Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0
AZIC03: Six production runs plus three projection overlays
were rnade for G1ER. accuracies are creeping into the projection
plots clue to hardware difficulties, namely plotting head overshot.
An atte pt is being- rnadee by OCS to overeon ee this hardware deficiency
by programming methods.
E : A stripping program was added to .ECAC, checked
MI$TRA tMILIr E . ISTRAKITRAll: Program analysts
is completes, coded and chec.l.ec out for r fILD W. Heavy output was
produced by the b ILI;E prograz . for application to the RAY TRACE
program. TRA.K was debugged a ad a trial run will be made.
out and two successful production. runs made.
. , RAY TRACE: Supplementary subroutine analysis was con
pitted and programmed. The original program was revised for
compatibility with In-house co - inter systems.
run made with output available 1 October.
. . . R : Program was checked out and a complete production
. . SPHERE: A now program to trace rays through the ionospher
under clevclopment.
were made. Modifications are b2iug made to provide Interpolated
informational outp,tt and to offer option of map scaling. Production
runs were made for 0SX. DIA is providing additional input data.
VOYAGE: This prograar was completed and production runs
25X1
L.
xeao
COPY
in charge of this systems integration activity,
Detailed specifications are being prepared by CTF for the
CDC 915 Pager Reader. A letter of Intent has been Issued to rent the
915 for one year. OCS and OCR personnel are being trained on the
915 yster,. including the CDC 3092 computer.
Project-CHIVE:
. The tasks in Croup I (Requirements and Plans) and Croup 11
(Systems Design) have been consolidated under the general heading of
Systems Design with f the CHIVE Task Force (CTF)
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0
Detailed plans and schedules for Phaso III implementation
have been drafted for OCR many-ger ent approval. These includes
(a) a milestone network of development steps, (b) a Gantt Chart
showing man-months per task, (c) guidelines on the blogra.phik area
problems, (d) a list of OCR no:-_inees for the CHIVE Task Force, etc.
A detailed study has been made of the OCR/SR detailed
index files to determine the processing that would be necessary to
convert these punched, card files to mag tape records for CFI' E.
Prolirzainaary conclusions from the study of the Inteellofax
Index are that conversion to an ELP oriented system is not feasible.
The study has been extended to determina possible methods for
utilization of the Inteellofax Reference System files in a non-converted
form.
Work on security specifications for CHIVE was concentrated
on the logical file security probleme with some initial work on identi-
fying the physical security problems.
The Current Awareness Support Croup studied the OCR/SR
pertmu.teed title indexing operation and also obtained background Infor-
mation on tt:W1C indexing techniques. Moat KWWIC-type applications
are on an IBM 1401 computer; regrog rar:acrdng would be required for
S/ 360 application.
A draft has been prepared of the recommended organizational
structure space plan, etc. , for the document delivery systern..
. Progress was made on reviewing and modifying the Intelligence
Subject Code for CIIIVE use.
.. . , A working paper was prepared which outlines the proposed
CMZV. Organizational Dictionary.
Project LP:
The Russian language update programs were checked at ISM
.Icingaton early in September and found to be unsatisfactory; 1. a., these
programs had not been completely debugged and the documentation was
poor. IBM will continue to perfect these programs and they will be
chocked again at a later date.
i
XE:RO
COPY
XERO
COPY
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0
1-CREI1
. . . A plan was formalized for carrying out the on-site
testing of the A..LP system. The acceptance test is schedule
October.
Systems Prod MLn :
SOF-8: An Improved version of the S System Operating
File for the 7010 computer is being prepared by the Technical Staff.
SOW-3 Is being designed to perform auto:naatlc checks when a job Is
being processed and to standardize the steps to be takei when errors
occur. The target date for implementing 50x'-8 is 26 October.
7090 System: Modifications made the previous month to
T YS, the IBM operating system for the 7090 computer, proved
satisfactory. No further changes have been made.
. , . 360/ 30 System: The Multi-task utility program. which is
being developed by the Technical Staff, to in its final debug stage.
This effort is on schedule and will be completed soon after the second
printer is available on the 360 Mod 30 computer.
. . IBM 340130 System relive}red: The first third generation
computer system in CIA and oner of the first outside of IZM'ss own
facilities was delivered to the CIA Computer Center on 7 September
1965. The Technical Staff began to use this syste,sn on 21 September,
however, for test and assembly of the programs and operating. system.
The 1403-2 Printer ehouid be operational early in October which will
permit final esystet: check out and the begiruti.ng of agceptan ee testing.
The Disk Storage In not required during this phase. The current
delivery schedule for Disk Storage is late October. The IBM 1401
System is being held at reduced rental rates for backup until all
input/output processing has been transferred to the 360/30 System.
This should be accomplished before the end of the year.
ALP S Z stem Installed: The automatic Language Processing
System (ALP) was delivered to the CIA Computer Center on 15 September"
IBM Engineers from Kingston. View York and local customer engineers
set up the equipment and ran preliminary tests during the following two
weeks. Acceptance testing of the System will begin early to -ctober.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP80BOl 139A000600170028-0