ROAD CONSTRUCTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A003400390007-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 21, 2016
Document Release Date:
April 23, 2009
Sequence Number:
7
Case Number:
Publication Date:
January 29, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 67.29 KB |
Body:
Approved For Release 2009/04/23: CIA-RDP80-0081 OA003400390007-5
CENTRAI INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONTROL-U.S.OFFICIALS ONLY
COUNTRY Hungary
SUBJECT Road Construction
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT NO. RD
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
The course of the new ig.wqy Lake Balaton Nagykanizsa is as follows: Balaton-
keresztur, S&voly, Komrvaros, Galambok and from Galambok via route 7 to Nagy-
kenizsa. The new highway does not pass through the localities mentioned but
skirts them. The new route rests on a foundation of rocks 45 can. thick; above
there is a bed of gravel 30 cm. thick. The road is surfaced with concrete and
is 12 me wide.
In consideration of the military constructions in the area, the Bud! 'A.keszi-Budaors
road is being reconstructed. The foundation is being laid anew and the road is
being surfaced with the best quality asphalt. Width of the road is 8 in.
3a The Budaors-Torbagy section of route 802 is being resurfaced with concrete.
Widths 8 me
The Sajoszentpeter-Borsod stretch of route 231 is being widened from 7-8 me and
is b?ing resurfaced with the best quality macadam. The resurfacing of the Borsod-
Hidvegardo stretch is to begin in the spring of 19540
5. Route 74 (Veszprlm-Tapolca)-was to have been resurfaced with concrete by the begin-
ning of December'1953e Width: 8 ma
Route 72 (Veszprem-Balatonfred) is being completely reconstructed. Width: 8 me
Surface: concrete. The road does not pass through 0sopak anymore but a new
section has been cut through woods towards Balatonfured.
25 YEAR RE-REVIEW
NAVY
SECRET/CONTROI.U.S.OFFICIALS-ONLY
AIR FBI
(Note: Washington Distribution Indicated By "X"; Field Distribution By
29 January 1954
Approved For Release 2009/04/23: CIA-RDP80-0081 OA003400390007-5