KVP CONSTRUCTION PROJECTS IN THE BERLIN AREA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A003500050005-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 15, 2016
Document Release Date:
October 31, 2003
Sequence Number:
5
Case Number:
Publication Date:
January 5, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 100.09 KB |
Body:
Approved For Release 2003/12/10 : CIA-RDP80-0081OA003500050005-3
COUNTRY
TAT,
EVALUATION 25X1A
LACE O$TAlN~i3.
DATE OF CONTENTS- IQ a
-~-
OA 'E OBTAtNEk -d
REFERENCES 25X1 A
PAGES___.~ ? ENCLOSURES (NO. & TYPE)______,_
25X1X
25X1X
10 On 16 November 1953.
25X1 the west hou3 a of the KVP ca: p at
toss nm was scheduled to be enlarged. The camp is located on Buch?
holzer Stra.see in Berlin- iedersdioenhauaen near the freight statiou'azzd
consists of single-story buildings, temporary buildings, and severs.:. five,,'
story buildings.
25X1X
25X1X
25X1A
20 On 24 November, sections of three prefabricated houses in
the area about 500 meters northwest of the Berlin-Hoppegarten elevated
train station0 As early as October 1953, the site had been inspected and
surveyed by KVP officers. Since October, the site has been cleared of
trees.
30 On 5 December, I the Bau Union Potsdain was to erect 12
temporary buildings for the KV'P in Falkensee. Four of the buildings were
to be set up still In 1953 at a cost of 230,000 eastnarks. Work on the
other buildings was scheduled to be started in January 1954? The order for
the buildings was placed by the Ministry of the Interior.
F____1C_or,njMt& he guard battalion of the HVDVP was previously stationed
at the Gross pampa imp. This is the first information that this corplex
of barracks buildings is scheduled tD be taken over by the 1M. It is still
unknown whether KVP or VP units will use the installations at Berlin-Hoppe
garters and Falkensee0
Approved For Release 2003/12/10 : CIA-RDP80-0081OA003500050005-3
SECRET.
e'0 ACC1r7(t'%AT1Ah1