WOLFSBEHRINGEN AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A007000030007-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 21, 2016
Document Release Date: 
September 3, 2008
Sequence Number: 
7
Case Number: 
Publication Date: 
May 5, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A007000030007-7.pdf129 KB
Body: 
Approved For Release 2008/09/03: CIA-RDP80-00810A007000030007-7 ' COUNTRY, TOPIC, EVALUATION, DATE OF CONTENT. PLACE OBTAINED) DATE OBTAINED) REFERENCES PAGES 2 ENCLOSURES (NO. & TYPE) REMARKS REPORT DATE PREPARED 5 May 1955 ' 25X1 1. Status of Construction Work C AWICAT Past Germany Wolfsbehringen Airfield Construction at Wolfsbehringen airfield near Eisenach, project No 541, 25X1 had still not been resumed. Concreting work could not be continued because of unfavorable weather. The workers had been sent home until further notice and received 60 percent of their wages during that period. In 1954, a portion of the runway, 200 meters long and 48 meters wide was concreted. The first results during the winter indicated that the gravel layer on the field would have to be reinformed to a thickness of 30 cm. This additional work and the setting of an earlier completion date induced the construction headquarters to order work in three shifts during the next construction period. According to orders from 'Herder, the project was to be completed by late November 1955. It was believed at Bauunion Sued that work had to be accelerated because the field was to be occupied immediately after completion. A total of 500 workers were to be employed on each shift upon resumption of construction. It appeared difficult to hire this number of workers in the Wol:ftbehringen area. On 7 and 8 March, about 600 men were employed at the construction site, 540 of whom had been earlier sent home until further notice. These workers probably returned to the field after the completion of the frost period. The concrete road which was being constructed from the road to Haina had been included in the budget by the Soviets. The road construction had been started by the construction headquarters to establish a paved supply road. The plan had later been approved by the Soviets and the road was scheduled to be widened from 4 to 8 meters and extended &s far as the Eisenach-Gross-Behringen road, thus establishing approach roads (from Hama and Eisenach) to the field also for futute use. In February, 46 gasoline containers each with a capacity of 10,000 liters had been delivered and stored in the area of the Wolfsbehringen construction year yard. As of 8 March, it had not yet been learned as to where the fuel dump would be constructed. No difficulties were expected to arise in connection with the runway construction. There were difficulties being experiences,, wever, in connection with the drainage. The drainage water 25X1 has to be conducted to the Neese River. Seventy-five percent of the work on 25X1 the concrete steps down the slope to the Nesse were completed. Since the CLASSIFICATION SECRET Approved For Release 2008/09/03: CIA-RDP80-00810A007000030007-7 Approved For Release 2008/09/03: CIA-RDP80-0081 OA007000030007-7 Nesse has a mud layer, about 1 meter thick, it was necessary to construct a concreted water collector below that layer in the River. Bauunion Sued also feared that funds for this secondary work might be arbitrarily curtailed. While on 30 September 1954, the construction site ad a surplus of 118,000 eastmarks, on 31 December, there was 11111111,01116W O00 eastmarks which was mainly due to the . !Z e b out 400,000 eastmarks. Construction supervisor Zo transferred to the central office of the Bauunion '3tie'd at Dresden because of poor health. He was replaced by Engineer Schoenfelder. For the same reason, the commercial manager was transferred to Goerlitz and was replaced by Haase (fnu). It was repeatedly heard, that after the completion of the project at Wolfsbehringen, two other projects were allegedly to be constructed in the Gotha-Eisenach - Nordhausen area. It appeared that preparatory measures were already underway for these projects. The labor force at Wolfsbehringen was allegedly to be employed for a construction project at Langansalza. Since it was also rumored that the machinery was to be employed there, it was inferred that another airfield was possibly scheduled for construction. 2. Two hundred workers of Bauunion Sued were transferred from Strausberg to Wolfsbehringen. Most of them were untrained workers. Comment. The status of construction work described in the present report is probably not up to date. The target date for the completion of the field in November 1955 is reported for the first time. 25X1 25X1 25X1 25X1 Approved For Release 2008/09/03: CIA-RDP80-0081 OA007000030007-7