CONSTRUCTION AND EXPANSION OF (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80R01731R000800190001-7
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 14, 2016
Document Release Date:
April 17, 2003
Sequence Number:
1
Case Number:
Publication Date:
June 8, 1953
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 244.3 KB |
Body:
25X1
Approved For Release 2003/05/05
NO CHANCE CN CLASS.
r, Go-CI.A-SIFIED m!! 25X1
'rot TS 3 4g~r
AUIH: NW AA
BAT LU ass _REVIEWERL_
f IN IS 1953
25X1
1. During recent weeks our rapreGenttivet have conferred con-
cerning, the above s;ubject. The plans and specifications have been
discuss. in considerable detail and, in addition,, consideration has
been given to the availability of funds and the adequacy of the
facilities of the Department of the Navy to acconpl: sh the project.
2. The Central intelligence Agency has an innediete and
c _ fling need for the construction and expera.:ion but has limited
facilities to accomplish it. raver, the A, enc r ;E s fundz, aivaailable
for the purpose, and it is prc as e be trs esferred to the
Department of the av?, the sum of Por the early accompli h- 25X1
meat of the Project. I have been advised that the D:psrt:nt of the
Navy has adequate facilities and is willing to make such facilities
available to accomplish this Project,, which I believe iM z iciently
definite and specific a to its extent and t maa.
ief of Naval Operation.,
partment of the Navy
t ion a E%Tawion of
3. It is my understanding that the condit
Agency and the Department
h the Project are as follows i
25X1
a. The Deper tent of the Navy shall, at the earl
practicable date, .supply the nece:ssry facil.itie
connection with the construction and .ion of
The Chief of Naval 31jeratio :s,, because of
ity content of this Project, shall, take such
tion as is neces.~a ry to protect the sea r
aspects of the Pro Ject.
b. The Chief of Naval Operations is authorized to prof c
with the construction concerned in au ccrdsnce with exist
as ,s, a pecifications, and drawings, which are hereby
incorporated by reference and made a parr,- of this
aztei ;rguuiu,_z.
c. The Central Intelligence rl : ency Shall edvax a to the
, pa rte nt of the Navy the sun of wl ieh sun shall
be available for the activitiez Conte pl, xte; in tti: i r6A Ct.
Ts 58455
COPY 3 of 10
Approved For Release 2003/05/05 : CIA-RDP80R0l731 R000800190001-7
25X1
25X1
Approved For Relea 220013/
In the event any deviations from, existing pleas, specifications,
and drawings are did necessary by the Central Intelligence
Agency, appropriate arrangements will be made to give seasonable
notification to the Department of the Itavy, provided that the
as unt of funds required shall not exceed the amount set forth
d. In order to coordinate the related administrative
of the Project, it shall be the responsibility of
the D went of the Navy to designate the Project an to
give the Central Intelligence Agency due notice thereof.
Central Intelligence Agency shawl provide appropriate
ically qug.ified liaison personnel to advise and assist
the Department of the Navy in fulfilling the requirements con-
tea.ated hereunder. In order to assure current administrative
information concealing the Project, the Central Intelligence
Agency and the Department of the Navy shall designate appropriate
individuals, including legal, fiscal, procurement, a .-d engineering
personnel,, to carry forward the detailed work incident to the
t. It is oonteaplated that such coordination will. be
achieved by direct negotiation and discussion Between the
respective technical components of the establis Tents concerned.
4. If the above is in accordance with tour understanding, I
propose that this memorandum be considered the basic agreement under
Bch this Project will be conducted. Accordingly, y ur approval
will enable initiation in this Project.
.ALL411 W. DULMS
Director
25X1
Depa tmeat of
Chief a
OGC:JSW:jeV-'
cc: +3TC2 (2)
DD/A
CAOIDDP
LO
Comptroller
OGC (2)
L. K. WHITE
Acting Deputy Director
4 ~% 'ase 203/05/05 CIA-RDP80R01731 R000800190001-7
JUN 6 1i
Approved For Release 2003/0'5'/05S:`CIi4-RDP80R01731 R000800190001-7
SIGNATURE RECORD AND COVER SHEET
DOCUMENT DESCRIPTION
REGISTRY
SOURCE: General Counae].
CIA CONTROL NUMBER:
DATE. OF DOCUMENT: 8 June 1953
DATE DOCUMENT RECEIV
COPY NUMBER (s)- 3 and 4 of 10
LOGGED BY: 25X1
NUMBER OF PAGES: 2 DOCUMENT NO.
NUMBER OF ATTACHMENTS: None
ATTENTION: THIS FORM WILL BE ATTACHED TO EACH TOP SECRET DOCUMENT RECETVED BY THE CENTRAL INTELLIGENCE
AGENCY OR CLASSIFIED TOP SECRET WITHIN THE CIA AND WILL REMAIN ATTACHED TO THE DOCUMENT UNTIL SUCH TIME
AS IT IS DOWNGRADED, DESTROYED OR TRANSMITTED OUTSIDE OF CIA. ACCESS TO TOP SECRET MATERIAL IS LIMITED
TO THOSE INDIVIDUALS WHOSE OFFICIAL DUTIES RELATE TO THE MATERIAL. EACH ALTERNATE OR ASSISTANT TOP SECRET
:ONTROL OFFICER WHO RECEIVES AND/OR RELEASES THE ATTACHED TOP SECRET MATERIAL WILL SIGN THIS FORM AND INDI-
.ATE PERIOD OF CUSTODY IN THE LEFT-HAND COLUMNS PROVIDED. THE NAME OF EACH INDIVIDUAL WHO HAS SEEN THE TOP
SECRET DOCUMENT AND THE DATE OF HANDLING SHOULD BE INDICATED IN THE RIGHT-HAND COLUMNS.
DEFERRED TO
RECEIVED
RELEASED
SEEN BY
OFFICE
SIGNATURE DATE
TIME
DATE
TIME
NAME 8 OFFICE SYMBOL
DATE
5X1
?
g
?/s
25X1
7-j i 0.
"?o Or
TOTAL NOS' HEREIN
NOTICE OF D
ETACHMENT
2
WHEN THIS FORM IS DETACHED FROM TOP SECRET MATERIAL IT WILL BE COMPLETED IN THE APPROPRI
ATE SPACES BELOW AND TRANSMITTED TO CENTRAL TOP SECRET CONTROL FOR RECORD.
DOWNGRADED
DESTROYED
DISPATCHED (OUTSIDE CIA) TO:
25X1
APR-1948 88.13 PREVIOUS EDITIONS NOT TO BE USED
Approved For Release 2003/05/05 : CIA-RDP80RO1731R000800190001-7