BI-WEEKLY TASK REPORT SUMMARY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80B01139A000600140018-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 12, 2016
Document Release Date: 
April 29, 2002
Sequence Number: 
18
Case Number: 
Publication Date: 
August 1, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP80B01139A000600140018-4.pdf297.89 KB
Body: 
!7eor`ase .2002/07/03 CIA-RDP80B0113914090600140018-4 S- t.'-C--R-E--T CHIVE/C-120/5-66 1 August 1966 j MEMORANDUM FOR- Director, CHIVE Task Force SUBJECT Bi--Wee.L-Ily Task Report Summary The Integration and Plans Staff submits the following summary from the task reports covering the period of 18 July through 29 Tuly Synopsis: 1. The Security Procedures Task Team's (Task #1) paper, "Personnel Secur?.ty1ll is being typed for publication. Further work on the Security Task must wait on responses to the security papers submitted to date from OCR and/or Office of Security. 2. has completed three weeks of training on 5KAN urrer wareness, Task Team 02). She will continue to work ear: SKAN at intervals. . 3. The Location Dictionary Task Team (Task #5a) is now in the process of refining the ten files. Listings of all ten files are in the following order: alphabetic, CHIVE; number order, and. all preferred names in coordinate order. 4. The Organization Dictionary Task Team (Task #5e) has assigned CHIVE location and organization nua.bers to FIB files. After key-punching is, completed these transcriptions will be merged in with the "C," V" and "T" files which have been assigned CHIVE location and organization numbers. S. compiling a list of that the performance statistics for Page Reader acceptance testing from 8 July through 26 July are as follows: Flours Hours # of Char. Rej. Err. or Substitution Run Down Forms (K) Rate Rate 76- 5. 55 29538 '14,720 1121-, 1 48K to be converted to CHIVE format an included in t e Dictionary (Task #5d). 6. The Input Proce,ssing Task Team (Task #121 reports GROUP I 8 - -C-R--E-T Excluded from automatic downgrading and declassification 25X1A 25X1 B Approved For Release 2002/07/03 : CIA-RDP80B0l139A000600140018-4 Approved Four Release 2002/07/03 : CIA-RDP80B01A000600140018-4 Total or total Use Hours Down Hours 91 43.75 The average effectiveness level for the previous 30 calendar days (27 June-26 July) was the following: 7. The File Maintenance Task Team (Task #13) continues to work on module development and flow charting. In spite of significant changes in the task in the last two weeks, the schedule has not been hindered; in fact, because the new logical flow takes avantage of completed work; the rest of the module development may be accelerated. 8. Personnel shifts have resulted in there being only one person, on the Control Task (Task #14), leaving three un s e positions. This is not considered critical at the present time, but it cannot continue for long without adversely affecting the total system effort. 9. The File/Report Processing Task Team (Task #15) plans to distribute the :specifications of the CAPRI retrieval and output capabilities the first week in September. Preliminary specifications of the Re r eva , pu , and File Maintenance comnand language will be available the first week of October. 10. The Phase III Scheduling Team (Task #17) has completed the charts. A chart data maintenance document changes to these displays Support was proviued to Study. % Effective and Integration Task updating of the permanent form has been devised to and to aid in maintenance. for his Intellofax 25X1A 11. The System Test. Plan Task Team (Task #18),follow- ing the initial identification of functional objectives of the system as a whole, is planning to project these objec- tives into the unit processes and tools of the COG system. 12. The summary report on the Q Requirements 25X18 Study (Task #19) will be. completed in draft form by 30 July,: 1966. This draft will be submitted to the D/CTF for approval. After approval is granted, the report will have to be typed in sufficient copies. Considerable graphic work will have to be prepared as a number of charts have been prepared in rough form. The substantive work on the Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 Approved Faor Release 2002/07/03 : CIA-RDP80B01A000600140018-4 S-E-CaR-E-T study will be completed or time, but the report will be published sometime in August after approval by Task Force management, and after typing and graphic work is completed. 13. The Management D.ta Task Team (Task #20) has come to a tem rat halt. has been engaged full time on the Study and has been devoting all of his time to the Intellofax System Study at the request of OCR. 14. The revised edition of the collateral China List has been printed for the Customer Requirements and Relations Task Team (Task #22). The supplemental papers to the China Catalog have been completed in draft form for SKAN. 15. The draft of the working paper entitled "CHIVE Interface with the Photo 13ranch/Graphics Register" has been completed by the Graphics and Maps Task Team (Task #23). The paper will be published after final review by CTF management. This report is the final product specified for this task and presumably will mark the completion of the task effort. 16. has been assigned to the Source Formatted Data Task Team ask #27) as of 25 July 1966. 17. joined the ALP Development Task Team la ,, and 25 July, respectively as AL,P stenotypists. The ALP bi-weekly production figures (18-29 July 1966) are as follows: STENO: Translit. Lines (l0 words) FDD reports 1,858 21,286-. OMS summaries 110 1,587 25X1A 25X1A but Words Lines FDD documents 70,697 10,190 18. A memorandum. was prepared, at the request of the Executive Director, OCR, for the Director of OCR, by the Programming Training Task. Team (Task #39), listing programmer/ OCR people and current assignments. A start date for the next trainee class has not been set. 19. Staff Assistant to the Director,CTF (Task #42,, asses a in the coordination of the FY 1967 contract. has revised the procedures 25X1A Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 Approved For Rase 2002/07/03: CIA-RDP80B011390600140018-4 Nuor on processing Task Force printing services requisitions. Liaison is continuing with Procurement Division, Office of Logistics on the =ontract. coordinated 25X1A required logistics in several CTF brie ngs. 20. 0 proposal for extension of the current contractor effort was submitted on 19 July 1966 by the Contractor Management Task Team (Task #43). 21. The Task Group . ia.n ement Task Team (Task #4 reports that I will work on the Sovie Project in CHIVE in Odtober. 22. Chairman of Clerical Support Task Team (Task #461, requirement on OCS to find a replace- ment for secretary to the Director, CTF. esigne on 29 July. 23. The System Flows and Transactions Task Team (Task #55) is currently working on the first drafts of input transactions for R and NR documents. The flow charts for R and NR documents have been corrected to show several changes which were recommended of July with 24. Chairman of COG Organization and Personnel Responsibilities Task (Task #58),is preparing a draft paper on Personality Processing Criteria, which has been cleared through BR and now is in SR (due back 25 July). A draft of an Organizational Configuration for COG has been prepared and a Task Description is underway. 5X1 B 25X1 B 25X1A 25. .The Sovieti Task Team (Task #59) reports that DR's nominal target a e of 1 November for completing the file has been delayed now that they have a more realistic idea of the effort involved in data reduc ion,; codi.ng__and ke punching (the critical path). This tends to increase he ion ok-t-h ' irIVE involvement, rather than its magnitude. During the past two weeks BR has furnished a final list of the data items including field lengths. CHIVE technical assistance has provided final file formats and input card layouts. A reliminar input trans- cription form was also given to submitted 25X1B to Machine Division for their approval. Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 25X1 B Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 Approved For ease 2002/07/03: CIA-RDP80BO113 00600140018-4 12. On Wednesday, July 27,1 1 25X1A 25X1A met with to discuss their proposed refinements to DDS draft of the Systems Flow. Chief, Integration s Staff CHIVE Task Force 25X1 Distribution: File as eport Summaries) Chrono Approved For Release 2002/07/03 : CIA-RDP80B01139A000600140018-4 25X1A