INSULATION MATERIALS FACTORY BUCHAREST

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A006400160011-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 21, 2016
Document Release Date: 
August 1, 2008
Sequence Number: 
11
Case Number: 
Publication Date: 
March 31, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A006400160011-5.pdf116.57 KB
Body: 
Approved For Release 2008/08/01: CIA-RDP80-00810A006400160011-5 11 q 111 . ? . . ? . ? . ? . a I'M I ? . CENTRAL INTELLIGENCE AGENCY 1 hi, material contalu6 information affecting the National Defense of the United States within the meaning of the Espionage Lawn. Titir ;8 1' SC Secs. 793 and 794. the transmission or revelation of which in any manner to an unauthorized person is prohibited by law DATE OF INFO. PLACE ACQUIRED DATE ACQUIRED Insulation I;aterials Jtucharest REPORT 31 :arch 19 REQUIREMENT NO, RD REFERENCES DATE DISTR. NO. OF PAGES the following is a legend for the attached sketch of the Insulation ::aterials Factory, located on Ctrada Obor, Bucharest: A. 3uilding, about 70 by 6 meters, divided into the following units: 1. 1:achi.ne shop: 23 to 30 people are employed in this shop. It has the following equinnient: 8 lathes, including one turret lathe; old machinery but in good working order; two to three vertical drills; and one forge operated on fuel oil. 2. Electricians' shop: four employees for servicing the power plant of the factory. Insulating cork plate unit: about 40 employees. L~. J arehouse for finished material. r. Warehouse for storage of raw material. 3. ;:ethane gas supply center: 3 by 3 meters, C. .Nnployees' messhall; one-story building, 25 by 8 meters. There is a first aid station in the same building. D. Nursery : about 20 'rr 1: r.~eterc. Three girls and a civilian doctor are assigned here to oversee and aid the children. 3, building, about 12 by 6 meters, divided as follows: 1. r'ffixe of the Labor Union Corund.ttee: consisting of three e,::p1o1%ee:s deal with labor disputes among the workers. 2. Trade section. 3. Factory guards NAVY AIR Note: Washington distribution indicated by "X"; field d istri butiai by >7` Approved For Release 2008/08/01: CIA-RDP80-00810A006400160011-5 Approved For Release 2008/08/01: CIA-RDP80-0081 OA006400160011-5 Tiro-story building, 50 by 60 by 10 meters, divided as follows: 1. Ground floor: cork grind section equipped with an electric nrocessing? machine . Second floor: cork drying root:; AN or seven employees.. 2. Ground floor: shop for the manufacture of cork and bite en co.:r ,uld . Second floor: cork storage; o:iplcys about 20 people 3. Furnaces for cork; five to six employees. 1;.. Oven for bricks; enploy: seven or eight people. Unit for making refractory bricks; eight or nine emplcr,red.. 6. Unit for ::faking insulators for pipes made of pressed 1il::e ~.nd #;T;psu. ; eight to ten employees. Three-stor,r building, 1;0 to 50 by 12 meters, divided into the following units: 1. Ground floor: general storage room for materials used in the factory such as cloth and cotton. 2. Ground floor: management offices. 3. Ground floor: meeting hall used for political lectures, etc. The second floors of 1, 2 and. 3 are used for the manufacture of in- sulators made of asbestos, lead, hemp, and hemp and lead; 20 to 30 women are employed in this cork. The third floors of 1, 2, and 3 are used for the storage of raw materials. T':xee-story building, about 1}0 by 12 meters, divided as follows: round floor: sorting unit for bottle stoppers Second and third floors: unit producing bottle stoppers; about 150 women Approved For Release 2008/08/01: CIA-RDP80-0081 OA006400160011-5 Approved For Release 2008/08/01: CIA-RDP80-0081 OA006400160011-5 Insulation i-aterials Factor., Bucharest Wo?dEd I1r~rcI M Approved For Release 2008/08/01: CIA-RDP80-0081 OA006400160011-5