DESCRIPTION OF PORT OF MUCURIPE, FORTALEZA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00926A003800030003-6
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
June 8, 2004
Sequence Number:
3
Case Number:
Publication Date:
August 2, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 110.85 KB |
Body:
.j .25 I,
Appro qEg N 20'T -RDP80-00926A003800 30003-6
-CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION'. REPORT
COUNTRY Brazil
SUBJECT Description of Fort of Mucuripe, Fortaleza
25X1
PLACE
ACQUIRED
ACQUIRED
DATE OF INFORMATION
THIS DOCUMENT CONTAINS INFORMATION AFFECTING THE NATIONAL DEFENSE
OF THE UNITED STATES WITHIN THE MEANING OF THE ESPIONAGE ACT $0
U. S. C.. 31 AND 32. AS AMENDED. ITS TRANSMISSION OR THE REVELATION
OF ITS CONTENTS IN ANY MANNER TO AN UNAUTHORIZED PERSON IS PRO-
HIEITED BT LAW. REPRODUCTION OF THIS FORM 13 PROHIBITED.
25X11
25X1
25X1:-
25X1
CLASSIFICATION CONFIDENTI&L
STATE J
X
J NAVY
NSRB
DISTRIBUTION
-
ARMY
AIR
FBI
-
----
--
------- -
) 3
25X1
25X1
class can tie alongside. the oonorote pier; it is necessary to load larger craft:;
by lighters. One of the projects requ'ring completion is dredging - the harbor
to a depth of 30 feet allowing boats of'the 5000 ton class to tie alongside the
concrete pier. There is an antiquated dredge in the harbor and dredging gill
proceed as soon as model,studie's of silting charaoIteristics of the harbor cur-
rents and necessary prolob.gation of the protecting rip rap breakwater is
,completed.
25X1
rap
25X1
25X1
DATE DISTR. a2tlt 51
NO. OF PAGES 2
NO. OF ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED. INFORMATION
2: Rt present, /arly 19517 shipping. facilities at the Port of Mucuripe, Fortaleza
are te-r from ideal; ho over, the $r ilian goverment has appropriated Cr
`$654000,000 (U5 3,25O,t300), to improve, this port. This money is in. Add.ttii n
to the US $300,000 already extended on tkiii. port. At its present state of
completion, the port has a large rip rap protecting breakwater and a large
earth fill with a concrete pier 1200 fet long. Small boats of the 3000 ton
1 to 5 years will be required for completion of the
port. They have purchase two j ton cranes for ..loading cs'ergo. The Carious
oil companies, Esso, Shell, eto'\have pipeline connection from the dock to storage
tanks on shore. There are no War houses qu the wharf and goods are stored in the
open. The dock is Nerved by rail and hig}waya -
4. "In 1949, this port .andled 260,000 tons of cargo. Exports are chiefly cotton and
vegetal oils; imports are mainly maohiher; and equipment.. Mori' than 10,000 tons
of fuel oil a imported thru this port and 1150 tons of magnesite and 3300 tons
of bagged gypsum exported in'1949. At preset /arty 19517 there are no facilities
for loading bulk materials.' Generally export materials were bagged, and lightered'
to ship.".
rApproved For Release 2004/07/08 : CIA-RDA 0926A003800030003-6
CO 1FIDEN.TIAX4
25X1
25X1
25X1
CONFIDENT?A ,
Approved For Release 20t4C07/08:CIA-RDP80-00926A003800030003-6
25Xt"
Approved For Release 2004107108 : CIA-RDP80-00926A003800030003-6