1. INFORMATION ON DALSTROY 2. URANIUM MINING IN THE LAZO AREA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A006100770002-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 21, 2016
Document Release Date: 
July 18, 2008
Sequence Number: 
2
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A006100770002-1.pdf132.76 KB
Body: 
Approved For Release 2008/07/18: CIA-RDP80-00810A006100770002-1 CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of wT ich in any manner to an unauthorized person is prohibited by law. COUNTRY USSR (Magad an Oblast) REPORT SUBJECT 1, Information on Dalstro 2. Uranium Mining in the y' DATE DISTR. Lazo Area NO OF PAGES . 25X1 REQUIREMEN 25X1 REFERENCES Area 1. The entire Kolyma refion was under.Dalstroyo the headquarters of which was in Khabarovsk (sic). There were recruitment officers in many cities. Administration 2. Dalstroy was connected with the MVD. On many papers the sign (sic)---MVD. On other papers he saw the sign of Dalstroy inscribed in a hexagon. It looked like this: ,.W- u~~cc:~ura.ces under Laistroy: a. Southwestern Directorate (Yugo-zap&1dnoye upravleniye), the head- quarters of which was in Seymchan.(N 62-53, E 152-26). Lazo (N 63- 13, E 152-10) was under this directorate. b. Central Directorate (Tsentralnoye upravleniye), the headquarters of which was in Yagodnyy (N 62-33, E 149-40), C. Northern Directorate (Severnoye upzavleniye), (Note: Washington distribution indicated by "X"; field distribution by 25X1 I 11 Approved For Release 2008/07/18: CIA-RDP80-00810A006100770002-1 Approved For Release 2008/07/18: CIA-RDP80-0081 OA006100770002-1 d. Indigirka Directorate, the headquarters of which was in Indigirka. 4. In regard to prison camp administration, following organization: a. So cr uthwes iminal tern Camps (YuzlagtYugo-zapad prisoners in Seymchan, Elgen nyye lageri), which Ugol (N 62-54, E 1 handled 51-46), an d La b. Co pr zo. astal isoner Camps (BerlagBeregovyye lage s in the same area. ri), which handled politica l c. Us vitlag . 25X1 it handled forced labor until 1950, when t he crim in als 25X1 an d. Fo la d the rced l borers po t cal prisoners were sepa abor (katorzhaniya /aic1) 2. in Elgen (N 62-48,"'2 150-44) rated. There were groups o and Butugychak (N f forced 61-19, 5 14 9- 11 ) to w hich this title applied. The se prisoners were l ocked in th eir ba rracks after each day's labor . Miscellaneous Information. 5. 6. 8. Dalstroy disseminated a great deal of propaganda all over the USSR. After World Var II, one of the chiefs of Dalstroy was Lieutenant General Ivan Feodorovich Nikishov.3 one harbor on the Kolyma River. It was called Zaryanskiy 25X1 (sic) and was located north of Seymchan. At Zaryanskiy, there was a camp for political prisoners, who were moved to Lazo in 1951, A new wolfram and uranium mine was opened in 1952 near Medvedka, 12 km from Pyatiletka (N 62-18, 1 151-27). ployed there for about six months, and th Political prisoners were em- en they were replaced by cri- minal prisoners. In 1952, very little wo rk had been done there; there was only one tunnel, which was about 20 m long. it 25X1 was common talk among the workers that ur anium anduaolfram were mined there, 25X1 At Pyatiletka there was a small cassiteri te mine, which was worked by criminals and free workers. The ore was processed in the Second Factory. At Camp Chapaye+v, located three kilometers from the Third Factory, there was also a small cassiterite mine and the beginning of a uranium mine. 9. From Pyatiletka to Camp Chapayev, there were two telephone lines and one power cable of finger-thickness. 10. The road from Lazo to Seymchan was as wide as the main highway from Seymchan to Magadan (N 59-34, 5 150-48). It was a dirt road with room for three trucks side by side, In winter, it was kept open by snow plows when there was up to one meter of snow. When there was more snow, the machines cleared the frozen river, which was smoothe 25X1 25X1 Approved For Release 2008/07/18: CIA-RDP80-0081 OA006100770002-1 Approved For Release 2008/07/18: CIA-RDP80-0081 OA006100770002-1 two airport 3 - 25X1 25X1 25X1 s, at Seynchan and at Magadan., C,~auwe,~. 1. The headquarters of Daistroy is in Magadan. 2. This is probably gatoxzhantikt9 trudoyoy lager - $TL (.hard labor camp). 3, Aikishov was recalled to Moscow in 1946 and re- tired because of Dals~troy's nonofulfillment of its production plans. Approved For Release 2008/07/18: CIA-RDP80-0081 OA006100770002-1