ROAD CONSTRUCTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003400390007-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 21, 2016
Document Release Date: 
April 23, 2009
Sequence Number: 
7
Case Number: 
Publication Date: 
January 29, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003400390007-5.pdf67.29 KB
Body: 
Approved For Release 2009/04/23: CIA-RDP80-0081 OA003400390007-5 CENTRAI INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL-U.S.OFFICIALS ONLY COUNTRY Hungary SUBJECT Road Construction REPORT DATE DISTR. NO. OF PAGES REQUIREMENT NO. RD THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) The course of the new ig.wqy Lake Balaton Nagykanizsa is as follows: Balaton- keresztur, S&voly, Komrvaros, Galambok and from Galambok via route 7 to Nagy- kenizsa. The new highway does not pass through the localities mentioned but skirts them. The new route rests on a foundation of rocks 45 can. thick; above there is a bed of gravel 30 cm. thick. The road is surfaced with concrete and is 12 me wide. In consideration of the military constructions in the area, the Bud! 'A.keszi-Budaors road is being reconstructed. The foundation is being laid anew and the road is being surfaced with the best quality asphalt. Width of the road is 8 in. 3a The Budaors-Torbagy section of route 802 is being resurfaced with concrete. Widths 8 me The Sajoszentpeter-Borsod stretch of route 231 is being widened from 7-8 me and is b?ing resurfaced with the best quality macadam. The resurfacing of the Borsod- Hidvegardo stretch is to begin in the spring of 19540 5. Route 74 (Veszprlm-Tapolca)-was to have been resurfaced with concrete by the begin- ning of December'1953e Width: 8 ma Route 72 (Veszprem-Balatonfred) is being completely reconstructed. Width: 8 me Surface: concrete. The road does not pass through 0sopak anymore but a new section has been cut through woods towards Balatonfured. 25 YEAR RE-REVIEW NAVY SECRET/CONTROI.U.S.OFFICIALS-ONLY AIR FBI (Note: Washington Distribution Indicated By "X"; Field Distribution By 29 January 1954 Approved For Release 2009/04/23: CIA-RDP80-0081 OA003400390007-5