(SANITIZED)HUNGARIAN WATERWAYS: 1. DANUBE-TISZA CANAL 2. SIO CANAL 3. PORT OF BUDAPEST-CSEPEL(SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A035400200001-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 2, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
June 28, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A035400200001-6.pdf213.01 KB
Body: 
Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 CENTRAL INTELLIGENCE AGENCYPROCESSING COPY This material contains Information affecting the National Defense of the United States within the meaning of the Espionage. Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which In any manner to an unauthorized person Is ,prohibited by law. 1. Danube-Tisza Canal 2. Sio Canal 3. Port of Budapest-Csepel Hungarian a erways: DATE OF INFO. PLACE & DATE ACQ. NO. PAGES REQUIREMENT NO. reports on the subject of Hungaribxi"'"" ' waterways: which was abandoned a. A one-page report, with sketch, 25X1 25X1 concerning the Danube-Tisza Canal project, b. A one-page report, with sketch, of the Sio Canal project (Danube-Lake Balaton). (northern end of Csepel Island). c. A one-page report, with rough sketch, of port installations at Budapest-Csepel ELE?_4 i. E U T E STATE X IARMY NAVY AIR FBI AEC Z)& ?? ? REPORT FORMATION REPORT Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 SEC SET HUNGkRY 1. Work on this project began after the war and was carried forward pacrticularly in 194950 when thousands of young people from schools and universitie;i spent their . hclidays c'igging with spade and shovel and receiving almost no pay. 2. The work has since been abandoned. Cnly some maintenance is being carried out as the 1954 floods have caused much damage to the existing excavations along a stretch of 10-15 Kms. 3. There is no likelihood of the work being resumed for the ;;ime being. Sketch Map attached. Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246A035400200001-6 PROJECTED DANUBE-TISZA CANAL COMPLETED SECTIONS I. CSEPEL ISLAND 2. DANUBE 3. KVASSAY Lock 4. Locality of DUNAHARASZTI 5. Projected Alignment 6. Locality of OCSA 7. That section of the Canal which has been partly dug (0-Is kM approx) 8. Section (Width of Canal at bed level about 30m.) Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246A035400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 U Economic River wort BtJD PEST `. CSEIM (so-called Free Port) end of Csepel Island have not been further developed in recent years and are in much the same condition as before the war. The follow-in,,;- facilities are available and currently in use:- 1. Ore deposit 2. Three (or possibly four) cranes as shown in sketch. 3. South quay wall of south basin. This wall was reinforced and repaired in 1951/52 and is now in a satisfactory state of maintenance. 4. North quay wall of south basin: Same as precedin item. 5. Grain warehouse 6. Three (or possibly four) travellin;cranes. 7. South quay wall of north basin. In 1953 it was still in war-dama'ed condition. In 1954. it was under reoon- struction and has probably been completely restored since. 8. North bank of north basin. This is a slantin bank of soil and no kind of artificial surfaoinL;. It is unsuitable for moorin craft. Attachment: Section of port. Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sect low o i vbAPeSr- CSeItt. RoAT 25X1 N Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 SECRET H U N G A R Y 1. TI-.e WIUBE - LA1 E B1LATON canal project is still a long tern plan. The alignment of the present canal is to be adhered to and looks are to be built at the points marked "CC" on the attached sketch. 2. At present there is a lock at SIOFOK and a sluice gate at SIMONTORNYA. The former is a shiplock; the latter, however, serves only to ensure the water supply of a tannery b,,? conserving water in times wf iittlo precipitation. 3. The water level of LA BALATON is at an altitude of 104. m-, above sea level. The altitude at the confl,uenoe of the SIC canal with the DIMBE at SZEKSZARD is roughly 75 in. at low water. This prodaces a difference in level of about 3C in. 4.. LIKE Bi,LLTON receives its water supply frca the river 2'LA and the river PLPOLCZA. When there 1s no precipitation in their basins the look at SIOFOK is kept closed to preserve the level of the lake. At such tines the water in the present SIO canal is quite insufficient to permit navigation. 5. When the Danube is high, water from it forces its way into the 3I0 canal frr some dis+anoe. Enole Sketch map. Section of projected canal SECRET Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6 S I O CANAL SECTION OF PROJECTED CANAL -f- 8,0 -*-* $o . Sanitized Copy Approved for Release 2010/04/02 : CIA-RDP80T00246AO35400200001-6