CONSTRUCTION AND EXPANSION OF (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80R01731R000800190001-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 14, 2016
Document Release Date: 
April 17, 2003
Sequence Number: 
1
Case Number: 
Publication Date: 
June 8, 1953
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP80R01731R000800190001-7.pdf244.3 KB
Body: 
25X1 Approved For Release 2003/05/05 NO CHANCE CN CLASS. r, Go-CI.A-SIFIED m!! 25X1 'rot TS 3 4g~r AUIH: NW AA BAT LU ass _REVIEWERL_ f IN IS 1953 25X1 1. During recent weeks our rapreGenttivet have conferred con- cerning, the above s;ubject. The plans and specifications have been discuss. in considerable detail and, in addition,, consideration has been given to the availability of funds and the adequacy of the facilities of the Department of the Navy to acconpl: sh the project. 2. The Central intelligence Agency has an innediete and c _ fling need for the construction and expera.:ion but has limited facilities to accomplish it. raver, the A, enc r ;E s fundz, aivaailable for the purpose, and it is prc as e be trs esferred to the Department of the av?, the sum of Por the early accompli h- 25X1 meat of the Project. I have been advised that the D:psrt:nt of the Navy has adequate facilities and is willing to make such facilities available to accomplish this Project,, which I believe iM z iciently definite and specific a to its extent and t maa. ief of Naval Operation., partment of the Navy t ion a E%Tawion of 3. It is my understanding that the condit Agency and the Department h the Project are as follows i 25X1 a. The Deper tent of the Navy shall, at the earl practicable date, .supply the nece:ssry facil.itie connection with the construction and .ion of The Chief of Naval 31jeratio :s,, because of ity content of this Project, shall, take such tion as is neces.~a ry to protect the sea r aspects of the Pro Ject. b. The Chief of Naval Operations is authorized to prof c with the construction concerned in au ccrdsnce with exist as ,s, a pecifications, and drawings, which are hereby incorporated by reference and made a parr,- of this aztei ;rguuiu,_z. c. The Central Intelligence rl : ency Shall edvax a to the , pa rte nt of the Navy the sun of wl ieh sun shall be available for the activitiez Conte pl, xte; in tti: i r6A Ct. Ts 58455 COPY 3 of 10 Approved For Release 2003/05/05 : CIA-RDP80R0l731 R000800190001-7 25X1 25X1 Approved For Relea 220013/ In the event any deviations from, existing pleas, specifications, and drawings are did necessary by the Central Intelligence Agency, appropriate arrangements will be made to give seasonable notification to the Department of the Itavy, provided that the as unt of funds required shall not exceed the amount set forth d. In order to coordinate the related administrative of the Project, it shall be the responsibility of the D went of the Navy to designate the Project an to give the Central Intelligence Agency due notice thereof. Central Intelligence Agency shawl provide appropriate ically qug.ified liaison personnel to advise and assist the Department of the Navy in fulfilling the requirements con- tea.ated hereunder. In order to assure current administrative information concealing the Project, the Central Intelligence Agency and the Department of the Navy shall designate appropriate individuals, including legal, fiscal, procurement, a .-d engineering personnel,, to carry forward the detailed work incident to the t. It is oonteaplated that such coordination will. be achieved by direct negotiation and discussion Between the respective technical components of the establis Tents concerned. 4. If the above is in accordance with tour understanding, I propose that this memorandum be considered the basic agreement under Bch this Project will be conducted. Accordingly, y ur approval will enable initiation in this Project. .ALL411 W. DULMS Director 25X1 Depa tmeat of Chief a OGC:JSW:jeV-' cc: +3TC2 (2) DD/A CAOIDDP LO Comptroller OGC (2) L. K. WHITE Acting Deputy Director 4 ~% 'ase 203/05/05 CIA-RDP80R01731 R000800190001-7 JUN 6 1i Approved For Release 2003/0'5'/05S:`CIi4-RDP80R01731 R000800190001-7 SIGNATURE RECORD AND COVER SHEET DOCUMENT DESCRIPTION REGISTRY SOURCE: General Counae]. CIA CONTROL NUMBER: DATE. OF DOCUMENT: 8 June 1953 DATE DOCUMENT RECEIV COPY NUMBER (s)- 3 and 4 of 10 LOGGED BY: 25X1 NUMBER OF PAGES: 2 DOCUMENT NO. NUMBER OF ATTACHMENTS: None ATTENTION: THIS FORM WILL BE ATTACHED TO EACH TOP SECRET DOCUMENT RECETVED BY THE CENTRAL INTELLIGENCE AGENCY OR CLASSIFIED TOP SECRET WITHIN THE CIA AND WILL REMAIN ATTACHED TO THE DOCUMENT UNTIL SUCH TIME AS IT IS DOWNGRADED, DESTROYED OR TRANSMITTED OUTSIDE OF CIA. ACCESS TO TOP SECRET MATERIAL IS LIMITED TO THOSE INDIVIDUALS WHOSE OFFICIAL DUTIES RELATE TO THE MATERIAL. EACH ALTERNATE OR ASSISTANT TOP SECRET :ONTROL OFFICER WHO RECEIVES AND/OR RELEASES THE ATTACHED TOP SECRET MATERIAL WILL SIGN THIS FORM AND INDI- .ATE PERIOD OF CUSTODY IN THE LEFT-HAND COLUMNS PROVIDED. THE NAME OF EACH INDIVIDUAL WHO HAS SEEN THE TOP SECRET DOCUMENT AND THE DATE OF HANDLING SHOULD BE INDICATED IN THE RIGHT-HAND COLUMNS. DEFERRED TO RECEIVED RELEASED SEEN BY OFFICE SIGNATURE DATE TIME DATE TIME NAME 8 OFFICE SYMBOL DATE 5X1 ? g ?/s 25X1 7-j i 0. "?o Or TOTAL NOS' HEREIN NOTICE OF D ETACHMENT 2 WHEN THIS FORM IS DETACHED FROM TOP SECRET MATERIAL IT WILL BE COMPLETED IN THE APPROPRI ATE SPACES BELOW AND TRANSMITTED TO CENTRAL TOP SECRET CONTROL FOR RECORD. DOWNGRADED DESTROYED DISPATCHED (OUTSIDE CIA) TO: 25X1 APR-1948 88.13 PREVIOUS EDITIONS NOT TO BE USED Approved For Release 2003/05/05 : CIA-RDP80RO1731R000800190001-7