KVP INSTALLATION AT STRAUSBERG AIRFIELD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004600230007-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 20, 2016
Document Release Date:
August 29, 2007
Sequence Number:
7
Case Number:
Publication Date:
July 9, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 96.36 KB |
Body:
r Approved For Release 2007/08/29: CIA-RDP80-0081 OA004600230007-2
#*TE OF coin
DATE QBTAUIE0
REF'S
1. Most of the building at 8travabarg airfield were destroyed after
the and of the at but ware being rebuilt is May and Jame 19%.
The construction project is subdivided into section Ia and Ib.
AU buildings of section Ia have bass designed as perasmrat
struct . Section lb adjoins auction Ia to the writ and southwest.
A total of 10 buildings had been completed so far. Only little
construction work has been done so far at this site. A farmer
hangar was repaired in a makeshift way and another one we
scheduled to be oonwrted into a motor vehicle garage.
2. The following information as available on the intended utilisation
of the UP buildings at the airfield: Building 2 gatrtered an
advance detail of about 60 man of a signal unit. The soldiers
are yellow service color and vwo led by Lieutenant Sehuls (fou).
The weapon steno ream in build, Ike 4 for which Major Sohuls
(Inf) was respondb.e was scheduled to be put into operation
on 10 June. iieutenuat General Rat2Maaun ties definitely
expected to move into ?aa wing of building No 6. A total of
12D sedans were parked now one of the farmer hangars at the site
of section Ib.
For layout of the UP installation at Strausberg
Cuero s>cas1
1 Guardhouse
2 Two-story building; purpose unknown. Two transmitting towers
each 30 meters higb.and with as output of 90 EVA, were
scheduled to be erected vast of this building.
3 Headquarters building, throe stay stroature
4 Tires-story building; purpose >uulalMnx
W Basement earmarked to sere as weapons stock room
5 Two-story building; purpose uukWwn
6a to e Three-story buildings
6f Single-story building
7 HO shop
8 Heating plant
9 Three-story building; purpose unknown
10 Porter's lodge.
Approved For Release 2007/08/29 : CIA-RDP80-0081OA004600230007-2
Srx;nEr7
Buildings at.STRAUSBEBG Airfield
brick wall, 2.2 meters high
board fence
pale fence
reconditioned and reconstructed buildings
SJEMS
25X1
25X1
Approved For Release 2007/08/29 : CIA-RDP80-0081OA004600230007-2
MEMO=
Buildings.at.STRAUSBERG.Airfield
.......
brick wall, 2.2 meters high
board fence
pale fence
reconditioned and reconstructed buildings
newly constructed buildings
25X1
25X1
For le rend, see next page
Approved For Release 2007/08/29 : CIA-RDP80-0081OA004600230007-2