HIGH TENSION LINE, SZTALINVAROS-PECS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004000680009-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 11, 2009
Sequence Number: 
9
Case Number: 
Publication Date: 
April 27, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004000680009-4.pdf95.46 KB
Body: 
Approved For Release 2009/05/11: CIA-RDP80-0081 OA004000680009-4 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18. Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. 8ORET/CONTROL U. S, OFFICIALS ONLY COUNTRY Hungary SUBJECT High Tension Line , Sztalinv>,ros-Pecs DATE OF INFO. PLACE ACQUIRED REPORT DATE DISTR. NO. OF PAGES REQUIREMENT NO. RD THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 25X1 1. Construction of the $ztalinvLros-Komlo Ploe electric main started in Spring 1952 and was completed as far as Picsvl,rad by Mrs 1953. 2. T}e work wa executed by the I Undertaking for Line Constructions (I.sz. Tavvezetek bpitg Vallalat), while the two branch lines Bonyh.d-Koml6, Vasas- Kom16 were constructed by the III Undertaking. 3. Leading personalities of the I Undertaking for Line Construction are: Director; Vilmos Pajze. Construction Engineer: drprLd Dolesan. Electrical Engineer: Frigyes Engel. 4. Maintenance.of electri?al mains is carried out by the Transmission Line Maintenance Company (Tavvezetek Karbantarto Vallalat) and the Transmission Line Painting Company (Tavvezetek Mazolo' Vallalat). 5. The Sztalinvaros-Komlo-PAcs main forms an integral part of the country's high tension circuit (OrsAgos KorhAlozat). 6. Two types of supporting columns (Stutztrgger) were built, namely, the standard supports on two feet and the so-called span supports on four feet (e.g. at points of change in the alignment), The supports were built into concrete 25 YEAR RE-REVIEW SECR'BT/CONTROL U.S. OFFICIALS ONLY STATE X IARMY I X NAVY X AIR (Note: Washington {)istributien Indketed by "X"t Field Dietribufion by "A" N Approved For Release 2009/05/11: CIA-RDP80-0081 OA004000680009-4 27 April 1954 Approved For Release 2009/05/11: CIA-RDP80-0081 OA004000680009-4 SECRET/CONTROL U.S. 027ICIALS ONLY 25X1 sockets. The former were assembeld from prefabricated units, the finished components for which were delivered from the two factories for light iron constructions 'Kenny! Vasezerkezetek GyAra) in Kiskunfelegyhaza and Kiskunhalas. 7. The line runs in straight alignment, wherever possible avoiding inhabited areas. In cases where single houses were in the way, these were demolished. a. From Sztalinviros in a southerly direction the line runs approximate)' 2 km..west of Dunafoldvar; 6 km. west of Paks; 7 km. off DunaszentgyiSrgy; northwest of Sidagdrd as far as Bonyhad, round which town it passes in the southeast. b. Thence the line follows the road to N4dasd, though changes over at elevation 290 to the south side of the road, continuing there for 2 km. as far as Nagypkl; terminating in the Electricity Works in PIcsujhegy. The capacity of the latter plant has been cons;derably increased, in spite of the fact that in the meantime the Koml power plant (using coke gas) has been constructed. 8. The line between Sztalinv~ros and Bonyhad is already in operation and several transformer stations have been switched in. 9. The following branch lines run from the Sztalinve,ros-Bonyhad main: a. to S ,rbogard and Retszilas b. to Dunaf o ldvgr c. to Paks 10. At Bonyhad there are two branches, one to Komlo and another to Mohacs. SNORET/CONTROL U.S. OFFICIALS ONLY Approved For Release 2009/05/11: CIA-RDP80-0081 OA004000680009-4