HOUSING PROJECTS FOR WORKERS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A003800070004-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 19, 2016
Document Release Date:
April 12, 2006
Sequence Number:
4
Case Number:
Publication Date:
March 17, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 78.57 KB |
Body:
Approved For Release 2006/05/24: CIA-RDP80-0081OA003800070004-9
CENTRAL INTELLIGENCE ..AGENCY
INFORMATION -REPORT
This Document contains a ec ng the a
U th J-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form 1s prohibited.
SECRET/CONTRO1r.T0S.OFFICIAIS ONLY
25X1
25X1
Hungary
Housing Projects for Workers
REPORT NO.
DATE DISTR.
NO. OF PAGES 1
REQUIREMENT NO. RD
REFERENCES
17 Mar cl .1954
1, Housing projects for workers are being erected in the following locations in the
Budapest areas
a. Foundations have been laid for 1,000 housing units at Nagy Lajos Kirily utja
District %N.
The main walls are 38 cm.d, thick and are built of small bricks 25 x 12 x 6 cm.
The plaster is made of lime,, and in several, places an,improved kind of plaster
is used consisting of a 'mixture of cement and lime, Whenever the building is
supported by pillars of reinforced concrete,, the main walls are 25 cm. thick and
are built of hollow bricks 25 x 12 x 12 cm. Partition walls are made of boards
6 to 10 cm. thick. Ceilings are of reinforced concrete girders, prepared before-
hand, and either boards or hollow bricks* The stairs are made of concrete at the
construction sites. The beams above the doors,, windows and other openings are
made of reinforced concrete.. The roofs are built of reinforced concrete and
covered with either tile or slate. There are deal floors in the rooms and artifi?
be Approximately 499 500 units are being erected at the corner of V ci ut and drpid
.ut9 Hjpestg in.Dietrict IV,,
c. Eight hundred units are being built at Csepel.. District KK1.
A. Five hundred units are being constructed at Gyomr9 .ut 25=359:K8b&nya9 District. Y.
vial "mosaic" tile in the bathrooms.
.30 ,One-fifth of the apartments have three rooms,, three fifths have two rooms,, and
one-fifth have one room. The rooms are 15 to 20 sq. m09 the kitchen six square
meters,, the bathroom. three to four square meters,, the ball three to four square
meters, and the storeroom one square meter, Each apartment has electricity,, water,,
and gas.
SECRET/CONTROL-u0S.OFFICIALS ONLY
CMY NAVY X AIR
_Ej
FBI JJAEC
(Note: Washington Distribution Indicated By "X"; Field Distribution 8y "#'".) /
Approved For Release 2006/05/24: CIA-RDP80-0081OA003800070004-9