BRIDGES AND PROPOSED CONSTRUCTION AT NOVISAD/ AMMUNITION DEPOT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00926A003400040028-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 20, 2016
Document Release Date:
September 14, 2006
Sequence Number:
28
Case Number:
Publication Date:
September 29, 2003
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 190.05 KB |
Body:
CLASSIFICATION CONFIDENTIAL/US OFFICIALS ONLY
CENTRAL INTELLIGENCE AGENCY 25X1 REPORT
INFORMATION REPORT CD NO.
Approved For Release 2007/10/23: CIA-RDP80-00926AO03400040028-1
COUNTRY Yugoslavia
es and Proposed Construction at Novisad/
Ammunition Depot
25X1
ACQUIRED
DATE
ACQU I RE,D
DATE OF INFORMATION
I THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE
OF THE UNITED STATES WITHIN THE MEANING OF THE ESPIONAGE ACT SO
U. S. C.. 3I AND 32, AS AMENDED. ITS TRANSMISSION OR THE REVELATION
OF ITS CONTENTS IN ANY MANNER TO AN UNAUTHORIZED PERSON IS PRO-
HIBITED BY LAW. REPRODUCTION OF THIS FORM IS PROHIBITED.
being made by Army engineers
had not yet been restored. In 19+8 plans for reconstructing the bridge were
the Danube River9 Most Kpaljevica Tomislava
Zeleznicki Most (the Railroad Bridge). Originally intended only for railroads,
it was also carrying automobile, truck and foot traffic. The other bridge over
DATE DISTR. /p May 195
NO. OF PAGES 1
NO. OF ENCLS.
(LISTED BELOW) (A)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
Zone bridge was in use, the
25X1
2. A third bridge was being planned across the Danube River north of the other two.
25X1 Near the approach to the new bridge on the northwest bank of the river, a concen-
tration of factories for, heavy industry was being planned.
3. The hill near tlae Petrovaradin Dunav station has been converted into an ammunition
depot. The hill is full of caves about two to four meters high. Into them walls
have been built to shore up the sides. The hill is about 700 to 800 meters high.
Good roads have been constructed to lead to the top and the caves lead off the
roads into the hill. Most of the work of construction was performed by forced
labor, but the actual delivery and storage of the ammunition is performed by
soldiors. The combined capacity of all the caves would be about 1500 peopleo~
All kinds of war materiel, e.g. ammunition, guns, gasoline, etc., has been stored
4. At the foot of the hill, just south of the Railroad Bridge, is an anchorage for
river boats. Some of the materiel for storage was transported via river boat and
unloaded at this docks
ENCLOSURE (A): Map showing bridges and proposed bridge over Danube River; also planned (
location of heavy industries and hill of caves
. CLASSIFICATION COFFIDENTIAL/US OFFICIALS ONLY
),'STATE NAVY
ARMY AIR
Approved For Release 2007/10/23: CIA-RDP80-00926AO03400040028-1
CONFIDENTIAL/US OFFICIALS ONLY
CONFIDENTIAL/US OFFICIALS ONLY
Approved For Release 2007/10/23: CIA-RDP80-00926AO03400040028-1
iVo%,5 rD
Scdo;.Ie I ; Io,oCO
Approved For Release 2007/10/23: CIA-RDP80-00926AO03400040028-1
.,", q rNo
Ivy