CONSTRUCTION OF DAM AND POWER STATION NEAR DOBSINA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A006200610008-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 21, 2016
Document Release Date: 
August 6, 2008
Sequence Number: 
8
Case Number: 
Publication Date: 
April 8, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A006200610008-1.pdf273.84 KB
Body: 
Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 dOm QEpOQ` CENTRAL, INTELLIGENCE Construction of Dam and Power Station near fobsinm; M H aC pOo Qir This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. S- -C*-R-E-T NOFORN COUNTRY Czechoslovakia DATE OF INFO. PLACE ACQUIRED DATE ACQUIRED GENCY 8 April 1955 NO. OF PAGES 5 REQUIREMENT NO. RD REFERENCES SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. 1. A dam and power project is located about four kilometers north of Dobsins. (N 48/49, E 20-22), near the village of Dedinky, which will be partially flooded by the newly formed lake. It is close to the ,ystrica r,ai oadb Mssgecany=Cervena Skala-Banska ~ 2. In the summer months, the flow of water from t4e Hnilec River into the main reservoir is very low, When the area is supplied with current by other power stations, the water from the reservoir at the power.=station dam is therefore to be pumped back to the main reservoir. It is not known hot? this is to be-done, 3. The construction is being carried out by Hydrostav, National Enterprise, Bratislava. The construction was begun sometime in 1949 and was to have been finished sometime in 1952., but has been held.up by.a shortage of labor. Because of this the gum allowed for the construction has long been spent and new funds have to be granted. At this rate the project will perhaps be finished by 6, in spite of the fact that work has been largely mechanized. The turbines for the power station have been su lied ~~ Cement is brought from Lietavska Lucka by rail. The origin of the iron material being used is not known. Stone comes from the quarry made by blasting the hillside for the small stretch of railroad line which is being relaid by 'Dystavba Rudnych Bani (VP- __~~i'ioe Development) in the dam area, Two inspectors from the CSD (Czechoslo- vak State Railroads) in Kosice are in charge of this construction. 4. About 600 persons are working on construction of the dam, of whom 400 are permanent employees and 200 are brigade workers, such as students who come for one month and employees of other enterprises who come for two or three months. There are about 40 women, most of- them in'the offices.. The majority of the permanent workers are former tradesmen, independent farmers (kulaks), and craftsmen., who were sent to the construction by the Labor Exchange after being deprived of their property. A 48-hour week is worked.,, with three.shifts. S-E-C--E-T NOFORN AIR X I FBI 'I I AEC I I (Note: Washington distribution indicated by MFOOQMQIOOII REPOOQ1 OHFOQMQf0OH REPORT 25X1 25X1 25X1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 S-&C-R=EST NOFORN - 2 .: 5. Management: a. Sleza one of the managers at the construction of the Orava Dam. b. Pnainaar in nhsirrte of mechanizing the coristruction- Josef Jancek,, 25X1 25X1 rhi?Pf of eonstruction of the lower part of the dams Eng,. Ve,ji (fnu), gout of constriietion (wee attaeheed .skketch N,o., 1): 1., Dam,, near the hamlet of Dedinky. 2. Probab3o,.extent of lake, when completely flooded., 3. Railroad line,,,, new stretch on a raised eixibankment, ~+. Tunnel-, for taking water to the power station. 5. Auxiliary pumping station at about the middle of the tunnel. 6. Bu ldirg containing turbines and dynamos., 7. switctju* station 8. Small auxiliary dam, through which water drains off into.Dobsina brook., 9. Channel to drain water from the small dam into the brook. Description of construction ~1,4@ sketch No. 2): 1. Part of constructiso not yet completed, where the dam has to be sunk into the bank;. So far it has only been dug out, and concreting of the bottom has begun.. 2. Portion of dam already completed with concrete blocks rising to the full height of the dam. 3. Block concreted to Drily half the height of the dami 4. auildi'ng site where faundations are now being prepared for concreting. The whole dam (Nos. 1-4)- is about 120 m~ ;long. At the base,, `.it is 10 m, wide,, and at the top. about 4 m. The height will be about 15 m.,? and it is to extend about 2 m., above the surface. 5. Old railroad line,; which will be flooded when the construction is com- expert on geological niechanic,s, was in charge of the construction of this filtering em)ankment. pieted,. New railroad line,. now under c action. The new section will be about three .kilometers lang. The upper surface of the new railroad embankment will have space for a doable track. It is about five to six meters above the level of the old one,. Special embankment' for the new railroad line, made of crushed rocky to enable water from the reservoir to, seep through. This water will form another small lake on the southwest side of the dam._ The whole embankment is about 300 in. long;. The water is to seep through about 150 m. Prof. Jalovec of the' Prague Technical Building Colleges an 8. Boundary of the artificial la"ke N.oF,ORN 25X1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 N WORN 3. 8a, Limit which the water has, already reached.. Tho vemainder of the water is partly let out through the dam construction, sites and partly pumped up. by the turbines. Pumping station and arrangements for shutting off the 4ay. into. the canal. This is a faro-concrete construction 3.0 x 5 mo and 7 I no and is the main pumping station which.,suupplies,water. to.the canal leading to the power station. The apparatus is probably of Czech Origin* 9a. Canals, real,. rtkroough which waterr is brought from the ,lake at the dam to ., the p ion, about four kilometers away (face distance),' disaster about 220 cm. It is not known of what material the walls are made. About fl&U the tunnel runs horizontally, the next part is slightly inclined and-the last part drops .considerably so as to speed up the. flow of water. The gradients ,ere not known. 10.. Power station with two turbines.., Nundber of dynamos not known. ,:. Building is concrete, 40 x .20 m.y. 10 m. high., :11. Switching station. A..concrete building, 30 x 20 ma k 10 a. .high. OOnt,the south side of the. building is a space with pylons. 12.. Embankment for holding water after it leaves the turbine.. About 80 m, long the base' 10 mi. wide,, and' the top 5 m. Height about 15 Z. 13. Small lake formed' by the dam., about 200 m. long and 150 nt, wide. lk. Canal from the lake to Dobsina brook.. 15. New road still under constructiono, on hilly',ground., 'The old road is to be flooded. 16. Railroad bridge over the newroadt Iron, about 14 m...longj on cone Crete bases O, the aides: of the road., SEC-R-E+T NOFORN 25X1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 4-C-R-F-T NOPORN 4 Sketch NO .l. Dam and Purer Statjaa near.Ddbsina Bede 1;75,000 'B=E?C-A-B-T NOFORN . Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1 S'-E-C-R-E-T NOFORN -5- Sketch No. 2 NIVI~ cZF Qa It\ S-E-C-R-E-T NOFORN Dam and Power Station near Dobsina Not to scale Approved For Release 2008/08/06: CIA-RDP80-0081 OA006200610008-1