04/14: CIA-RDP80-00810A003400270004-1 SECRET/CONTROL - U.S. OFFICIALS ONLY - 2 - Tae end to sketch 1; Hydroelectric' power station. 2; Railroad line 3e Hill 425 meters above sea level. 4. Spalov, 3roelectric Power Station Spalov SECRET/CONTROL - U.S. OFFICIALS ONLY Approved For Release 2009/04/14: CIA-RDP80-00810A003400270004-1