THE POWER STATION CONSTRUCTION AND INSTALLATION TRUST IN BUCHAREST
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A051900440001-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
11
Document Creation Date:
December 22, 2016
Document Release Date:
August 23, 2010
Sequence Number:
1
Case Number:
Publication Date:
December 17, 1959
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1.11 MB |
Body:
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80T00246A051900440001-7
CENTRAL INTELLIGENCE AGENCY
This material contains information effecting the Nstioasl Defense of the lJnited States within Lhe mesninl~ of the ]Sspioaags Isws, Tlbie
18, II.s.C. secs. 793 and 794, the transmission or revelation of which Sa say manner to sn uaauthoripd person L prohibited by law.
SUBJECT The Power Station Construction and DATE DISTR. 17 December X959
Installation Trust in Bucharest t
NO. PAGES 7 !,
REFERENCES RD
DATE OF
INFO.
PUCE &
the following sections:
a.
b.
c.
d.
located in the former building of th? now defunct Ministry of Electric P~
(Miniaterul Energies Electrice). While the entrance to the latter was at
23-25 Bulevardul General Magheru, the entrance to the trust offices is on
Strada Mandelier (number unknown), a street running parallel to Bulevardul
General Magheru.
stations and installs their equipment. The head office o"f the trust is
.50X1-HUM
50X1-HUM
1. The Power Station Construction and Installation Trust (Trustul Conatructie
si Montaje Energetics -~TCME) in Bucharest constructs power and transformer
was put into operation. It belonged, at that time, to the Ministry of.
2. The Power Station Construction Trust (Trustul Energo-Constructie) had been
established in 1950 at the time the plan for the electrification of Rumania
Electric Power. When that ministry was abolished in about 1957, the trust
was transferred to the Department of Electric Power at the Ministry of Heavy
Industry (Ministerul Industries Grele Departamentul L'tlerg ei Electrice). In> ~'~
1958, the Power Station Construction Trust was merged wit the Electrical
Installation Trust (Trustul Electro-Montaj), since which time it has been
designated the Power Station Construction and Installatioh Trust, TCML~.
The management of the trust consists of the director general, the technical
manager, the administrative manager, and the chief engineer. The trust has
Planning (Serviciul de Plan) .
r
~~'~,! C
Supplies (Serviciul Aprovizionari) .
~~` ~ f lL~r~
Accountancy (Serviciul Contabilitatii).
Personnel (Serviciul Cadelor).
e. Technical Affairs (S~srviciul Technic), which is responsible
for the calculating of business costs.
(Note: Washington distribution indicated by "X"; FieM dishibution by "#".)
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80T00246A051900440001-7
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80T00246A051900440001-7
f. Production (Ser~-iciul Productiei).
g. Internal Control (Serviciul Control Intern), which examines the trust invest-
ments and projects with regard to their effect on the national economy.
h. Labor and 'uJages (Serviciul Munca si Salarii).
!~. To carry out the tasks assigned to it, TCT~1~'' has established. various Executive
groups. The management of an executive group consists of a chief engineer, a
chief accountant, a.n~} a.n assistant chief engineer. The ,;roues were ca.]_led.
Complexuri de Santiere until 1958, after which time they were designated Grupuri
de Santiere (Sand er -building site). Administratively, the executive group
consists of the following departments (servicii) and sections (sectii)
a. Technical Department (Serviciul Technic), which also includes the Production
Section (Secti.a Froductiei).
b. Supply Departrr_ent (Serviciul Aprovi2iona.rii), which deals with the supply,
storage, and transport of materials required. for the construction projects.
c, Accounts Department (Serviciul Contabilita.tii), which consists ~f an accounts
section (secta a contabilitate) a.nc} a. financial section (secd_a. finsnci.ara) .
d. Pla._,::-in; ect;-irn (Setd_a P1an:i.''icare).
5.
e. I~Fr?so~-~~,^1. ~:,,ct~ can (Cectia Car]re ~: _ -r. Ana]) .
f. Tabor an; !:a`a;;~s :3cction (S-:ct~i~ ""unea si. ~~ l.ari_i).
g. Section for Ration Car's (Sectla de C;arte].e), tnThiCh ?~istrilrutes feo_'. ration
coupons among the works=.rs and pays them the r^onthl,y a.1J.otiTa.nce of 100 lei .for
each child b =]_ow lI~ ycaxs oi' a~;e, In the fall of 15'x8 a.nd in ear~l.:v ].~59,
there w~^s a shorta~~e of bread, any:; t,orkors raceived b~ea.i ra t~ ons 5 n F;cchar.~e
for coupons c)istributed by the section, 350 grams of bred:} as a .~ta:~:larc; rate
and 500 grams ~'~r tt:ose doing heavy physical ta~?rk.
In 1952, the Grupul rie Santiere-Petrosani for power an~i tran.~?orm~zr :,tad_c>ns Baas
established i.n the Ji_u River Val]_ey. The,roup *rJas actusll.~ tilationec3 ir, thr
village of Parose.ni, cn the Lupeni-Petrosani road '~etween zrulca.n airy} Z,iaPeni. the
two towns are loca tee} at a. distancE of 5-6 }cilom^ters from e.ac~: ether, anr.l almost
the entire area. is taken up by the group an:, the thermal power station un.~er
construction. 'I'he group was ,riven a false name beea.use of the secrecy of the pro
jects carried nut in Paroseni.
6. Between 1952 and. 1955, the Grupul de Santiere-Petrosa.ni employed ?_,000 workers.
The number employed has since been reduced to 1,000. About 90 percent of the
unskilled laborers a.re draftees serving; in the labor battalions (1)GSP1 - ~)irectiunea
Genera la. a. Serviciului 1vlun.cii). The group usually works in one shift: from 0700
to 1500 in the sununer, and from 0800 to 1600 in the winter. 's^n'en large qua.ntitiEs
of concrete are being; cast, hc~rrever, operation i_s in two or three shifts.
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80T00246A051900440001-7
Sanitized Copy Approved for Release 2010/08/23 :CIA-RDP80T00246A051900440001-7
S-E-C-R-E-T
7. During 1957-1958, the group erected three stations for transforming 35 kv a.nd 110 kv
high tension current to 6 kv current. The stations are situated in the following
locations :
a. In Lupeni, near the football field and the Coal Cleaning a.nd Sorting Plant
(Preparatia Lupeni).
b. In the village of Petrila., near the Coal Cleaning and Sorting Plant (Prepa.ra.tia.
Petrila).
c. In Barbatesti, 30-L~0 kilometers south of Tirgu-Jiu, where a new industrial
center is being developed for the exploitation of coal and petroleum.
8. The groups principal. project is the construction of a thermal power station at
the groups location (between Vulcan a.nd Lupeni). The project wa.s begun in 1952,
'`?r?x,: was pu.t into operation in 1956, and is due for completion in 1961. The station
is situated. south of the Jiu de Vest River and the P~trosani-Lupeni railroad line
and nor. th of the P~^trosani-Lupeni hiE,hway. The area of the station is to be
enclosed bar a .fence two moters high, the base a.nd top of which will 'oe cast concrete
connected. by a. concrete la.tti_cE a.nd topped by three strands of barbed wire. In
Fe?~rua~r=-1~>~, only the part of the fence facing the Petrosani-Lupeni highway
har] brera compl.c-ted; th^re t~ras still free access to the other sides.
9. The stati.cn area. :is served. by rail.roac spurs a.rxl a. special railroad stat~.or. The
turb7n~~s r,f the station ti~rere supplic;d by the Kirov Plant in J~enin~;ra.d; the other