CONSTRUCTION OF BATAK-DEBRASHTITSA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A005700640007-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
December 5, 2007
Sequence Number:
7
Case Number:
Publication Date:
January 17, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 65.46 KB |
Body:
Approved For Release 2007/12/05: CIA-RDP80-0081 OA005700640007-5
C A-L 1111104ILLIGENCE m1NCY
INFORMATION REPORT
CONFIDl11TIAL
Tom n.MMW $mt.m. IM1w..ws 8010 016 No Ub_
Swas as Mas-
and ZMAIM W S.
on a OW IIa& am Me
a" "A. a go" In
MY ~M[ M .a NMi r swRMMNR
brim.
COUNTRY Dulgaria m-ll
SUIJUCT Construction of Batak-Debrasiltitsa DAlI DISTR. 17 January 1955
Vy**-electric Plant
DATE Of INFO.
FLACK ACQ~
This is UNEVALUATED
Information
NO. Of PAM
NO. 25X1
TM[ 1OtiC1 NAWAMONs NO wsS ?OM Aaf NP NITNS.
TMs AWRAMAL OF C01 11 4 TMAM
not on asT
1. In accordance with the plan for the electrification of Bulgaria, a hydro-electric
power project is in the process of construction between Batak (N 41-57, E 24-11),
Peshtera Okoliya, and'Debrashtitsa (N 42-05, E 24-15), Pazardshik Okoliya. Work
on the project began in 1953 and is scheduled for completion in 1958. An unknown
number of Trudovaks and civilian workers are employed on the project.
2. The Batak-Debrashtitsa hydro-electric power project will consist of a canal system
from Ratak to Debrashtitsa, three dawn with hydro-electric power plants,land an
artificial lake at Batak.
3. One of the dams and electric-generating plants will be constructed in the vicinity
of Batak, another at a point five to six kilometers southwest of Peshtera, and the
third in the vicinity of Debrashtitsa. The dam and power plant at Ratak will be
the largest of the three.
The artificial lake, 15 kilometers long and seven to eight kilometers wide, will be
formed back of the Ratak dam on the latak plateau, and will be fed by streams in the
vicinity and by water from the Vasil tolarov dam, 40 kilometers southwest of Peshtera.
Water from the Vasil Rolarov dam, completed in 1952, will be brought to the Ratak dam
through a tunnel.
5. The canal system for the Batak-Debrashtitsa project will consist partly of open canals
and partly of tunnels. In the suer of 1954, construction of the tunnels was in
progress.
Comment: According to labotnicheako Delo, 13 July 1954, the three power
stations o the atak power system, are the a VETS (Hydroelectric Power Station)
the "Pe$hterra" VETS, .and the NAleko" PETS.
25X1