PROPOSED 1956 CONSTUCTION PLAN OF VEB FARBENFABRIK WOLFEN
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A008600880001-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 21, 2016
Document Release Date:
June 2, 2008
Sequence Number:
1
Case Number:
Publication Date:
December 23, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A008600880001-3.pdf | 77.97 KB |
Body:
Approved For Release 2008/06/02 : CIA-RDP80-0081 OA008600880001-3
M FORMAf 0ON REPO R
MFOQMA
CENTRAL " IY[ U:UGENC[ AGENCY
M H REPO
RV
This matorlol contain Information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title
10. U.S.D. Saco. 793 and 704, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law.
S-E-C-R-E-T
COUNTRY East Germany
SUBJECT Proposed 1956 Construction
Plan of VEB Farbenfabrik
Wolfen
DATE Ofd 8 '4 O.
PLACE AC(MIRED
DATE ACQUORED
REPORT
DATE DISTR. 23 December 1955 25X1
NO. OF PAGES 2
REQUIREMENT NO. RD
REFERENCES
The following is an undated list of proposed construction at VEB Farben
fabrik Wolfen during 1956:
Main Installations
Invested Funds
thousa d
1. Lime-ammonia-saltpeter(Kalk-Ammon-Salpeter)
Ammonia oxidation, furnace construction
87
Absorption - ? and blower. (Endgeblaese)
403
Mixing salt (Mischsalz).
22
2.
ramie
Bui
Rai
ldings
l facilities
2660
Cis
tern
189
Dee
p well: (Tiefb
runnen)
54
3.
Pha
rma2
Pow
er, streets, s
team, wate
r
]g00
onro bu
ild~~igs, sor
"corriotx ction~,wor
k
627
535
4.
Wel
l water works
III
350
5.
Phy
sical, security
Work guard
(Arbeitsschutz)
400
Plant guard
(Betriebsschutz)
20
Fire guard
(Brandschutz)
200
Other measures ;'
100
M R EPOQ
Approved For Release 2008/06/02 : CIA-RDP80-0081 OA008600880001-3
Approved For Release 2008/06/02 : CIA-RDP80-0081 OA008600880001-3
S-E-C-R-E-T
Additional Plants:
Thousand DME
1. Social buildin
g for local personnel
197
2. Gynecologic cl
inic (hospital)
800
3. Remote heating
plant
267
4. Instruments fo
5. Apprentice liv
r the hospital
ing quarters
377
6. Pionier camp,
Parchim
290
7. House construc
tion
1,058
Comment: The control figures have received preliminary approval
from the Main Administration for Heavy Chemistry. A final approval
of the plan, as presented here, may be expected.
Comment: The invested funds listed under "Pharma" are for build-
ings previously dismantled. It is possible that the reconstruction
of these buildings will take several years.
25X1
25X1 ,,/
Approved For Release 2008/06/02 : CIA-RDP80-0081 OA008600880001-3