MISCELLANEOUS DANUBE SHIPPING INFORMATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A005500350013-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 21, 2016
Sequence Number:
13
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 91.31 KB |
Body:
Approved For Release 2008/04/09: CIA-RDP80-0081 OA005500350013-2
CLASSIFICATION SECI'T
CENTRAL INTELLIGENCE AGE REPORT
IP4VOR 1TIO REPORT CD NO.
l~ustr. isjHungaryCOUNTRY /Rumania
SUBJECT I iscella.neous Danube Shipping Information
ACQUIRED
DATE OF
INFO.
THIS DOCUMENT CONTAINS INFOR}4ATUON AFFECTING THE NATIOIIBU, ENSB.
OF THE UNITED STATES. WITHIN THE MEANING OF TITLE IS. S$CTI 793
AND 754. OF THE U. S. CODE. AS AMENDED. ITS TRANSMISSION OeL-
ATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED Oft"M
IS PROHIBITED BY LAW THE REPRODUCTION OF THIS FORM IS PRON1WIYRD.
DATE DISTR. 17 December 1954
NO. OF PAGES
NO. OF ENCLS.
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
1. The railroad bridge which is under constructiea at Ujpest near Budapest is ab25X1
one-third completed.
2. At the kilometer marker 1658 above Ujpest, construction work on the naval harbor
has come to a standstill.
3. The railroad bridge which is under construction across the Danube at Komarno,
Czechoslovakia, is nearly two-thirds completed.
4. Korneuburg Shi d Information. On 25 September 1954, the SDGP MIS LENINGRAD
picked up a newly complete p ledriver at the Korneuburg shipyards for towing
downriver to the Soviet Union;
5. On 28 Se a SDGP MIS LENINGRAD picked up a newly completed Black
Sea bear t the Korn bura yards for t win downriver. Two
additional barges of the same type,7 a completed and at
anchor at Korneuburg. The keels of two more such barges have already been laid.
6. The Black Sea barge is under construction at Korneuburg. As soon
as it is completed, the keels w bi
Soviet SDGP.
\10RulSf114aV 1/1 P14
7. The SDGP vec { r the Bayrische-Lloyd vessel BARN,
is nearing coe:ple Austria, shipyards. The hull and
superstructure are almost finished.
8. The Soviet DDSG vessel MOSKVA is scheduled to be launched on 22 December :L954 at
the Korneuburg shipyards.
9. The SDGP vessel CHARKOV is scheduled to be completed and .make its trial run within
two months. The vessel is the former MF'TR ship TURAN, a steamship tugboat, side-
wheeler, of 1800 horsepower.
10. The Rumanian SRT vessel TALINN is on the ways at the Korneuburg shipyards where it
will be rebuilt as a passenger vessel for Rumanian waters. .
1-1
no to r o erational nt for a general
X NAVY
ARMY
Approved For Release 2008/04/09: CIA-RDP80-0081 OA005500350013-2
Approved For Release 2008/04/09: CIA-RDP80-0081 OA005500350013-2
Approved For Release 2008/04/09: CIA-RDP80-0081 OA005500350013-2