1. SUPPLY SITUATION AT THE ROSELAU SHIPYARD 2. CONSTRUCTION OF DREDGES FOR POLAND
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004900300010-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
June 25, 2007
Sequence Number:
10
Case Number:
Publication Date:
March 20, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A004900300010-7.pdf | 119.04 KB |
Body:
COUNTRY
SUBJECT ?
PLACE
ACQUIRED
DATE OF
INFO..
,....,..A.,...."2.-..L??.,.... ? ,
. 1 TINS ISOCUT.IIIiiZOUTAM-... 4 r7...rarts.-:c..-.2. re. !:...?G 72 CIA7 11-?:.::::;:
SF Wm UMSED STATES. 1.7aTillil VHE 03A;19".?,%": .:: ?1:1.3 93.rs:-...c711 IC' ,
,-1.-1V 7011: 0' MS U. S. CODU. AS AMMO ID. :.'S TRASS991SEACift 02 IlUVUi. ,
.1 S 9rtaalcs4r3ip Dv ism 'ME .QUPnoaucsion c ,Tui 3 fOrn3 Is PizotimiTgo. !.:,...,.
Of; ,ss cour3ors ir OD Itete.IPT UV ,,r) U 1/101790:21ZUD Parlsora
I
. ..,
'?'7'Z:27
Approved ForRelease2007/06/25 : CIA-RDP80-00810A004900300010-7
4.4.//'? I r1/412
CENTRAL INTELLIGENCE AGENCY
ht
FO ro' NATION ?.1E00
Bast Garmany/Polaml
SuApily Sltuation at the Rosolau Shipyard
Constrlttion of IVedges for Poland
This is UNEVALUATED
REPOR1
CD NO.
DATE DISTR. 28 October 1.554
NO. OF PAGES 1
NO. OF ENCLS.,
tUSTED BELOW;
SUPPLEMENT TO
REPORT NO.
7S SU.?" 'ALUATED Ni7.070,1AT 10 M
late Pizrob ',14o dredges nd three motor cargo vesals were on
the building v.:Ape of the SP.,hii-swerft Rooslau (Esslau Shipyard).
Work on these 'Aresels proceeded at a slow pace beause of the shortage
of bateriaa? Ti.le last of the dradgesv whiclh uas destined ?
for Poland.wai scheduled to be almost entirely n.:?:_lesigned t Polish
request.
2. The ent,ito production of the sh4gard was o be changed over to
light: metal construction in :955c Repairs to Elbe aiver tugboats were
also pianned.
3. In April 1934, he materia). 4uply conditions at 7,he shipyard bad ?
improved to a certain extent pas transports constantly arrived from
the USSR. Xron sheets 7 Iraa q113k, were the asin supply its.
4. The. Construtiuz of refrigeratei drifters at the nosslau Shipyagd bas
scheduled, .,.?s bugla by 1 July 1934 ater:dal Y2ded had not yet
arrived -at the yard by late JILII) 1954, although WI Schifftcau (Shipbuilding
Wain AdminLotrlition) had informA thp yard that the material allegedly
had been on tho uay for four welks.
5. In: late Jnd 15)549 ix of the tlYmn seagoing dTedgea were nearing i.oiapletion
at the Peenewe5,ft in Wolgaot I Juns 19549 a PolLsh governnent 60MiniegiODI
had reiUsed to because it was of the opinion that.
the foundatLont.. or,3p.s enw.no ulit :lerw too weak and because the
shipyard. rusoti t0t. c'onstrne. re;la foundations to strengthen
themes ti= Poles derria.m2GC
CLASSIR
AIR ,Vzsi NSPB
FBi
;V:R16:3TION
11
Approved For Release 2007/06/25: CIA-RDP80-00810A004900300010-7
25X1
25X1
25X1
25X1
25X1m
Approved For Release 2007/06/25: CIA-RDP80-00810A004900300010-7
Approved For Release 2007/06/25: CIA-RDP80-00810A004900300010-7