CONSTRUCTION PROJECTS OF THE DEUTSCHE REICHSBAHN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004600640004-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 20, 2016
Document Release Date: 
August 7, 2007
Sequence Number: 
4
Case Number: 
Publication Date: 
September 10, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004600640004-0.pdf40.64 KB
Body: 
INFORMATION REPORT This material contains information affecting the Na- tional Defense of the United States within the mean- Ing of the Espionage Yaws. Title 18. U.S.C. Secs. 793 and 794, the transmission or revelation of which In any manner to an unauthorlead person is prohibited by law. . Construction Projects of the Deutsche DATE DISTR. 10 3eptombo 1954 THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 1. Railroad construction work in East Germany of priority importance, such as the construction of the new switching yard at Cottbus and projects in Guben and Goerlitz, cannot be completed in the forseeable future because of a shortage of necessary materials. The greatest shortages are those of switches, ties, gas and water pipes and cable of all kinds. 2. In order to relieve the shortage of railroad ties, a plant for the production of special concrete ties (Baton-Spannschwellen) is to be erected as quickly an possible in Rehfisch, Mecklenburg. However, construction is not progressing be- cause of the lack of materiel and specialized workers. The plant is to fill the tie requirements for all of East Germany. The safety of the lines in East Ger- many, aside from the main lines to the'East, is endangered because of the poor condition of the ties. 3. The most important railroad construction project is a switch installation (Wei- chenwerk) which has been begun near Kirchmoeser, in Brandenburg. The plant stands on the site: formerly occunied by the Kireh*+nnner ammunition eeetory, near the Reichsbahn repair plant. ' I 4. Construction is being carried out on a first priority basis at the new transit switching yard in Frankfurt/Oder on a building 70 meters wide which is to house Soviet railroad personnel. Right next to this building a new signalling device (Stellwerk) is being built for the transit Ttation. STATE X ARMY f IX NAVY X AIR X F9I AEC NO. OF PAGES REQUIREMENT NO. RD REFERENCES 64090b