INVESTIGATION OF THE CAPACITY OF ELECTRIC POWER INSTALLATIONS BY ORDER OF MINISTER FRITZ SELBMANN
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A005900550005-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 21, 2016
Document Release Date:
February 27, 2008
Sequence Number:
5
Case Number:
Publication Date:
March 14, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 107.71 KB |
Body:
Approved For Release 2008/02/27: CIA-RDP80-0081 OA005900550005-5
CLASSIFICATION ,_.
CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION REPORT CD NO
DATEE .
SUBJECT Investij;ation NO (S 1
Power Insta]lations by order of 11rister
Fritz 3e1bnn
PLACE
ACQUIRED
DATE OF
INFO.
NO, OF ENCLS. .
MS 40 OW
SUPPLEMENT TO
REPO
THIS DOCUMENT COITTAIB3 INFONNATION A-V[CTINN THE NATIONAL DEFENSE
OF THE UNITED SINTER. WITNIR THE NEARING OF TITLE TS. SECTIONS 793
AND 774 OF THE S. S. 0001. AS AMENDED ITS TRANSMISSION 02 NEVEL-
ATION OF ITS CONTENTS TO OR RECEIPT BY AN URAUTHORIZED PERSON
IS PNONISIT99 ST LAW THE REPRODUCTION OF THIS FORM IS PROHIBITER
THIS IS UNEVALUATED INFORMATION
In late November 1954, a technical conference was held at the UL
Llektroener ie (:Lain Administraf:ion for ::lectvic : ,er y) of the
;iinistry of Heavy Industry in East Berlin. At this conference, it 25X1
was announced, that, by verbal order of ::ii,ister Fritz Selbmann,
capacity checks will be made by a s ec'all of ted
at R11 er ih4lde '?!!?' III' rek'l,Toeaerg
2. It was b.1-Lmvl Nl t 1W*Mc aV4d `-ott
an exoassive'x.*tl *achinery.
for most of t?- tI*repairs. r
by flood dot tti ` I
Approved For Release 2008/02/27: CIA-RDP80-0081 OA005900550005-5
Approved For Release 2008/02/27: CIA-RDP80-0081 OA005900550005-5
CLASSIFICATION SECRET
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
COUNTRY East Germalay_
SUBJECT
PLACE
ACQUIRED
DATE OF
INFO.
was announced, that, b
cppacity checks will b
at all enterprises of
THIS DOCUMENT CONTAINS INFOMA710N AfFEC11M Till 04VIOMAL OIflil$l
OF Till SNITID STATIS. WITHIN Till MAMA OS 1T Ll /S. $1011011 11*
AND 714. OF Till S. S. CODE. AS AMEMDE1. ITS TNAMSNI/M0110Na01SN?'
ATION OF ITS COMTENTS TO 01 1/0E1-T OF AN 0NAIT11 O PIANO!
IS MIOMISITID 111 4M INS x..01 tNil 1~;$1?A1M1'lil~,
}rlektroenergie (Main Air tion for Electric Energy) of the
Fritz Selbmann
Investigation of the Capacity of Electric
Power Installations by order of Minister
REPORT
CD NO.
DATE DISTR.
14 March 1955
NO. OF PAGES
1
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
1. 1* b ^Ir~rM . 1lf46 a twOnI esi wt.. JI sr he" at U0 AL
fast Berlin. At this conference, it
rder of Minister Fritz Selbmann,
a specially appointed commission
onnergie. It was assumed that
production quotaSwill be raised in the near future.
2. It was believed t creased output can only be achieved by
an excessive stra machinery. There was no material available
for most of the T ?epairs. Further difficulties were caused
by flood damage in 954.
STATE
ARMY
CLASSIFICATION
SECRET
NAVY X NSRB I I DISTRIBUTION
AIR X FBI I I I
- Approved For Release 2008/02/27: CIA-RDP80-0081 OA005900550005-5