GROSS DOELLN AIRFIELD: WALDLAGER II AND CONSTRUCTION OF NEW FUELING POINTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A026900210001-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 1, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
February 20, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A026900210001-0.pdf168 KB
Body: 
Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246A026900210001-0 This material contains information affecting the National Defense of the United States within the meaning of the Espionage Irws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. COUNTRY East Germany SUBJECT Gross Doelln Airfield: Waldlager II DATE DISTR. 20 February 1957 and Construction of New Fueling Points REQUIREMENT NO. report concerning 25X1 Wal lager II and planned construction of new fueling points at the Gross Doelln airfield. The report includes a sketch (not to scale) of Waldlager II. STATE IARMY NAVY ]~ AIR f B, AEC LA Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246A026900210001-0 Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246A026900210001-0 - ~ I EON GROSS DOLLN AIRFIELD: WiALDLAGTR II & NEW AIRFIELD C^NSTR IO Mid-Dec 56 - 6 Jan 57) APPENDIX "A":- Sketch plan (pot to scale) of VALDLAGER II. 1. WALDLAGER II WASNiivGTON ONLY (a) No dimensions of the site or indication of the position of the buildings in relation to kilometre stones or Jagens was given. (b) The dimension of the buildings given on Appendix "A" are only approximate except that the depth of the well of 12 metres is correct and it is known that it is only to provide domestic water supplies for the site and engine sheds at the end of the railway spur. (c) The four buildings alongside the rail spur were marked as storage sheds as follows:- ( i ) OELLAGER MIT VORWXRP.7E (ii) FASSUGER (iii) PASSLAGER (iv) K LTLAGER (OEL OHNE VORV ARL'I~ ) It is interesting to note that although (ii) and (iii) above were also with heating, they were named FASSLAGER as opposed to OELL.:u'R. (d) The engine shed and workshop is to be built at the end of the second rail spur. (e) Fuel off-loading points (ENTNAHMESTELLEN) approx 5 in number, will be between the two rail spurs. (f) The fuel installation at WALDLAG^i. II is to be connected with No.1 fuel installation by means of two long distance pipes:- (1) The first of these pipes will be approx 9 kilometres in length following the track of the main rail spur serving the airfield, at a distance of 12 metres from the rails and at a depth of approx 1* metres; steel pipes will be used with a diameter of 150 mm. (ii) The second pipe line will follow the track of the main road to GROSS DOLLN, entering the airfield at a point near KLEIN DOLLN and joining up with No.1 fuel installation. 2. NEt7 CnNSTRUCTION. (a) Five aircraft re-fuelling points are planned for construction in 1957. From these re-fuelling points it will be possible to pump a ? Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246A026900210001-0 Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246AO26900210001-0 I I ~EPET fuel direct from WALDLAGER II or Io.l fuel installiftion direct to the aircraft. The approx location of three of the re-fuelling points is:- (i) to serve the ladder-type hardstanding at the Eastern end of the taxi-track parallel to the EAST :TEST runway. (ii) approx 700 in. EAST of the large hardstanding situated between the Eastern end of the EAST WEST runway and the a/m ladder-type hardstanding. (iii) at the Northern end of the cleared area which extends NORTH EAST ihto the woods from the Eastern end of the EAST WEST runway. (b) The location of the other two re-fuelling points is not yet known. (c) Three brick-built garages, each for 20 vehicles are to be constructed on the site of tho HT park. Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246AO26900210001-0 Sanitized Copy Approved for Release 2010/04/01 : CIA-RDP80T00246AO26900210001-0 FV q -N =TA Gt ~gT~oN Futi., oPF_t,OO vD Pal"-Ts W/ Sff(0/47.01V o nr c.y Sanitized Copy Approved for Release 2010/04/01 : CIA-RDP80T00246A026900210001-0 Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246AO26900210001-0 4e Sanitized Copy Approved for Release 2010/04/01: CIA-RDP80T00246AO26900210001-0