CURRENT SMV DRILLING AND PIPELINE CONSTRUCTION WORK

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A006600170003-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Document Release Date: 
January 10, 2008
Sequence Number: 
3
Case Number: 
Publication Date: 
May 12, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A006600170003-1.pdf84.43 KB
Body: 
Approved For Release 2008/01/10: CIA-RDP80-0081OA006600170003-1 ULA5SII-IUAIIUIv S-E-C-R-E-T CENTRAL INTELLIGENCE AGENCY REPORT INFORMATION REPORT CD NO. COUNTRY Austria SUBJECT Current SMV Drilling and Pipeline Construction Work PLACE ACQUIRED DATE OF INFO. THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18. SECTIONS 793 AND 794, OF THE U. S. CODE. AS AMENDED. ITS TRANSMISSION OR REVEL- ATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW THE REPRODUCTION OF THIS FORM IS PROHIBITED. DATE DISTR. 12 May 1955 NO. OF PAGES o'IL? NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. rAS IS UNEVALUATED INFORMATION 5X1 been conducting near Rabensburg, Lower Austria, oil has been discovered which yielded up to 22 percent gasoline in a siaSle-dist'illation process.1 2 More extensive test drillings are planned to i*~ at-,better estimates tof the 25X1 productivity and size of the Eabensburg net;.` 2. As of 4 March, four of he planned 22 two drilling rigs were in operation 3. All of the pipe for the oil line which is to be laid from Bockfliess to Moosbierbaum is produced in Czechoslovakia dnd will be transported to Austria by Czech personnel ?4 SMV is already planning an extension of the Moosbierbaum-Bockfliess pipe line. This extension would continue t e line from Bockfliess via Auersthal to to Prottes-Schoenkirchen and would add an adlditional 16 kilometers. This part 25X1 25X1 omment. .The exact location of the various drilling points in the Rabensburg\ area was reported Sinee then, most Vienna news- 25X1 papers have carried a story about the total loss through fire of drilling tower number one on 23 February. Comment. Thee normal, gasoline content of oil is about 10 percent. in the Fischamend area. on 4 March, the Central Warehouse at Neusiedl received 12 sets of spare parts for turbo drilling units type T 12 M 1 - 8". During the 25X1 following week, an additional six 8" and ten 12" tutbe drilling units with the6r spare parts were expected to arrive from the Soviet Union by rail. and not for the Fischamend test drilling area. Jomment. The 22 turbo-drill rigs are presumably for the entire SW 25X1 X X CLASSIFICATION X NSRB DISTRIE3 Ix I FBI I I Approved For Release 2008/01/10: CIA-RDP80-0081OA006600170003-1 Approved For Release 2008/01/10: CIA-RDP80-0081OA006600170003-1 Approved For Release 2008/01/10: CIA-RDP80-0081OA006600170003-1