RAILROAD CONSTRUCTION PROJECTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A005700490006-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 22, 2016
Document Release Date:
August 23, 2010
Sequence Number:
6
Case Number:
Publication Date:
March 29, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A005700490006-3.pdf | 310.24 KB |
Body:
~~X1-HUM
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80-00810A005700490006-3
COUNTRY East Germany
SUBJECT Railroad Construction Projects
PLACE
ACQUIRED
DATE OF
INFO.
TNif DOCYNtNT CONTAI Nf INFORMATION AFFfCTINf TNf NATIONAL D[FtNft
OF TNf YNITfD fTATff, NITMIN TNf 1fANINf 01 TITL[ /f, ftCT10Nf 7ff
AMD 7f1, O- TN! D. f. CODE. Af ANtN D[f. 1$ TRANfNIfftON ON RtYfl-
ATION O/ ITf CONT[NTf TO OR ffCfiFT fT AN ONAbTNORt2fD F[RfON
If FNONIfITff H LAN TNf NfTf~ftlCT10N OF TNif FffN ID FNONIfITLD.
for 1954: 50X1-HUM
DATE DISTR. 2y March 1955
N0. OF PAGES ~ S-
SUPPLEMENT TO
REPORT N0.
THIS IS UNEVALUATED INFORMATION
the execution of the following railroad construction projec;ts was planned
Project
Manufacture of 500 type 00 cars
Manufacture of 300 type GGs cars
l~ianufacture of 50 steam locomotives
Manufacture of 6 experimental steam locomotives
(presumably coal-dust firing locomotives)
Reconditioning of 347 passenger cars
Improvement of Leipzig railroad station
Reconditioning of permanent waif .
Berlin Circuity 3rd construction stage
(Birkenwerder - Wustdrmark rail~~p?ad line) 3
Karow - Wuhlheide railroad line'F
Rerouting of S-.Hahn line at Stra berg 5
Halle -Magdeburg rail~ad line
Oebistelde check point
Dispatch installations ~
Bgandenburg railroad power station
Electrification program
about 17
1
"
10
1
"
21
2
II
4
2
"
10, 5
1
"
3
"
51
"
20
3
"
5
4
"
2
5
"
3
6
"
8
7
"
9
8
14
9
"
36
Cost of Project
(in Million ~;a.stmarks)
Railroad technical school at '~resden
g.5
Railroad technical school at Erfurt
4,g
Tunnel at Leipzig main railroad station ~~
2
Concrete works at Rethwisch ~ "
1
10
INFORMATIQPI REPORT cD NO.
CENTRAL INTELLIGENCE AQ1~CY REPC3q~t1
2. A total of about 460 million eastmarkl! is to be invested in 1955. In detail
this sum is to be spent as follows:
a, Main Installations
Rolling stock
Replacement of rails and ties
gat off' line c~~~t,Y
CLASSIFICATION' S E C R E T
465,852,000 eastmarks including;
about 96 million eastmarke
" 53 ?
d KQ II
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80-00810A005700490006-3
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80-00810A005700490006-3
50X1-HUM
Electric inst?llations
Safety
Signal communication plants
Railroad stations
I~:is ce llane ous
b. Auxiliary In:;tallatiors
lei "
32 "
12 "
13,265,000 east.%arks
About 40 mialion~eastrnas~- s
" 13
(Social welfare, health, cultural, affairs, snort, etc,)
c. Reserve
?,'c;2,000 eastrr~ks 11
In late October 1954, it was learned that the single-track Wriezen-
-Jae~ickendorf railroad line which crosses the Oder River and which wt:.s
50X1-HUM
dismantled at the end of the war will be rebuiltb RBD Berlin will be ~.n
charge of the ?rlriezen -Alt Ruednitz section which included the railroad
bridge over the Oder River, the roadbed was still essentially intact on
this stretch but the bridge must be completely rebuilto The bridge which
will have to be 350 meters long, is scheduled to be rebuilt as a stee]_
structure resting on concrete ;piers. Concreting week on the bridge had been
under way for some tin^ie, but track laying work had begun only recently. It
was expected that the T~lriezen -Alt P.uednitz section of the railroad 1_ine
including the railroad bridge would be eom~~leted in about the sprint; of 1-`~5.
Iv8 inform~~tion was available on construction work on the Polish s~cti.on of
the line involved. l2
4. The single-track elevated railroad line between Berlin a nd Bernau
double-tracked between Pankow and Blankenburg in 195
ready been made, The project will be
~era.te on this line section every 10
ly operate every 40 minutes between 3Iankenrnrrg - SenoeriYhauser
ee - s ~ and Stadtbahn, and every ?0 minutes between 91ank~;n~tzrg -
- ~,~esundbrtulnen and Stadtbahn. The construction of a second track between
31ar;kenburg 1 maces every 5 minutes.13
'fork on the electrification of the Berlin r~:ilrc~ a circuit bet~,aee.~ Bl
A su:n o!' ^0 million eastmarks has been made availahle fo.r ~~he completion i.n
1;55 of the Nordring Berlin near 'd~asterma.rk. Thi;~ ,,ro ject '~ ravolves t:is
construction of single-track rail links to a,' joining r
'nui~:in~ O ~. r.-il.ro~~.i? o`~r;rp;~s~, rat this Cr%,.S;i1" ;.~ .11`1ilr.ec, for l'S5.
1, ~. In late October ]_c;~5'~, ~?~or;