ROAD CONSTRUCTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A003701150007-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
June 3, 2009
Sequence Number:
7
Case Number:
Publication Date:
March 22, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 83.63 KB |
Body:
Approved For Release 2009/06/03: CIA-RDP80-0081 OA003701150007-7
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
1. Rebuilding of Road No. 502,
a, Rebuilding work on the macadamized road No. 502 was started in summer 1953.
This road leads from .Grk8ny via Tat ,razentgy8rgy*-Peszeraiiacs Kunszentmikloa
to Tass and is to be made into a first class concrete road,, about 8 m. wide,
with a maximum load capacity of 60 tons.
b. In September 1953 work was in progress on 6 different stretches. It has-been
heard that work was to be continued uninterruptedly during the entire winter
1953-54 in spite of the unfavorable weather. conditions.
2. Rebuilding of Road No. 51,
In winter 1953-54 the macadamized road No. 50 was to be made into a first class
concrete road with a maximum load capacity of 60 tons. At the end of September
1953 the workers were engaged in the construction and at the same time transports
of material were observed. There were several open air storage depots for material
along the road, which leads from lass via Szalkszentmlrton-Dunaveese-Solt-Harta-
Dunapata j-Kalov sa Dusnok-S1ltkkBsd-Eraekecsan&d to Baja,
3, Rebuilding of Road No. 7,
a. In summer and fall of 1953 the stretch of road No. 7 between Balatonkeresztur:
and Nagykanizsa was made into a first class concrete road with a maximum load
capacity of 60 tons.
b. During the course of 1954 the next stretch of this road, from Nagykanizaa to
Zalaegerszeg, will also be made into a first class concrete road.
Road Construction
SECRET/CONTROL - U.S. OFFICIALS ONLY
This Document contains Information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
REPORT
DATE DISTR.
22 March 1954
NO. OF PAGES 2
REQUIREMENT NO. RD
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
25 YEAR RE-REVIEW
SECRET/CONTROL - U.S. OFFICIALS ONLY
AIR
~ FBI
Approved For Release 2009/06/03: CIA-RDP80-0081 OA003701150007-7
Approved For Release 2009/06/03: CIA-RDP80-00810A003701150007-7
SECRET/CONTROL - U.S. OFFICIALS ONLY
4.
Roads in the Oil Field Area to the South of Zalaegerszeg.
It is planned that during 1954, first class concrete roads with a maximum load
capacity of 60 tons will be built in the oil-field area in Zala County.