CONCRETE MIXING PLANT AT THE LIPNO DAM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A033100030001-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 25, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
March 15, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A033100030001-0.pdf113.98 KB
Body: 
Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246A033100030001-0 x, CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United states within the meaning of the Espionage Laws, Title 18, U.S.C. Sees. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. S-E-C-R-E-T COUNTRY Czechoslovakia REPORT Concrete Mixing Plant at the Lipno Dam NO. PAGES REQUIREMENT NO. 15 March 195725X1 SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. photograph, with explanation, of a 25X1 concrete mixing plant (betonarni budova at the Lipno Dam construction near Lipno (N 48-38, E 14-14). S-E-C-R-E-T NOFORN STATE IX (ARMY I X INAVY I X IAIR (Not a Washington distribution indicated by "X"; Field distribution I N FORMA -'ON RE PC, RT I N FORMATION REPORT' Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246A033100030001-0 f C R E I' Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246AO33100030001-0 1r I .- R4 1. NBstcuarai bmdova'; the ooze mizsar is asssanbled from prefabricated punts lasioh are of metal itrnst*re and savored with lastes. 2. Transportation of assent; transportation is dome by searsns or bolts which travel from the silos placed by time railroad unlos&1z station to the main Bile placed ns*t to the Bstsaaarnj budova. TM ss volyar bels is installed an woedsn seslte]dtxad. The diffsarsseas in heiOht are vied by a tower a7atssay the oen"Wor runs shrovo the tower and has peolosts. These pockets ~~ ~t~f'~ *aunt on anothar belt and at the same time the a meat 3. 0 riwdsr; the grinder is a large 1roeL7tdi*g vhioh is also aseambled f ro^s pre. labrie&tcd parts. Bare sstseral O{ysbsn of mills arc installed for grinding of gravel. 16 Treasportation of gravel into W w grisdsar gray. is being transported rots the g1ri by as belts. (on the U$ft &a +oensttructias two bolts r+eo mud) Tian bolts srd ifs first of the somsrste aim from whore thspr travel Via the aunt ,.e bit into the grindwo Transportation of ~roand grave), into the MAIN roto mxer; from the grinder the belt (savored) leads' ante " the uppar~ past of the concrete mixer and than leads arms the sorting slates. 6. Transpoo:rtati~aa of fiidahod .oasts; the r ad r'to.+ase cansrete which is loaded ems spacial oasts ft w the two mixers placed on the g mdf],cer of the Betonarai bWeva is dripped by narrow gangs rail to the place of need. OntMkl The two mix rs mtppow to hold one cable motor of consroto each s+rerrpr 60 seaosds thw shsojd, VaIw d >waimed concrete. In the spring of 3$9 the aaomt of sonerste used an the oos*struction of the MIno &a was 500 cubes wetsars of oonercbe daily iuaring tboroo shifts, and still that output capacity was not Nally sadsisassted. According to the eutpa t chart the capacity of the Betenarni bndova should be 3W-l20 kwdre&kLI9 waa,ght of "no veto per ease hour. In the plan for 3956 was stated that the ' Bstenerks a ( ) should psrod:aae 63 thousands of cubic rosters of ate. Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246AO33100030001-0 Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246AO33100030001-0 25X1 4e Sanitized Copy Approved for Release 2010/02/25: CIA-RDP80T00246AO33100030001-0