WISMUT A.G.: ORE GRADING AT OBJEKT 9

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80S01540R007300090002-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
9
Document Creation Date: 
December 20, 2016
Document Release Date: 
December 7, 2007
Sequence Number: 
2
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80S01540R007300090002-6.pdf297.22 KB
Body: 
Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 i YY l..J1r1V1 l1.1,7'o Wt-t+ ;~1 CwUlii. Cx.V V() C''j{,ti - -A. A. 'Appendices (a) At Appendix "A" - A diagrammatic plan and legend of Schacht 66, OBERS CHLE,,.'1A. A ground sketch and legend of the transporta- tion bridge of Schacht 66. (c) At Appendix "C" - A ground sketch of the German test point of Schacht 66. (b) At Appendix "B" B. Routing of Kistenerz at 0bjekt 9 Schacht 66 2. The sketch at Appendix "B" shows hown e cars are routed past two geiger check points on the transportation bridge of Schacht 66, one staffed b,-,- Russian and the other by German personnel. The following notes are in elucidations- (a) High grade Kistenerz _ Russian test point (i) Relatively high grade ore, known at Schacht 66 as "Taloner_Y', is packed into ztsc: boxes measuring approximately 60 cm x 30 cm, reigning, ;Then full, about ~5(?v^,kg. The boxes are loaded onto mine cars which are labelled with a Hauerschei: and escorted by a member of the Hauer brigade to the transportation bridge where (Appendix "B", 3) they are t:-ke: over by a German pithead team (Ht.ngekomrnando). (ii) The pit-head team push the mine cars to a hoist (Appendix "Dy 1) .,Thichlowers them from the bridge to rails leading to the Russian test point (Appendix "A", 7). A Russian officer here removes the Hauerschein and Russian soldiers push the: mine cars to their test point, and thence to a loading bay which adjoins it. (iii) At the Russian loading bay a grab lifts the boxes from the mine cars and drops them onto a moving belt -,!hich carries them to a Russian truck and guard. (iv) The trucks leave the Schacht at point 15 at Appendix "A", bound for DBESD ?. (v) A bonus of between 80 and 120 DM(E) is paid for each box of the type of ore described above, and two representative day /shifts are.... Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 shifts are capable of producing between them approximately 400 boxes. (b) Lower quality Kistenerz - German Test Point (i) Lower grade ore is also packed into boxes at Schacht 66 and loaded into mine cars, each of which carries a "Hauerscheir." label. (ii) The mine cars travel, without escort, to a pit head team (Appendix "B", 3) which forwards them to the Gorman test point. A braking device (Appendix "C") automatically halts the cars which are tested and then passed down one of three tracks according to their values:- Scale reading Track Disposal Under 20 track 1 To dead ore bunker (Appendix "B", 10) 20/50 track 2 To ore bunkers reserved for these values (Appendix "B", 8 and 9) 150/200 track 3 To ore bunkers reserved for these values. (Appendix "B", 8 and 9) (iii) The German counter is incapable of giving scale readings over the order of 200 and mine cars which show a value at the top limit of the counter's range are rerouted to the Russian check point (via the hoist shown at Appendix "B",l). The German operators are under orders to report cases of this kind to the Schacht administration so that the underground radio-- metri.st who made the mistake can be taken to task. Since they took over their test point on 26th June, 1956 from Russian operators the Germans at Schacht 66 have encountered one misdirected load of "Talonerz". (iv) The ore which has been tested by German personnel is taken away in Kipper lorries which leave the Schacht from point 15 at Appendix "A". Lorry drivers have from time to time disclosed that they take their load to the rail;-ay goods station at AUE where it is transferred to deeper capacity lorries for onward transit to Objekt 101, CROSSEN. C. Quantity and ualit, of German tested Kistenerz " 3. A single German shift working bet::;een 26th Juno and 7th July, 1956 tested 783 boxes of Isis tenerz of which approximately 450 :.-poxes gave scale values between 20 and 150, and 333 boxes gave values between 150 and 200. During this period no boxes came into the catogory of dead ore (under 20). D ............. Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80S01540R007300090002-6 D. Composition and modus operandi of the German test point 4. The test point shown at Appendix "B", 6, was operated until 19th June, 1956 by Russian soldiers who were replaced by German personnel on 20th June, 1956. Similar changes were enacted on the same day in Seh.chte 38, 186, 207, 250 and 296 of Objekt 9. In each case three 24 hour one-man shifts are being corked, with a fourth operator in reserve. 5. Duties of the German operators Each operator has been instructed:- (a) to take scale readings for each mine car passing the check point; (b) to operate the track points and distinguish, according to the ore values registered, between tracks 1, 2 and 3; (c) to remove "Hauerscheine" from each mine car and hand them in at the end of a shift; (d) to take details from each "Hauerschein" of the number of boxes per car, logging them as follows (hypothetical entry):- Shift No. of boxes per car. Total No. of boxes for whole shift 29 89 99 79 6, 3. 35 Values, in terms of a geiger scale reading, are not logged with the foregoing entry. The oporrator reads the scale merely to decide which points he has to throw for each mine cnr, and keeps no record of his selections. Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80S01540R007300090002-6 Plan of installations at Obiekt 9, Schacht 66, Oberschlema .--- .+otl~ obwjthleuia . lb APPENDIX "A" watt. Zwickaa 4-Brr 144- t as w -~ Approved For Release 2007/12/07: CIA-RDP80S01540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 APPENDIX "All Obekt 99 Schacht 66 Plan L_ egend 1. Ground level - Shift office First floor - Soviet and Genii-an Schacht administration. 2. Washrooms for Obersteiger and Steiger. 3. Washrooms for equipment. 4. Guard room. 5. First aid room. 6. New Schacht administration offices, to be built. 7. Russian test point. 9. Rail track connecting transportation bridge hoist with Russian test point. 8. Transportation bridge (see Appendix 11B") 10. Track to the dumps. 11. Dumps. 12. Smelting, welding and locksmith's shops. 13. Machine house for hoists. 14. Storehouses. 15. Exit for lorries. Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80S01540R007300090002-6 >IX "B" Ground sketch of transportation bridge (legend attached) Track 1 Track 2 Track 3 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO154OR007300090002-6 F/07/1683 of 18.7.56 A-P-Pe-ndix "B" Objekt 99 Schacht 66, Legend 1. Hoist (for mine cars containing high grade Kistenerz and for materials. 2. Personnel hoist (2 baskets) 3. Hoist (2 baskets; for raising ore and lowering materiab to Schacht). 4. 2 Skips for raising waste materials. 5. 2 shaking grates (Schtittelroste) for passing waste ore (tote Masse) into bunkers. 6. German test point, (sec Appendix "C") 7. Mine car washing point. 8. 6 ore bunkers (below transportation bridge). 10. Bunkers for ore designated as waste (tot) by German check point. 11. Conveyor belt carrying waste ore from Bunker 11 to waste ore bunker. Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6 Objekt 9, Schacht 66: Ground sketch of German test point Fence line cars 2 cm from sides of walls. -J! (lltiw 2ts5 ~- c a Z? o o w. . a1s 4cc ll?ls/8su wI lL~ arfoj~i~~v SCkgtl-rikq, wodurCI4 des 4uz" u. vow w.:'lc.c~c Ioo r"40 y4,C4I wi-d. 0o~ty ckolH:e~ Qts 20o cc.ci u 6S l"cIi) Geiger oounter 3'levers for point change FQ4 Foot pedal APPENDIX "C" Diagrammatic only Not to scale rails A Brake operated by foot pedal, holding mine car for period of geiger cheek. Spiral spring connected to brake mechanism.. - i I Igu4schalk?I NO Approved For Release 2007/12/07: CIA-RDP80SO1540R007300090002-6