AUTOPAL, NATIONAL ENTERPRISE, NOVY JICIN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004100930003-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 2, 2010
Sequence Number: 
3
Case Number: 
Publication Date: 
July 15, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004100930003-1.pdf396.26 KB
Body: 
Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - U.S.. OFFICIALS ONLY COUNTRY Czechoslovakia SUBJECT Autopal, National Enterprise, Novy Jicin DATE OF INFO. REPORT DATE DISTR. NO..,OF PAGES REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 15 July 1954 1. The plant of Autopal, National E1terprise,is located, north of Novy Jicin (P5o/646) on the main road to Pribor, Along the road the factory is enclosed by a plank fence 1.5 meter high, and, on the other side by a concrete wall two meters high with barbed, wire on top. 2,. Of a total of 750 workers in the factory, about 250 are women. The factory works three shifts; no brigad.e workers 9r prisoners are employed, here. The factory produced the following: a. Headlights for motor vehicles, abowt 7,000 per month; b. Radiators for tractors, 200 per month; c. Radiators for Skoda trucks, 200 per month; d. Radiators for tanks,.. 250 per month (see separate desdript:on and sketch); e I. 3 s about 1,.000 per month, The Five-Year Plan is being fulfilled.90%, on the average. 25X1 A tinsmith earned. about 1,000 Kcs, net monthly; a foreman, about 1,500. The manager's monthly salary is 3,500 Kcs. net, Management: General Manager: Jaroslav Sommer. Technical"manager: Miroslav Kirich. Chairman of the works council: Kunz Head of the pressi Security official: (fnu). ng workshop: Jan Matous Horak (fnu) Deputy chairman of the works council: Macicek (fnu) SECRET/CONTROL U.S. OFFICIALS ONLY 25 YEAR RE-REVIEW Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 SECRET /CONTROL - U.S. OFFICIALS ONLY - 2 - In dartime the factory is guarded by three gatekeepers and during the tight by two watchmen, accompanied by a dog. All are members of the factory militia 8. The working morale in the factory can be called very low. Workmen are chiefly dissatisfied with their low wages and the very high norms. The following political organizations exist in the lant: The Communist Party branch; the Youth Association SCM); and the SYI 1. All of -them'~have political indoctrination lectures for their members, once or twice a week and lasting 1ne to two hours. 104 a. Military vehicles storage: storehouses for military vehicles are located in the vicinity of the tinsmith shop. servicemen unloading Praga cars and Jawa-250 motorcycles. The storehouses are guarded by two soldiers who are on duty in the guardroom and one solider who patrols in the yard.. They carry pistols. b.' Radiators for tanks: Radiator casings are made of 3 mm. thick sheets of rust-resisting metal. The measurements are 150 cm. long, 80 cm. high and. 15 cm. wide. There are some 200 cooling pipes in four rows made of 0.5 mm. thick brass attached to the tanks. The horizontal radiating flange is also made of brass 0.5 mm. thick. The distance between flanges is 2 mm. There is no difference between the upper and lower parts and, the radiator, may be turned upside rl? m,-. &,,.usbd?,5n either position. Legend. to the sketh'h of the Autopal Factory at Novy aLdin: 1. Guardroom. 2. Offices, two-story building, 30 x 8 meters. 3. Canteen, " T, " , 30 x 10 meters. 4. Sheet metal stores; a:15 m, b^20m, c-10, d^6; two-storyu. 5. Chimney. 6. Shipping department, 1 x 5 meters. 7p Tool shop, 20 x 10 meters. 8... Maintenance shop, two-stnry~ , 15 x 6 meters, 9.. Greenhouse and truck garden] l0'.. Pressing shop, two-story i, 16,x 15 meters. .,71. Galvanizing shop under construction., expected to be completed this rear,. twos-story4t, 20 x 10 meters. 12. Gara es with the following vehicles: two Tatra (3,5 tons), one tractor, one trapla,n, one Tatra 57a. 13. A vi is which belonged to the owner of the factor and has been turn d.into the factory creche, twois1oryli, 15 x 8 meters. 14. Guam- om.. 15.. Tins' th store (for production of radiators), 16. Tinsmith and turning shop, 20 x 15 meters.. 17. Pond.. Military vehicles st age: 18, Garages and storehouses, 15 x 7 meters. 19. 10 x 6 meters. 2C.' 80 x 15 meters. 21. Wooden storehouses and. garages, 15 x 4 meters. 22. Guardroom.: Legend to sketches of the pressing shops of the Autopal plant: 1. Storeroom for the pressing shop. 2. Lavatories. 3. Lavatories. 1, Sheet metal, storeroom:, 5. Pressing shop. 6. Galvanizing shop with 10 basins.. 7. Machinery center for hydraulic presses. 8. Small Vblishing shop. SECRET/CONTROL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 SECREWCONTROL - U.S. OFFICIALS ONLY 9. Large polishing shop. 10. Controls department for polishing shops. 11, Galvanizing shop with 8 basins. l2. Finished. products storeroom. 13. Corridors leab-ing to the elevator. 14. Office of 'the head of the pressing shop. 15. Pressing shop. 16. Workshop where finished chrome-plated casings are cleaned with gasoline and trichloride. 17. Transformer. 18. Elevator. 19. Twd3lve presses, capacity 40 cm. 20. Three straightening machines to straighten radiator casing. 21. Electric annealing kiln, 2 meters long, 1,5 meters wide. 22, Hydraulic press ('ritz Mueller-Ealingen)1, 6 meters high, 3 meters wide, Capacity unknown. 23. Six presses, capacity 20 am. 240: Four power hammers. 25. Four drawing presses, capacity 40 cmy pressure 30 to 40 tons. 26. Compressor for the hydraulic press. 2 . auxiliary, 25. Container for compressed. air for the hydraulic press. 29. Automatic machine, operating a hydraulic press. 30. Five buffing wheels for metal-polishing. 31, Five buffing wheels for ; tal-polishing which may also be used, as grinders. 32. Twelve presses, capacity 20 to 30 cm,: 33. Two straightening machines, one slicing lathe for cutting off edges of limps which have come out of the presses. 2rd.a 1. 2. 3, 4. 5. 60. 7 p. 8, 9P 10, ill, Off ice a Lavatories. Basement; 1. Lavatories 2. Storeroom for various material. 3.-5: Cloakrooms. 6. Cleing shop where paint is removed from badly sprayed lamps, by means of compressed air. 7.. Factory militia storeroom (rifles,. SMG and ammunition - quantities unknown). $. Elevator. 9. Boilerhouse with three boilers 2 meters long and 1 1/2 mP highs Drawing rooms and planning dept. Assembly shop for lamps. Storeroom for finished. lamps . Riveting shop, Technical manager a s office Varnishing shop. Silver-plating shop (lamp glass). Technical office Elevator. Enclosure-. Map se~:ti.on (Air) Possibly Esslingen is meant. SECRET/CONTROL U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 SECRET/CONTROL - U.S. OFFICIALS ONLY SECRET/CONTROL -U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-00810A004100930003-1 SECRET/CONTROL - U.S. OFFICIALS ONLY 5- Pressing shops of the Autopal Plant (11oa 10 on plant sketch) SECRET/CONTROL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-00810A004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 SECRET/CONTROL - U. S. OFFICIALS ONLY J-1 [Ij [fill-] 1,50 cm Tank, radiator SECRET/CONIlR.OL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100930003-1