SUMMARY OF OFFICE COMMENTS ON (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80B01138A000100020026-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 14, 2016
Document Release Date: 
March 28, 2003
Sequence Number: 
26
Case Number: 
Publication Date: 
August 12, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP80B01138A000100020026-4.pdf173.9 KB
Body: 
Approved F~elease 2003/04/24 :CIA-RDP80B01 ~38A000100020026-4 NRO REVIEW COMPLETED 25X1 A Handle via Control Sys em y HANDl:E VfA' TALENT-KEYHC?LIr CONTRbL SYSTEM tJttiILY D Copy of 15 Copies 12 August 1966 MEMORANDUM FOR: Deputy Director for Science and Technology SUBJEC;~': Summary of Office Comments on JIIRC The Offices have individually prepared comments on the draft JII ~ ~ epresentatives from COMDR, OSI, FMSAC, OSP, 25X1A and and I met yestex?day, and agreed on the following summary: 1, The recommended action is exaggerated beyond the needs of the problem apparently because the JIIRC failed to appreciate some of the functions of the existing USIB committees. a. GOMOR now provides guidance on first and second phase readout priorities, and this guidance has been satisfactory to the USIB members and the imagery interpretation community. b. GMAIC, JAEIC, and SIC, whose activities are supported by a significant portion of the I'I effort, now provide a reasonable and satisfactory degree of third phase coordination in their areas of responsibility and, thereby, unwarranted duplication of imagery interpretation effort is precluded. c. JIIRC recommendations requesting the establishment and maintenance of certain files at NPIG for community use as a service of common concern (such as the operational data required far mensuration) are desirable, and could be initiated in the Washington, area a;a part of the COINS effort. Control System Only ' HAf~iQ[:E VfA TALENT-KEYHaL~ CONTrvoL' SYSTEM' ONLYa Approved For Release 2003/04/24:.CIA-RDP80B01138A000100020026-4 25X1A 2~X1A Approved For ,ease 2003/04/24 :CIA-RDP80B0113$}l~00100020026-4 25X1A Control, System Only 1-1ANI7LE VIA TALENT'-IEEYHQLE CONTROL SYSTEM ONLY d. coordination, and the TOP SECRET 25X1A Page 2 provide adequate technical 25X1A . recommendations of JIIRG to form a T7SIB sub-committee to effect this coordination are unjustified and unnecessary. 2. Existing NSCID authorities apply in several areas including: a. Better coordination in other areas and activities ca:n readily be achieved by NPIC exercising authorities in accordance with the provisions of NSCID No. 8. This task is simplified if DIA coordinates and controls Department of Defense imagery interpretation effort in fact as well as theory. b. NPIC R and D efforts should continue as presently or. ganized. The JIIRG recomrnendatian that NPIC be responsible fo:r R and D for Washington area agencies is ill defined, and, further, the responses to the JIIRG questionnaire indicates that there are presently no unfulfilled R and D needs. 3. Although the JIIRG has made a substantial effort to define the various phases and types of imagery interpretation, the proposed National Tasking Plan is internally inconsistent, and the proposed delineation and assignment of tasks is obfuscated by this lack of definition. The cost advantages and operational advantages are not specif'.ic, and in view of the coordination now achieved by the existing USIB committees or achievably by NPIC, foreseeable gains appear trivial, compared to the complications inherent in establishing the Plan. Mare :importantly, if implemented, the National Tasking Plan would artificially fragment currently integrated capabilities by the assignment of the responsibilities proposed; e. g. , SSM, AAM, and nuclear storage site analysis would be split between NPIC, CIA, and a DOD component. 25X1A Control System Only ~'a~`+(1J1_E VIA cotv'rrao~; ~ysx~p~ q~tt:,'h~ Approved For Release 2003/04/24 :CIA-RDP80B01138A000100020026-4 ' Approved For Ruse 2003/04/24 :CIA-RDP80B01138A~100020026-4 TOP SECRET 25X1A Page 3 4. Also, GIA imagery interpretation environment and needs are so different from tactical military needs that the standard PI competence criteria proposed by the JIIRG are believed infeasible. Control System my T,~LENT-KLYNf)t-~ 5. The basic data in the report appears to be reasonably accurate, and represents a useful summary, but in some instances the data has been misinterpreted, and the estimates of imagery interpretation needs, for example, do not appear to be realistic. 6. The individual office comments are attached. 25X1A Specia Assistant 25X1A 25X1A 25X1A A. Note from OSA :~5. .Comments from OSI C. Comments from FM5AC D. Comments from COMDR E. Comments from SAS F. Cvrnm ents from OSP Distribution: Copy 1 DD/S&T w/atts 2 A/DD/S&T w/o atts 3 .DEL w/ o atts 4 ORD w/ o atts 5 OSA w/ o atts b OCS w/ o atts 7 OSI w/ o atts 25X1A 8 FMSAC w/ o atts 9 OS P w/ o att s 10 C/COMDR w/o atts 11 C/SAS w/o atts 12&13 SA/DD/S&T 14&15 DD/S&T Registry Handle via Control System n y XfA'hiDL`E VT,Q TALENT'.KEYH(31.~ Approved For Release 2003/04/24 :CIA-RDP80B01138AOO~~~f~~QbO~6s4'crn? oN~y Approved For Release 2003/04/24 :CIA-RDP80B01138A000100020026-4 25X1A Approved For Release 2003/04/24 :CIA-RDP80B01138A000100020026-4 Approved For Release 2003/04/24 :CIA-RDP80B01138A000100020026-4 REFERRED TO OFFICE Approved For Release 2003/04/24 :CIA-RDP80B01138A000100020026-4