MISKOLC NEHEZSZERZAM GEPGYAZ FOUNDRY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A000700370001-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
9
Document Creation Date:
December 20, 2016
Document Release Date:
December 13, 2007
Sequence Number:
1
Case Number:
Publication Date:
April 25, 1957
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80T00246A000700370001-3.pdf | 207.05 KB |
Body:
6
Approved For Release 2007/12/13 : CIA-RDP80T00246A000700370001-3
w
SEE BOTTOM OF PAGE FOR SPECIAL CONTROLS, IF ANY
INFORMATION REPORT
This material se of contains information affecting the
National Defense of the United States within the
meaning of the Espionage Laws, Title 19, V.S.C.
PREPARED AND DISSEMINATED BY
Sacs. 793 and 794. the transmission or revelation
of which In any manner to an unauthorized per,
CENTRAL INTELLIGENCE AGENCY
son L prohibited by law.
COUNTRY
MMZ"Y
SUBJECT
'
DATE DISTRIBUTED
~.5 Q.lr-v 57
o?"W dry
Miskolc 1ehezitartan Gepgyaz 1
~~2'W? r
NO. OF PAGES NO. F ENCLS.
3 2
SUPPLEMENT TO REPORT # 25X1
THIS IS UNEVALUATED INFORMATION
fair report is the result of a joint collection effort by the Air parce, Army
and CIA and is disseminated in accordance with the parevisions of JBCID t7_]
1.
e lgskale 10
LZILCLOSWO A these U4 general location/. It is subordinate to the Ministry of
Metallurgy and Machine Industry. Since construction of the foundry in 1950, it
has produced the following major items: sewn-ten and 10-ten cranes (undo
special contract); farm glows; five-ten, seven-ten, 10-ton and 12-ton Mechanical
truck jacks; small lathes for asking teal parts; a subasselebly for aZ= red
vehicles; gun tubes for 37 =, 57 i., 85 i s and 122 s AAA; and final assembly
of these weapons.
2. Production of lathes and other domestic products was seventy seduced after
i September 1953 at which time the foundry out its 11 If deed of five to siz theus-
and by about 50 percent. Parts for these lathes were ptced outside the
foundry while the foundry itself made the precision Items. Ma 1,936, 210 lathes,
'Model w-61, were completed over a three meaths period. fto"bMaf "aau1ons
or these lathes are: 2.5 meters long, 120 en high, and ho-50 an wide.
fin"hod Items 70 percent were scheduled for espeat
2
3.
VhICh Shows a machine cootIag for an"
voi3lelex-/ 2k*$e cultings vere received at the foundry an rough castings and, ,
of a deep trough vbnaa symmetrical cquatwpLrt, upon being belt" at the flanges
cooWlettes the Subassembly. .4liss V M Pair Or these items Vere
per year and sent to Godelle, Iuogosy -"1036'1/19?a.S~. --
2
0
of this factory is 0epipari [ecsulekek t;ym.
-
I
DISTRIBUTION I STATE ARMY A I
5X
5X
,
Approved For Release 2007/12/13 : CIA-RDP80TOO246AO00700370001-3
1e. Work on gm tubes ianlT*d finishing the rough castings which sere rooeived
frees the Zisveg oepgyas f mdeu7, a larger plsft 25X
finishing the tubes included rIrJMW =* o ="25X
the nurse to the anssie berate and whining the breech at to receive ft
breech ring sketch tick than the eatrigger 25X
pattern and apprsxt ate geaar'al dimensions at a 122 s AA gm tabu These
tubes wort of the calibers 37 =, 57 a, 83 as, end 122 s. Tat tubes and to.
breech rings ware produced for each weeps (set mltipte Beets). 9n-carriage
sights and breech rings were snufectured at YaMar OpEikai Blavek of Budapest.
Dy 1956 preduetim s finished gm tubes ended and only reboring or dasget
pieces as 60100-
5. the foundry also Lad the function of asseabSing Soviet antiaircraft weapons
of the ofererntieaed calibers. Prodnatisa of these items ms IdOLLY c]-ssifisd
and ygian aampS.etima the pieces sere ooverel with aauvas. i25X
AA dies 64SOLeted
Oat -23 an -544
2.954
daa' 36 - Oct 56
122 as
200- 300
lo0+
60
Repairs Oat
85 =
8O
8
50
50
Repairs 40]7
Repairs 4el7
Only
ROPLI"
57 =
37 =
0
*
*
-.41%: None Since 1953
The ga-enal Impression at the fury as that these pieces sere ebalete. an.
at the pieces sere rejected eves otter inspection $ the ailitary.
6. The tmnndry camgtaac consisted d appseaistsl,Y 12 builAings fltuats an a ~a1].7
recbangIar plot fftelasure, R is a layout at factory cowl eoy %ULIAina
are eoostruetel rtiatercel esserete. MW are an one-airy buildings except
a the oegle: See to its heillet sWet as arranged in three eight-hmmw 1111110h CORMLOU Of three shifts. The mmdmr of workers per shift varied with the few a a to 12 emtca
a part t irc
post" 419147tag the greatest percentage at sites. Ddsre the revolution the
f0=dry wptgad about three thecsaai workers; of these 160 were mined laberers?
At the at at the e{prisisg 35 percent Of the pere=s'tl to the foundry
but pmNuctiem hat comm, to a complete standstill in the meeatiaa. No training
p osma as in effect. Sappiy at rat mater ials as critical in production. as
peer gasify Of steel we also detrimental to the operation of the famdry.
Adalnistrstive psrsame]. esspriset 52 purest d total parsosnol. Blostrie penes,
heat, and hat Vats' had their stared in the Simms; fe a ry.
7. lU:ate as gee rally peer duo is lsmr wages tick ranged Brea 450 feints per aenth
for maintenance ps9rusanel to 3500 plus ant thsVSaol ffiats beans pS month for
the chief aaginoer. lately the labor fete as dgrived at vacation Vith th,
a policy tick prevailed Burins penises Years Yastm7 lea e bOW got adlitr7 streets because of the high: bass invsLael.
8.. Ou613ae at plant maaagemeat personoai:
Po" fisitai - director
Ivan Manor - ahid amgluaer
Dace Saeatidai - chief btskkesper
Jon asumarl tech eoatral chief
JYelss ROes - prtlnetion chid
Verna JtLems - toe], -king chid
lassie Osds - parsed manager 6-0-8-?-I-D-R-1hT-I-A-L
Approved For Release 2007/12/13 : CIA-RDP80T00246A000700370001-3
A
Page 3
C-O-N-l-1-D-3-Y-T-I-A-L
Located about fear km to the north of the foundry is an AA gon testing are
Csmgss ffiv 7700 2300 Alt 476547.
1LLOSM A - Geographic Iacatis of fatory - Classified COHFIDswrIAL
XX.'L0EMZ B - Layout of Phetory Cosgwlex - Classified CORFIU5nIAL
sketches: 25X
1. Baston or NmMamM Casting or Armred yehiele-Classified COlei MIAL
2. Generai sketches of 122 m AA am. - Classified CONFIDSRTTIAL
Approved For Release 2007/12/13 : CIA-RDP80T00246A000700370001-3
eocIRAVHIC I ocmrroaJ op Fac.rosy
47J3
ENCL oSV 7 1 Pt .
478
MtSKaLC_, IlAoricrAR-Y
Approved For Release 2007/12/13 : CIA-RDP80T00246A000700370001-3
C oNPibeNTiAL-
~- x-i-x-x-' X-x-x-x -.X-K
TOO n' _ _,~_
x-x-x--x-x~x i
"max
xx~)(- , ..._X-x--- r
F/.JCI,.osoRe t. 1_Ayour OF Fic.rot.y Cosl pI.FX
/~D),w
P SY,a_
1.
2.
3.
5?
6.
T.
9r
10.
11.
12.
13-
14.
15.
16.
17.
18.
Garage - elght-1O trucks; two pest cars; three
Transportation Office
central tssd Sa,}ply
16ehins Repair
Tool shop
Metallurgy Res lab
Director's Office
Assembly Area
Assembly Area
Assembly Area
parts ProduetianMbe Bering
technical central Section
chrome & nickel supply for teals
Steel Supply
Guard
Garden
Gate
Approved For Release 2007/12/13 : CIA-RDP80T00246A000700370001-3
Confidential
Confidential
. I' Confidential
~UTRI~iER ,{ H rrs.cti
(u : 22 9R G
1g0?'In
F, -r 9 OL
Confidential