Approved For Release 2008/04/01: CIA-RDP80-0081 OA006300040010-0
INFORMATION REPORT
B-R-C-R-E-T
NOFCitN
25 March 1955
DATE OF INFO.
Eastern Germany
Information on the Trattendorf Power
Station
This material coaoias Informs ion aINtinR the Na-
tiooai Defeats of the Ualod soon within the meaa-
Ing of the iplmsss Laws, Tltio 1$, U.S.C. Secs. 7YS
and 'MS, the sr.Nal"m or mvsiasloa of which In
may manner to an uosutLorissd parson is prohibited
bylaw.
REPORT
DATE 015W
NO. OF PAO S
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE AFMAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
The scheduled date for the start of the turbine operation at Trattendorf,
1
was met only by using every available pair of hands. The turbine ran on 17 December
for exactly twenty-five minutes. The entire structure was built on a
temporary basis and will have to be entirely reconstructed for the
actual permanent operation of the turbine, which is expected to start in
late February 1955.
2. The first running of the turbine was filmed by representatives of DEPA.
B-R-C-R-E-T