PRELIMINARY PROJECT FOR A MARITIME HARBOR ON THE GREIFSWALD LAGOON
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A007600610002-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
November 7, 2007
Sequence Number:
2
Case Number:
Publication Date:
September 6, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 48.64 KB |
Body:
Approved For Release 2007/11/07: CIA-RDP80-0081 OA007600610002-2
I~LHJJIrII~HIIUIV ?~-nrv-a-r,-1
CENTRAL I..I LLI L Ut AU.tN REPORT
INFORMATION REPORT CD NO.
COUNTRY East Germany
SUBJECT Preliminary Project for a Maritime
Harbor on the Greifswald Lagoon
ACQUIRED
DATE OF
INFO.
THIN DOQUCIENT CONTAINS INPORNATION AP!U1INSTHE NATIONAL DEFENSE
OF THE UMITRD STATES WITHIN THE NMANSMI OP THE ESPIONAGE ACT NO
U. R. C.. 71 AND SS. AN AMENOND. ITS TRANSMISSION OR THE REVELATION
OF ITS CONTENTS IN AMT MANNER TO AN UNAUTHORIZED PERSON IN PRO.
11 01D, NY LAW AE-RONUCTIOW OF TNN PORN IN PROHIBITED.
DATE DISTR. 6 September 1955
NO. OF PAGES 1 25X1
NO. OF ENCLS
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
In an attempt to find a suitable place for the construction of a
maritime harbor, a project was developed providing for the construction
of an entirely new harbor located at the mouth of the Ziese River
& wt of Greifswald at the south end of the Greifawalder Bodden (lagoon).
Two harbor basins, each 150 meters long, were planned as the first stage
of construction. Railroad connection from Greifswald was scheduled. An
appropriate north-south channel would have to be dredged through the
Greifswalder Bodden for this purpose. This is a preliminary project in
its first stage.
X NAVY DISTRl TM
Approved For Release 2007/11/07: CIA-RDP80-0081 OA007600610002-2
Approved For Release 2007/11/07: CIA-RDP80-0081 OA007600610002-2
Approved For Release 2007/11/07: CIA-RDP80-0081 OA007600610002-2