OBJEKT 6, SDAG WISMUT: PRODUCTION: PLANS; PERSONNEL
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A033400410001-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
8
Document Creation Date:
December 22, 2016
Document Release Date:
March 22, 2010
Sequence Number:
1
Case Number:
Publication Date:
March 27, 1957
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 269.89 KB |
Body:
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
5COPY _
CENTRAL INTELLIGENCE AGENCY
This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title
18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law.
COUNTRY East Germany
SUBJECT Ob ' e t 6, SDAG Wismut :
Plans ; Personnel
27 March 1957
REQUIREMENT
NO.
DATE OF
INFO.
DATE AC
Production Figures of SDAG Wismut Obiekt 6, Auerbach
Kombinat 241
1. The ore mining plan for December 1956 was fulfilled as follows:
Crated ore (Kistenerz) 102%
Gallery advance
exploitation
o t t I
Kontakt II
101%
88%
120%
115%
2.
The following'ds the plan set for''January 1957:
Kistenerz
3400- boxe
s
Gallery advance
2350 mete
rs
Mine exploitation
8500 squa
re mete
rs
Heading
Geological testing
570 mete
475 mete
rs
rs
n
cn
(!-,
KotatI
5000 met
ric tons
l-l
Kontakt II
1500 met
ric ton
s
Depth
Kombinat 277
20 met
ers
3. The ore mining plan for December was fulfilled as follows:
S_E_C_R-E-T
x ARMY x NAVY
(Note: Washington distribution indicated by "X"; Field distribution by "#".)
x FBI AEC
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
V
Kistenerz 95
i
Gallery advance 103%
Kline exploitation 92
Kontakt I 1000
Kontakt II 98%
4. The following plan
has been set for January 1957:
Kistenerz
11850 boxes
Llle ry advance
4500 meters
Nine exploitation
Heading
Geological testing
12000 square mete
750 meters
600 meters
rs
Ko to t I
2500 metric tons
Kontakt II
1200 metric ton
s
Kombinat 362
5. The ore mining plan for December 1956,
was fulfilled as follows:
Kistenerz..
100%
Gallery advance
10%- v'
Nine exploitation
95-110
Kont a t I
98
Kontakt II
100p
6. The following plan
has been set for'January 1957:
Kistenerz
8500
boxes
Gallery advance
3100
meters
Mine exploitation
1000
square maters
Heading
650
meters
Geological testing
500
meters
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Kontakt I 2000 metric tons
K ntq II 1000 metric tons
Plans
1956 Plan
For the year 1956, it was estimated that the plan for Kombinat 241 had been fulfille
as follows :
Gallery advance
104.40
Mine exploitation
Geological testing
97p
Old material (alte 1,1asse)
100%
1957 Plan
At the end of November 1956, ObiEkt 6 Headquarters ordered the Kombinate to prepare
their technical plans for the year 1957. In addition to a general exhortation to
increase production,the Kombinate were asked to pay particular attention to the
following points:
a. The reduction of personnel;
b. Acceleration of gallery advance in the direction of Hammerbruecke;
c. Increasing of the proportion of used to unused material in the mining ore.
9. A meeting of the leading members of Kombinat 241 took place early in December 1956,
to discuss details of the technical plan for 1957. The Appendix is an English
translation of a draft plan approved b .this meeting, drawn up in its final form by
Oberingenieur Jegorov.
10. The Hammerbrueclworkings mentioned in this draft plan lie about 8 kms. from 25X1
Schneckenstein. Geological borings have shown that rich deposits of ore can be
expected in the Hammerbruecke area, and the existing Schneckenstein workings of
Kombinate 241 are being advanced about 600 meters in order to reach the ore seams.
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
The sketch below shows details of the project.
11-7- m. ---- I
planned mine
exploitation
.s vein
Gal.lery(Rennstrecke)571
vertical section = 4,7
Personnel
11. It is now planned that the working force of Kombinat 241, at present numbering 1,800,
shall be reduced in the next few months to 1,500 and eventually to a target figure
of 1,000.
12. The Russian engineer Peshidayev, fnu, who was employed in the O.T.K.l, has gone back
to the USSR and his place has been taken by a German engineer, Siegfried Tunger.
Comment: Otdel Tekhnicheskogo Kontrola-Technical Control. Section.
25X1
;,.+.: :.^ fo:.:_awv~~:-. '_^w:'.. ._..--.: ~t^*:.,.. '_ _`.-h- -,S' - e. :,'.-^-..m..t.,: ~.._' '-`z.`,.`. "4+-'rx .i-; .-c, ~.'. "ar-r-+-, ie.~?+: ~ .. -~.i' s,
Sanitized Copy Approved for Release 2010/03/22 CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
-5-
A? PE NDIX
Technical Plan
1. To transfer to remote control, the work of the elevators of Schacht 241,
the main elevator of Schacht 347 and some of the blind shafts.
III quarter
2. To mechanize the feeding of small trucks travelling to the round dumps over
an area. of 476 meters,
I quarter
3. To automate the work of RKSI assembly on the 4.75 meter level.
I quarter
4. In the most distant mining stcpes to transfer men engaged in blasting to stope
brigades.
I quarter
5. In order to increase the speed of horizontal face borings, the strength of which
exceeds category 8, a new scheme of agitation (drilling with a template) is to
be installed.
III quarter
6. To reduce engineering and technical personnel in sectors No. 1 and 2 by
reducing the number of sectors ( to amalgamate Sector 1 with Sector 3, and Sector
2 with Sector 4).
I quarter 25X1
7. To strike from the balance (or write off) the Schacht surface complex of
Schacht 244.
I quarter
8. To reduce the servicing of Schach ransnnrt at the expense of the concentration
of mining work and by writing off the upper levels.
I/II quarter
To bring the work of Schacht 244's compressor station to a stop.
ii quarter
25X1
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 CIA-RDP80T00246AO33400410001-5
? 1
10. To write off the equipment and machines from the balance of Schacht 244's
holdings and to charge it to the central store for a sum of 1,000,000 DM E.
III quarter
11. To reuse scarce materials to effect an economy of 10% (excluding the drilling
steel, Widia boring bit,' and explosive material).
I - IV quarter
12. To write the 535 meter level of Schaechte, 244' , 241, 252, together. Faith 'blind shafts
154, 161, 166,196.
I quarter
13. To write off the 425 meter level of Schaechte, 244,241,252, and 347, together
with blind shafts 201, 218, 215, 213, 209, 204, except for the Hammerbruecke working
II quarter
14. To write off the 415 meter level in the blind Schaechte 241 Bis and 252 Bis.
IV quarter
15. To complete deepening operations in the blind shaft 420/2 by 1 Nay 1957-
a. The opening of the ore vein; Dal',nyaya, and the apophysis, Dal'nyaya, on the
level 145 meters.by 1 April 1957.11
b. The opening of the ore vein, Dal'nyaya, and the apophysis, Dal' nyaya, on the
horizental level 100 meters,to be finished by 1 August 1957.
16. To complete the opening of 1jammerbruecke workings in the first zone (kvartal).
I quarter
17. To build a stationary transformer substation in the Ha]rmerbruecke region.
II quarter
18. To improve the ventilation at Hammerbruecke workings by installing equipment which
will circulate 100,000 m 3 of air per hour in mining drift 489 and zero mining
drift 571. 25X1
II quarter
19. To transfer in full blocks for working without central risings
I - II quarter
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
-7-
.20. To switch over to expansion stay l:olt fastening methods on clips throughout the
workings.
I quarter
21. To transfer the work of production sections, and subsequently all the Schaechte,
to work according to the chart of the cycle of operations.
III quarter
22. To write off surface complex of Schacht 241.
I quarter
Co e 'c: RKS assembly has previously been reported to be a 25X1
stationary radiation counter.
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5
Next 2 Page(s) In Document Denied
Iq
Sanitized Copy Approved for Release 2010/03/22 : CIA-RDP80T00246AO33400410001-5