STENDAL AIRFIELD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A039900490001-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 22, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
January 30, 1958
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A039900490001-6.pdf194.95 KB
Body: 
Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 PROCESSING COPY FORMATION INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY This material contains Information affecting the National Defense of the United States within the meaning of the Espionage L-ws, Title 18. U.S.A. Sea. 70.3 and 794, the transmission or revelation of which In any manner to an unauthorized person Is -prohibited by law. COUNTRY East Germany SUBJECT . Stendal Airfield NO. PAGES REQUIREMENT NO. DATE OF INFO. PLACE & DATE ACQ 30 JAM 1958 URCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. report on 1.5tendal airfield which gives information under the following headings; \H71) Eastern End of Runway and Taxiways, (2) Connecting Road between The 50-Meter-Wide Hardstanding and the Old POL Store, (3) Track Leading Westward from 50-Meter-Wide Hardstanding, (4) Electric Power, (5) Airfield Perimeter Fence, (6) Rail Spur, (7) Concreting Work, (8) Aircraft State, and (9) New Contract for ITB (Ingenieur Tiefbau) Brandenburg at Colbitz:.] Two sketches are also included: One shows the eastern end of the runway and taxi- ways, and the other shows the northern link road to the old POL store. [STATE NOW ARMY IX NAVY X AIR EV X Fat Washington distribution indicated by "X"; Field distribution by AEC Q INFORMATION REPORT I N r' ORMATION REPORT Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 SECRET EAST GERMANY AIR/MILITARY APPENDICES - Attached at Appendix "A" is a sketch of the eastern end of the runway and taxiways. Attached at Appendix "B" is a sketch of the northern link road to the old POL store. EASTERN END OF RUNWAY AND TAXIWAYS 1. The 28 m. wide eastern conerete apron is constructed of 3.5 m. wide, hand-laid, concrete sections (see Sketch at Appendix "All). 09 ,-PTUM ROAD 13B"'Mm THE 50 M. WIDE HAI7ASTANDING AND THE OLD P O'1., ; ICF_E 2. The junction of this road with the clinkered area adjacent to the old POL store has been filleted on the east side only. (See Sketch at Appendix "B"). It is unlikely that any filleting will take place on the west side of the junction since all concreting has ceased in that area and, indeed, all over the airfield except for the patching and improvement work on the runways and taxiways. TRACK LEADING WESTWARDS FROM 50 M. VIDE HARDSTANDING 3. The 14 metre wide track leading westwards from the 50 m. wide hardstanding has now been completed. This track makes a further short bend in a north westerly direction immediately before joining the existing clinkered road. (See Appendix "B"). ELECTRIC POWER 4. An overhead high voltage power line which runs in a north-south direction about 600 - 800 m. west of the western end of the main run-c.y is to be replaced by an underground cable. It is said locally that the lanth to be placed underground will total 2c km. viz: 10 km. each way north cm:_ south of the airfield. The cable laying and dismantling of the high voltage line will probably be crrried out by the firm of STARKSTROMLEITUNGSBAU, RUDOLF FFt Y, ALTENBURG (THURINGEN) who will have extra labour provided in the form of GermaA prisoners serving hard labour sentences, who will dig the cable trench. AIRFIELD PERIMETER FENCE 5. The whole airfield area is now surrou.ded by a barbed wire fenee of approximately 2.5 m. height. It r i as follows: (i) Along the southwesternfe.ge of the wooded area which flanks the airfield to the nuryh, (ii) Then it turns westward from the edger of the mood along a line about 250 in. north of the runway, and parallel to the latter, until it reaches a point about 100 in. east of the footpath which passes the pig farm. SECRET /(iii) .... 25X1 9868 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 SECRET (iii) It then runs for about 100 m. parallel to the footpath mentioned in (ii) above, in a north-south direction. (iv) When it is about level with the pig farm it branches e.ist7 rd in the direction of the old firing range,(it is not knonn whether the old firing range is, in fact, enclosed by the fence). Further east the new fence links up with the old existing b,rbed wire fence. (v) At approximately 31.5 km along the STENDAL/BORSTEL road tho fence reaches the road, coming from a due south direction. (vi) From this meeting point the fence runs along the west side of the STENDAL/BORSTEL road as far as the main entrance of the airfield. (vii) It then turns westward to run along the southern edge of the main entrance road into the airfield. Fencing work is being carried out by a Soviet working party. RAIL SPUR 6. The rail spur serving the airfield runs along the north side of the emtraaee road to the airfield. CONCRETING V7ORX 7. A total of about 100 concreting sections 5 x 3.75 m. are having to be remade or .tched. Up to 6 Dec .bout 30 of these had been completed. All this work is being done by hand. AIR` STATE 8. 6 Dec 57. Only one helicopter was left on the airfield. It is not known where the other two have gone. There were no other aircraft on the airfield. NEW CONTRACT FOR ITB BRANDENBM AT COI,BITZ 9. It is rumoured that ITB BRANDENBURG will start in February or March 1958, on completion of their ,.ork on STENDAL airfield, a 2 to 3 year construction programme, details of which are at present lacking, at COLBITZ. COLBITZ lies on main road No. 189 MAGDEBURG - STENDAL, east of NEUIIALDENSLEBEN. LCObIlV~IT Re Para 5: The course of the fence described in sub-paras (i) to (vii) should, for the time being, be taken as approximate only, e.g. if the fence crer: to follow the course implied in sub-paras (iii) and (iy) it would appear to out acrnAa thn end of the runway. SECRET Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 OLinL I ,,'c r b s'~ { 8-I's .r.0 r g. f SECRET Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6 SECRET - Sanitized Copy Approved for Release 2010/06/22 : CIA-RDP80T00246AO39900490001-6