(SANITIZED)UNDERGROUND STRUCTURE TO HOUSE A TELEPHONE EXCHANGE IN BUDAPEST(SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A038200460001-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 22, 2016
Document Release Date:
August 24, 2010
Sequence Number:
1
Case Number:
Publication Date:
October 31, 1957
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 261.81 KB |
Body:
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
PROCESSG 1.
This material contains Information affecting the National DefeOee of the United States within the meaning of the Espionage Laws, Title
1e, U.S.O. Sea. 793 and 794, the tranamisslon or revelation of which in any manner to an unauthorized person is prohibited by law.
COUNTRY 11=027
Undergr Ind Structure to RcM se
a Telephtnei xehanpe in Budapest
REQUIREMENT
DATE OF
INFO.
PLACE 4&
DATE AC
r0URC91 EVALUATIONS ARE DEFINI VE_ APPQAISAL AF rfNTFNT IS TFNTATIVF
50X1-HUM
50X1-HUM
50X1-HUM
report concerning the construction,
batve" 1-951 and 1954's SA = rgrg ^ r it rt%u* to hcrase a telephone
exahmw "Joining the D"k Yorawdftr spay station in Badapest. It is
be iev d. that the *=ban~Dlt was J;nt ed for the use of the Ministry of the
Interi*r. The report' gt l'es a daseription of the construction of the
exc a gee and includes three eketlebes dch show the structure as seen
fro Vei-riou.s *es.
REPORT
DATE DISTR. 31 OCT 19"
NO. PAGES 1
STATE x ARMY AVY
(Hotel Washington distribution indicated by "X"; nerd dlsk>VsAha -y
AEC
L-1
L _1
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
HUNGARY
Military
Subterranean Premises for a Telephone Exchange in BUDAPEST
(1951 - 1954)
1. The Underground Railway Planning Office, BUDA EST, which was asp"
cially formed for the purpose, began in 1951 to plan the construction of a
subterranean telephone exchane to adjoin the underground station "Perenc
DEAK Place" in BUDAPEST.
2. In 1952, the project, handled by Dr. Karoly SZ.ECHI, chief engineer
and director of the Underground Railway Planning Off ice had passed the plan-
ning stage, and actual work under the control and supervision of a Soviet
engineer commenced. The task was finished two years later.
3. The construction of the premises to accommodate a telephone exchange
was not easy as the shelter on its SE side was only a few metres away from
the foundations of a five-storey building, occupied by the Ministry of the
Interior; and on the NE side there was a high church. (In fact the work
caused the church to sink only 4.. mms.).
4. The underground premises, two metres below street level, had a mantle
and curling of 2.5 metres of reinforced and a reinforced concrete floor of
1.2 metres in thickness. Internal dimensions of the shelter were as
follows:
Length
approx.
28 m
Width
It
15 m
He ight
it
5.2 m.
It was divided into two compartments: one to house necessary machi-
SECRET
Q c /staircase
~[
Ys d. Vuf iClALS lilt
COPY . 50X1-HUM
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
nery and other sheltdr(~e{"~u1i r t and floor reached by a
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
staircase), and one for the telephone exchange proper, (on the floor above,
but covering only half the width of the shelter. (See Sketches 1$2,3-)
A door on either side of the escalator of the Underground Station
gave access to a covered passage, asout seven metres long, which led to the
shelter from which one door led to the telephone exchange and one to the
machinery floor.
6. Only the bare shelter was built with all necessary electrical and
plumbing leads, to enable switchboard panels, water supply, heating and
usual shelter machinery, to be installed later.
7. The shelter had one air vent loading to street level near the en-
trance to the underground station, and. one on the roof of the Ministry of
the Interior.
8. When construction of the shelter was finished, the doors on either
side of the escalator c:.,uld be seen for some months afterwards. They
were subsequently bricked up and have been so ever since.
/A YP DIX 1
SECRET
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
SITUCE
of
UNDERGROUND TUBE STATION, FERENC DEAK PLACE, BUDAPEST
TUBE LINE
No. 2
SECRET
UNDERGROUND
PREMISES FOR
TELEPHONE EXCIIIANGE
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
50X1-HUM
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7 -
.APPENDIX 2
UNDERGROUND TUBE ST., `.PION, FERENC DZt K L LIRE, BUUF ,ST
Three Row
Escalator
Leading to
Tube Line
No.1 N
Hall Leading
to
-- _ .~
Escalators
Foyer
Staircase
Leading to
Street
ZET CONTROL
Underground
Premises for
Telephone
Exchange
Staircase
Leading to
Tube Line
No. 2
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246AO38200460001-7
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246A038200460001-7
UNDERGROUND PREKESES FOR TMERIONE :E CH NCE
BUILT INTO TUBE STS:>TION _- ER O DEAK PLC
BUDAPEST.
GROUND PLJ\N
I Ij t~-, .
SIDE MEVi TION Strcet
Level
SECRET
Sanitized Copy Approved for Release 2010/08/24: CIA-RDP80T00246A038200460001-7