Approved For Release 2008/03/20: CIA-RDP80-0081 OA006500070008-8
CENTRAL INTELLIGENCE AGENCY
This matmW ooatatne lnfa,m.poa .laetllt! tba No-
ttanai Dafm= of the United /MOs wlthfa the meaa-
ins of the iplooate Laws. Title it. U.B.C. ft". 7IS
and M. the toatmudm or revelation of which in
w manger to an unautl.rlod 1ar.oa L peohthtM
by law.
INFORMATION REPORT
REPORT
Electrification of the Wejherowo-Tozew
Railroad Line
DATE DISTR.
NO. OF PAQES 2
REQUIREMENT NO. RD
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
15 June 1955
25X1
1. The sector of the Wejherowo (K 54-36, E 18-14) -Tczew (N 54-06,
E 18-.L8) railroad line from Gdynia to Gdansk (Danzig) has been
completed. The line is now in commission.
2. The following work has been completed on the 11-kilometer sector
between Gdansk and Pruszcz (N 51i.-16, E 18-38):
a. The original embankment has been widened on the east side
so that it can take four railroad tracks, two for steam-
driven trains and two for electric trains. The vo rk of
building the new embankment was done by the SP (Service
for Poland).
b. A second railroad bridge across the Radunia River has
been built at Sw. Wojciech. It is very near the old bridge but
is quite separate. The new bridge is 10 meters long
and is made of reinforced concrete. It has three piles,
one of which is in mid-river, and is built li to 2 meters
above the water.
c. Posts for carrying electric cables are erected along the
old tracks; the work was carried out by teams of railroad
men. When the line goes into commission the electric
trains will run along the old tracks and the steam trains
along the new.
Approved For Release 2008/03/20: CIA-RDP80-0081 OA006500070008-8
3.
4.
Approved For Release 2008/03/20: CIA-RDP80-0081 OA006500070008-8
The only -m rk done on the 21-kilometer sector
between Pruszcz and Tozew has been the moving
of the railroad telegraph line.
No work has been carried out at the Pruszcz
railroad station. Nor has work been done at
the passenger stops between Gdansk and Pruszcz
to adapt them to electric train traffic.