STEERING COMMITTEE MEETING-NEW BUILDING PLANNING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80B01676R004100070022-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 12, 2016
Document Release Date:
April 11, 2002
Sequence Number:
22
Case Number:
Publication Date:
September 18, 1956
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP80B01676R004100070022-8.pdf | 231.22 KB |
Body:
Approved For Release 2002/08/21 : CIA-
E C R E
070022-8
o, S SZ- S-it
Arlo- f-41#26
76&
MEMORANDUM FOR THE RECORD
SUBJECT; Steering Committee Meeting
New Building Planning
18 September 1956
1- A meeting was held in the DCV9 conference room on
7 September 1956, for the purpose of establishing policies and
methods to be followed in implementing the DCII directive of
1!a August 1956. Present were:
25X1
25X1
25X1
Lt. Gen. Co P. Cabe1l, Acting DCII
Mr a H. Gates Lloyd, Acting DD/S0 Chm e , Steering Committee
Mr, Huntington Sheldon, Acting DD/1
Acting DD/.P
ick, 1.G.
Liaison Officer DD/I
iaison Officer DD/P
ro James A. Garrison, Director of Logistics
G , Chief, Building Planning Staff
Building Planning Staff
. 20 The D/OL discussed the status of the architect-engineer
work and emphasized their immediate need for a revised Space
Directive or requirements to be included in a reduced headquarters
building. He further explained that the General Services Admin-
istration and the architects estimates of cost, reflecting the in-
creased cost of construction, indicated that we should design a
25X1
25X1
S E C R E T
Approved F% elea/be 2002/0~r~~~~: ;CIA-RDP80B0l676R004100gL002&-85'J3 c'
4&k9&4
Approved For Release 2002/08/21 : CIA-RDP80BO1676R004100070022-8
S 1 C R F T
a. Such a reductions more or leas across the board,
of the space originally requested would not be entirely
correct.
b. The final decision as to which Agency component or
element would be reduced and by how much, would require
considerable study by the Inspector General, Management
Personnel and the offices concerned.
co It in essential that the architect be provided informa-
"tion establishing the projected composition of the Agency with
the maximum possible degree of accuracy in order that dia-
grammatic, tentative and final working drawings may- be pre=
pared.
d0 "Fixed Plants" or special use areas with peculiar re-
quireMents must be considered and positioned in the initial
planning stages, while in contrast the office area in general
could be utilized by one component as well as another o
3. The Building Planning Staff presented two possible. methods `
or :solutions to accomplish the required space reduction of approxi-
mately 20 percents
ao Method 1 was based on an analysis of the "fixed plant"
requirements by the Building Planning Staff leading to the re-
commendation that these facilities be reduced not to exceed
10 percent. Such a reduction would require a 27 percent re-
duction of the general office area or remaining space a With
concentrated utilization approximatel personnel
could be housed in such a building.
bo ~ The-second method provided for therelocatioz away
from the metropolitan area of Waishington of certain TSS, OTRD
and OL elements and for the? retention of the four permanent
buildings on "the hill" as a holding area for selected elements
until such time as the headquarters personnel strength was
sufficiently reduced to enable an absorption into the new building.
It was noted that several of "the hill" buildings might well not
be available for our continued occupancy as a result of the
construction of the Constitution Avenue Bridge and its approach
roads.
25X1
Approved For Release 200 10J2jt: filAjD P80B01676R004100070022-8
Approved For Release 2002/08/21 : CIA-RDP80B01676R004100070022-8
S E C R E T
4. The Acting'- DC1 stated his a policy that if any elements
were to be left out'of the building they must be only those of
such a. nature that do not belong in .an office building or because
the Agency would benefit through increased efficiency and secu-
rity of operation. The Acting DCI further stated that elements
would not be moved out of the building merely to increase the
population capacity of the building.
50 After considerable discussion, it was concluded that,.
as The following elements would be left out of the build
ing:
(l The Printing Plant of the Office of Logistics
This activity will remain in its present location
This plant is primarily
;a sop rather than an office=type operation and there-
fore proper to leave out of the building under the guide
lines established by the Acting DCIo
and 42, 900 sq. ft. of space m from SPACE DIRECTIVE
A
(2) They Garage Facility O orated by Logistice
This is another shop-type activity and will remain
in its present location in
23, 700 ssq, ft. of space - from SPA E TIVE AE
25X1
21
25X1
Approved For Release 2002/08/21 : CIA-RDP80B01676R004100070022-8
S E C R E T
Approved For Release 2002/08/21 : CIA-RDP80BO1676R004100070022-8
E C R E T
(4) Certain Training Courses of QTR
25X1
25X1
25X1
be Any reductions necessary after eliminating the
elements listed under 5 . ao , are to be based on a perms
centage rate applied to all components, both as to space
and personnel. The rate of reduction for space will be
based on the ratio of total Agency space in the new build-
ing to space requirements for the larger building orig-
inally planned, less space included for the activities list-
ed under 5. a., above. Personnel figures for each compo-
nent will be based on the ratio the new building capacity
listed under 5. a. , above. ) . The new building capacity will
be determined by the Building Planning Staff after analysis
of the activities to be carried on in the building.
S E C R E T
25X1
Approved For Release 2002/08/21 : CIA-RDP80BO1676R004100070022-8
Approved For Release 2002/08/21 CIA-RDP80BO1676R004100070022-8
6. The Building Planning Staff was directed. to prepare
and deliver to the architect a revised interim Space Directive
on the basis of 5. a. and b., above as quickly as possible.
Secretary, Steering Committee
CONCURRENCES:
James A. Garrison
Director of Logistics
CL/BPS: :mec
1 - D/L
/M
1956
SEP 2 1
(signed) H. gates Lloyd
Date
H. Gates Lloyd
Acting Deputy Director
g Support)
Distribution: dt--) Ad
1 mGen e
1 DCx APPROVED: 27 SEP 1956
1 DD( Date
2 ADD/S
2 BPS
SIGNED
I - ADD/I
I a ADD/P C. P. Cabell
1 IG Lieutenant General, USAF
I Each Liaison Rep. Acting Director
Approved For Release 2002/08/21 : CIA-RDP80BO1676R004100070022-8
S E C R E T
25X1