(SANITIZED)INOTA ALUMINUM SMELTING PLANT(SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A034800120001-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
May 25, 2010
Sequence Number:
1
Case Number:
Publication Date:
June 3, 1957
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 843.7 KB |
Body:
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2
OCESSING COPY
CENTRAL INTELLIGENCE AGENCY
This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title
18, U.S.C. Seas. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibllbd by law.
COUNTRY Hungary
SUBJECT
Inota.Aluminum Smelting Plant
DATE OF
INFO.
PLACE &
DATE AC
DATE DISTR. -3 JUN 1957
NO. PAGES 1
REQUIREMENT
two-page report, plus A. layout sketch,
of an aluminum-smelting plant And power station At Inota.. The plant is
Alleged to be equipped with Czech-manufactured equipment originally destined
for Yugoslavia..
OTATE X ARMY NAVY AIR
FBI
iri'l SI a ce VW .21
25X1
AWNWONNOW
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2
1iUNGA;
ECONOMIC
Aluminium Smelting Works at INOTA
1. In 1950 an aluminium smelting works and its associated
power station was under construction at INOTA, and this was
cc,mpleted in 1953. The construction work was partly done by
CSESKOSLOVE?I~~:u ZAVADY TEZESHO STROJIRENSTVI, with the assis-
tance of the Hu.garian concerns ER6Mil BERUHAZAHI, the April 4
Works, and State Concern No. 30.
2. Origina:ily, the whole of the Czech machinery and .nstaa.l-
lations were intended for Yugoslavia but this was revoked when
relations between Yugoslavia and the Soviet Bloc became strained,
and the installation was reassigned to Hungary.. In return for
this favour Hungary was committed to reserve the whole of the
aluminium production of the works during the first 10 Years of
operation for Czechoslovakia.
Kee- to Sketch.
1. Single truck, normal gauge, railway
INOTA - SZEIESFEHERVAR - PETFtiRD6.
2. Asphalt road INOTA - SZEKESFEHERVAR, 5 metres wide.
3. Direction of SZEIZESFEHERVAR.
4. Concrete wall 22 metres high.
5. Wire fence surrounding aluminium smelting installatirna.
6. Entrance.
7. Guard-house.
8. Entrance.
9. Guard-house
10. Wooden huts for housing of slave labour.
i.. ;;X~~ een
-
71 25X1
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246A034800120001-2
SEI:RFT
12, Buildings for
13. ) Administration of slave labour.
114. >
15. Main building of power station 2t`0 .. 100 m,
52 m. high.
16. 2 chimneys, 100 in. high; dia?teter at base 12 in.
at to 5 m.
17. Conveyor belt for fuel.
18. Transformer house.
19. Power lines icn. generators to transformners.
20. Railway line from fuel dump to conveyor belt.
21. Siding.
22. Aluminium smelting oven
23. EEpntrance.
21.. Leine s to oven.
25. High tension power lines (110,000 voltu)
to BUDAP ST .
26. 2 coolinj towers base diameter oO in.
7 in. high diameter at top 50 m.
(Cooling towers are necessary because of tie
relative shortage of natural wa-,~or supplies
in the area.)
27. : ntranc e.
28. Main office.
29. Collection of cffice buildings.
30. Direction towards fuel dump.
31. Direction towards INOLTA.
I. S.IFFIC LI" ONLY
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246A034800120001-2
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2
Sanitized Copy Approved for Release 2010/05/25: CIA-RDP80T00246AO34800120001-2