BRIDGES ACROSS THE DANUBE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004500900007-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 20, 2016
Document Release Date:
June 19, 2007
Sequence Number:
7
Case Number:
Publication Date:
October 8, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A004500900007-9.pdf | 212.27 KB |
Body:
Approved For Release 2007/06/19: CIA-RDP80-0081 OA004500900007-9
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
638714
Thiimlteriai contains information effecting tbi no..
Hoist Define of the United antes within she meRn-
tng of the Ispionege Laws. Title L3. U.S.C. Sea. 730
and 734. the transmission or reveIstion of which in
any manner to an unauthorised person Is prohibited
by law.
SECRET/CONTROL-U.S.OFFICIALS ONLY
COUNTRY
SUBJECT
DATE OF INFO.
PLACE ACQUIRED
Hungary/Czechoslovakia
Bridges Across the banube
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT NO.
THE SOURCE AVALUATIONS IN THIS REPORT ARE DEPINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
Komirom Hi hwav Bridr*e.
a. The Kom&roni highway bridge across the Dip Danube is 314m. long-'and 1012-t,
wide, of steel construction. The centra roadway is 6r.'- m, wide. The two
sidewalks on each side'of the roads-ray are two meters wide each. The trusses
are located between the roadway and the sidewalks. The bridge rests on three
masonry piers and rises 15 in, from the apex of the arch to the level of the
river. The pavement of the roadway and of the sidewalks consists of seasoned
beech planks coveredwith tar. The section of the bridge over the shipyard
peninsula is 100 in. long, and rests on steel piers from 3.5 to 4 1n. above
groundo
b, The small bridge across: the Winter Harbor is 51 in, long and has the so-called
Kasetten construction without arches or piers. The pavement of this section
is made of.beech planks. There is no weight limitation on the section across
the Big. Danube, over the'-peninsti.la, and across the Winter Harbor, and the
entire.bridge can be crossed by tanks,
2, Komarom Railroad Bridre,
a, The railroad bridge, which.crossea over into Czech territory near the Honostor
fortress, is still under construction. This bridge likewise rests on three
piers, but it is 35 to 4Q m. longer than the highway bridge,
b. This bridge is being constructed-joint
ly by the Hungarians and the Czechs.
The three piers have already been completed, The section that runs from the
shore to the second pier has been constructed by the Hungarians, The third
pier has been built by the Czechs. This bridge was to be completed by May
1954.
SECRET/CONTROL-U.S.OFF"ICIALS ONLY
s!ATE X ARMY x NAVY AIR PSI AEC
VOTEI Waehinaton distribution indkaled by "X" i Pl W dismbuoon by
8 October 1954
4
25X1
Approved For Release 2007/06/19: CIA-RDP80-00810A004500900007-9
Approved For Release 2007/06/19: CIA-RDP80-00810A004500900007-9
3. Esztergom Highway Br e
.This bridge is practically of the same length and type as the bridge across the
Big Danube at Komarom.
.Annexes: 1. Position of the highway bridge at Komi rom (1 page).
SECRET/CONTROL-U.S.OFFICIALS ONLY
SECR..'/CONTROL-U.S.OFFICIALS ONLY
Approved For Release 2007/06/19: CIA-RDP80-00810A004500900007-9
2. Sketch of the highway bridge at Kom&rom (1 page).
Approved For Release 2007/06/19: CIA-RDP80-0081 OA004500900007-9
SECRET/'U.S.OFFICIALS ONLY
N
-3-
SECRET/j.S.OFFICIALS ONLY
Approved For Release 2007/06/19: CIA-RDP80-0081 OA004500900007-9
Position of H ighway Bra at
Komarom
Approved For Release 2007/06/19: CIA-RDP80-00810A004500900007-
S ,CIUI1'/u.S.OFFICIA 3-( y
Approved For Release 2007/06/19: CIA-RDP80-0081 OA004500900007-9