(SANITIZED)UNDERGROUND STRUCTURE TO HOUSE A TELEPHONE EXCHANGE IN BUDAPEST(SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A038200460001-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 24, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
October 31, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A038200460001-7.pdf261.81 KB
Body: 
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 PROCESSG 1. This material contains Information affecting the National DefeOee of the United States within the meaning of the Espionage Laws, Title 1e, U.S.O. Sea. 793 and 794, the tranamisslon or revelation of which in any manner to an unauthorized person is prohibited by law. COUNTRY 11=027 Undergr Ind Structure to RcM se a Telephtnei xehanpe in Budapest REQUIREMENT DATE OF INFO. PLACE 4& DATE AC r0URC91 EVALUATIONS ARE DEFINI VE_ APPQAISAL AF rfNTFNT IS TFNTATIVF 50X1-HUM 50X1-HUM 50X1-HUM report concerning the construction, batve" 1-951 and 1954's SA = rgrg ^ r it rt%u* to hcrase a telephone exahmw "Joining the D"k Yorawdftr spay station in Badapest. It is be iev d. that the *=ban~Dlt was J;nt ed for the use of the Ministry of the Interi*r. The report' gt l'es a daseription of the construction of the exc a gee and includes three eketlebes dch show the structure as seen fro Vei-riou.s *es. REPORT DATE DISTR. 31 OCT 19" NO. PAGES 1 STATE x ARMY AVY (Hotel Washington distribution indicated by "X"; nerd dlsk>VsAha -y AEC L-1 L _1 Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 HUNGARY Military Subterranean Premises for a Telephone Exchange in BUDAPEST (1951 - 1954) 1. The Underground Railway Planning Office, BUDA EST, which was asp" cially formed for the purpose, began in 1951 to plan the construction of a subterranean telephone exchane to adjoin the underground station "Perenc DEAK Place" in BUDAPEST. 2. In 1952, the project, handled by Dr. Karoly SZ.ECHI, chief engineer and director of the Underground Railway Planning Off ice had passed the plan- ning stage, and actual work under the control and supervision of a Soviet engineer commenced. The task was finished two years later. 3. The construction of the premises to accommodate a telephone exchange was not easy as the shelter on its SE side was only a few metres away from the foundations of a five-storey building, occupied by the Ministry of the Interior; and on the NE side there was a high church. (In fact the work caused the church to sink only 4.. mms.). 4. The underground premises, two metres below street level, had a mantle and curling of 2.5 metres of reinforced and a reinforced concrete floor of 1.2 metres in thickness. Internal dimensions of the shelter were as follows: Length approx. 28 m Width It 15 m He ight it 5.2 m. It was divided into two compartments: one to house necessary machi- SECRET Q c /staircase ~[ Ys d. Vuf iClALS lilt COPY . 50X1-HUM Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 nery and other sheltdr(~e{"~u1i r t and floor reached by a Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 staircase), and one for the telephone exchange proper, (on the floor above, but covering only half the width of the shelter. (See Sketches 1$2,3-) A door on either side of the escalator of the Underground Station gave access to a covered passage, asout seven metres long, which led to the shelter from which one door led to the telephone exchange and one to the machinery floor. 6. Only the bare shelter was built with all necessary electrical and plumbing leads, to enable switchboard panels, water supply, heating and usual shelter machinery, to be installed later. 7. The shelter had one air vent loading to street level near the en- trance to the underground station, and. one on the roof of the Ministry of the Interior. 8. When construction of the shelter was finished, the doors on either side of the escalator c:.,uld be seen for some months afterwards. They were subsequently bricked up and have been so ever since. /A YP DIX 1 SECRET Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 SITUCE of UNDERGROUND TUBE STATION, FERENC DEAK PLACE, BUDAPEST TUBE LINE No. 2 SECRET UNDERGROUND PREMISES FOR TELEPHONE EXCIIIANGE Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 50X1-HUM Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 - .APPENDIX 2 UNDERGROUND TUBE ST., `.PION, FERENC DZt K L LIRE, BUUF ,ST Three Row Escalator Leading to Tube Line No.1 N Hall Leading to -- _ .~ Escalators Foyer Staircase Leading to Street ZET CONTROL Underground Premises for Telephone Exchange Staircase Leading to Tube Line No. 2 Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246A038200460001-7 UNDERGROUND PREKESES FOR TMERIONE :E CH NCE BUILT INTO TUBE STS:>TION _- ER O DEAK PLC BUDAPEST. GROUND PLJ\N I Ij t~-, . SIDE MEVi TION Strcet Level SECRET Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246A038200460001-7