INFORMATION ON THE CONSTRUCTION OF A KVP AIRFIELD NEAR STRAUSBERG

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A003600720007-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 19, 2016
Document Release Date: 
July 12, 2005
Sequence Number: 
7
Case Number: 
Publication Date: 
January 29, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A003600720007-6.pdf192.28 KB
Body: 
Approved For Release 2006/01/31 : CIA-RDP80100810A00360072000&~ 2 R.,) n CL~SSIFlGATICN..: .._._..REPORT -C;p-C Znforr? tiean on the Constriction of e MIT Airfield Near _ trc usre r ' EVALUATION] DATE OF CONTENT DATE OBTAINED REFERENCES__,_ PAGES 2 ENCLOSURES REMARKS -PLACE OBTAINED . 25X1 25X1 DATF PREPARED._ 29 J Mua?rv 19G. - (NO. & TYPE). 25X1 25X1 at the Berlin Itegionel hE ilroad projecr vo v ng the construction of a railroad connection between Art.usl erg Teich stahnhof :nd : trausberg Stadt was given prl ority,a KVF instep lation, aUegedly= an ordnance depot or ration supply depot, was scheduled to be built in the area t ehinc3 the tra.usberg I,~~ndesjugendhein (provincial youth hostel ), which previously had been used by the Sovietso The completion date for the installation is said to to 1 '::arch 1954, The :tvi e ency in char- of the Project is headed ty Vajor G,anersl Konrad I:F;ierm Construction work will be executed ty the 1E Tiefbau and Lauunion Spreea 2. Petween 15 and 21 Pecember,, 2(0 rai lro,.d. carloads of -construction materials including 12 carloads of railroad ties arrived on the site of Stra.usberg air- field, Construction work for the field had not yet been started. 30 ow wooden buildings were teing constructed in the area of the former airfield at Strausberg. 'A total of 6,500 workers was allegedly 4chcduled to be quartered there. These workers were to be enploye l on the reconstruction of Str;:.usberg t irfie.d. for the M. The elevated train line was to be extended from itrausherg to the airfield, 4,, Petween 3 and 5 Decenter, Strausberg :i rfield was inspected by menbers of the Berlin Designs Pureaua The forner llmd carters tuildi of the vi r was to be reconstructed and enlarged o the airfield was referrt~d to as Project I and given the code mane ee ?ius A was ruiuored that ex-Field I arshal Paulus would set up his head-- quarters at this airfield. Frelininary designs for the reconstruction of this headquarters tuilding were completed on g Decanter. The ;roject was controlled by Lieutenant Colonel Rochlitzer and C