OBJEKT 6, SDAG WISMUT: PRODUCTION: PLANS; PERSONNEL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A033400410001-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
8
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 22, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
March 27, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A033400410001-5.pdf269.89 KB
Body: 
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 5COPY _ CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. COUNTRY East Germany SUBJECT Ob ' e t 6, SDAG Wismut : Plans ; Personnel 27 March 1957 REQUIREMENT NO. DATE OF INFO. DATE AC Production Figures of SDAG Wismut Obiekt 6, Auerbach Kombinat 241 1. The ore mining plan for December 1956 was fulfilled as follows: Crated ore (Kistenerz) 102% Gallery advance exploitation o t t I Kontakt II 101% 88% 120% 115% 2. The following'ds the plan set for''January 1957: Kistenerz 3400- boxe s Gallery advance 2350 mete rs Mine exploitation 8500 squa re mete rs Heading Geological testing 570 mete 475 mete rs rs n cn (!-, KotatI 5000 met ric tons l-l Kontakt II 1500 met ric ton s Depth Kombinat 277 20 met ers 3. The ore mining plan for December was fulfilled as follows: S_E_C_R-E-T x ARMY x NAVY (Note: Washington distribution indicated by "X"; Field distribution by "#".) x FBI AEC Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 V Kistenerz 95 i Gallery advance 103% Kline exploitation 92 Kontakt I 1000 Kontakt II 98% 4. The following plan has been set for January 1957: Kistenerz 11850 boxes Llle ry advance 4500 meters Nine exploitation Heading Geological testing 12000 square mete 750 meters 600 meters rs Ko to t I 2500 metric tons Kontakt II 1200 metric ton s Kombinat 362 5. The ore mining plan for December 1956, was fulfilled as follows: Kistenerz.. 100% Gallery advance 10%- v' Nine exploitation 95-110 Kont a t I 98 Kontakt II 100p 6. The following plan has been set for'January 1957: Kistenerz 8500 boxes Gallery advance 3100 meters Mine exploitation 1000 square maters Heading 650 meters Geological testing 500 meters Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Kontakt I 2000 metric tons K ntq II 1000 metric tons Plans 1956 Plan For the year 1956, it was estimated that the plan for Kombinat 241 had been fulfille as follows : Gallery advance 104.40 Mine exploitation Geological testing 97p Old material (alte 1,1asse) 100% 1957 Plan At the end of November 1956, ObiEkt 6 Headquarters ordered the Kombinate to prepare their technical plans for the year 1957. In addition to a general exhortation to increase production,the Kombinate were asked to pay particular attention to the following points: a. The reduction of personnel; b. Acceleration of gallery advance in the direction of Hammerbruecke; c. Increasing of the proportion of used to unused material in the mining ore. 9. A meeting of the leading members of Kombinat 241 took place early in December 1956, to discuss details of the technical plan for 1957. The Appendix is an English translation of a draft plan approved b .this meeting, drawn up in its final form by Oberingenieur Jegorov. 10. The Hammerbrueclworkings mentioned in this draft plan lie about 8 kms. from 25X1 Schneckenstein. Geological borings have shown that rich deposits of ore can be expected in the Hammerbruecke area, and the existing Schneckenstein workings of Kombinate 241 are being advanced about 600 meters in order to reach the ore seams. Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 The sketch below shows details of the project. 11-7- m. ---- I planned mine exploitation .s vein Gal.lery(Rennstrecke)571 vertical section = 4,7 Personnel 11. It is now planned that the working force of Kombinat 241, at present numbering 1,800, shall be reduced in the next few months to 1,500 and eventually to a target figure of 1,000. 12. The Russian engineer Peshidayev, fnu, who was employed in the O.T.K.l, has gone back to the USSR and his place has been taken by a German engineer, Siegfried Tunger. Comment: Otdel Tekhnicheskogo Kontrola-Technical Control. Section. 25X1 ;,.+.: :.^ fo:.:_awv~~:-. '_^w:'.. ._..--.: ~t^*:.,.. '_ _`.-h- -,S' - e. :,'.-^-..m..t.,: ~.._' '-`z.`,.`. "4+-'rx .i-; .-c, ~.'. "ar-r-+-, ie.~?+: ~ .. -~.i' s, Sanitized Copy Approved for Release 2010/03/22 CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 -5- A? PE NDIX Technical Plan 1. To transfer to remote control, the work of the elevators of Schacht 241, the main elevator of Schacht 347 and some of the blind shafts. III quarter 2. To mechanize the feeding of small trucks travelling to the round dumps over an area. of 476 meters, I quarter 3. To automate the work of RKSI assembly on the 4.75 meter level. I quarter 4. In the most distant mining stcpes to transfer men engaged in blasting to stope brigades. I quarter 5. In order to increase the speed of horizontal face borings, the strength of which exceeds category 8, a new scheme of agitation (drilling with a template) is to be installed. III quarter 6. To reduce engineering and technical personnel in sectors No. 1 and 2 by reducing the number of sectors ( to amalgamate Sector 1 with Sector 3, and Sector 2 with Sector 4). I quarter 25X1 7. To strike from the balance (or write off) the Schacht surface complex of Schacht 244. I quarter 8. To reduce the servicing of Schach ransnnrt at the expense of the concentration of mining work and by writing off the upper levels. I/II quarter To bring the work of Schacht 244's compressor station to a stop. ii quarter 25X1 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 CIA-RDP80T00246AO33400410001-5 ? 1 10. To write off the equipment and machines from the balance of Schacht 244's holdings and to charge it to the central store for a sum of 1,000,000 DM E. III quarter 11. To reuse scarce materials to effect an economy of 10% (excluding the drilling steel, Widia boring bit,' and explosive material). I - IV quarter 12. To write the 535 meter level of Schaechte, 244' , 241, 252, together. Faith 'blind shafts 154, 161, 166,196. I quarter 13. To write off the 425 meter level of Schaechte, 244,241,252, and 347, together with blind shafts 201, 218, 215, 213, 209, 204, except for the Hammerbruecke working II quarter 14. To write off the 415 meter level in the blind Schaechte 241 Bis and 252 Bis. IV quarter 15. To complete deepening operations in the blind shaft 420/2 by 1 Nay 1957- a. The opening of the ore vein; Dal',nyaya, and the apophysis, Dal'nyaya, on the level 145 meters.by 1 April 1957.11 b. The opening of the ore vein, Dal'nyaya, and the apophysis, Dal' nyaya, on the horizental level 100 meters,to be finished by 1 August 1957. 16. To complete the opening of 1jammerbruecke workings in the first zone (kvartal). I quarter 17. To build a stationary transformer substation in the Ha]rmerbruecke region. II quarter 18. To improve the ventilation at Hammerbruecke workings by installing equipment which will circulate 100,000 m 3 of air per hour in mining drift 489 and zero mining drift 571. 25X1 II quarter 19. To transfer in full blocks for working without central risings I - II quarter Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 -7- .20. To switch over to expansion stay l:olt fastening methods on clips throughout the workings. I quarter 21. To transfer the work of production sections, and subsequently all the Schaechte, to work according to the chart of the cycle of operations. III quarter 22. To write off surface complex of Schacht 241. I quarter Co e 'c: RKS assembly has previously been reported to be a 25X1 stationary radiation counter. Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5 Next 2 Page(s) In Document Denied Iq Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5