CONSTRUCTIONAL DETAILS OF ARMORED VEHICLES UNDERGOING REPAIRS AT THE SOVIET REPAIR SHOP IN WUENSDORG

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A052200030001-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 4, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
January 8, 1960
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A052200030001-8.pdf200.72 KB
Body: 
Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246A052200030001-8 CENTRAL INTELLIGENCE AGENCY AIR informati laws , Title 18,1V.8.0.HSecs. 993 and 794, thentransmission efe Of the of which in anyd mtaSta nneerrto an within unauttho~ried of the Is ed b law. person >d prohibited by law. COUNTRY East Germany SUBJECT Constructional Details of Armored Vehicles Dndergoing Repairs at the Soviet Repair Shop in Wuensdorf DATE OF INFO. PLACE & DATE ACQ. REPORT DATE DISTR. NO. PAGES REFERENCES 50X1-HUM Ireporta in- u i ng 'urir a eie s D concerning the constructional details of armored vehicles undergoing repairs at the Soviet Tank Repair Shop in Wuensdorf. The sketches include details on the following: T-34/85 shaded headlamp; T-34/85 gun barrel support; angle of T-54 glacie and lower nose plate; placement of supplementary fuel tanks on the T-54; location of shell stow., age; and placement of unidentified containers on the stern of the T-54. The report is essentially an explanation of the sketches. .TAT[ I XIARMY NA (Note. Weshinston distribution indicated by "X"; Field distribution by "#",) 8 JAN 1960 1 Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246A052200030001-8 Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246AO52200030001-8 SECRET MST GNY/u.S.S.R. MILIT RRI ConstWtionsl Details of AM pdeMing repair at the LIV Repair Depot- . (Ayril/fty, .1959) 1. T34/84 Since the beginning of April, 1959, all T34/859 passing through the workshops have been equipped with two additional supplementary fuel tanks, bringing the total number of tanks per AFV to five, The two additional tanks are fitted to the stern of the vehicle. 2. Headlamps - T34/85 and SU-100. Since the 5th April, 1959, T34/85s and 3U-100s have been fitted with two headlamps instead of one as previou:nly. The lan:,ps are positioned on either side of the AFV at the height of the first track wheel. The headlamp on the starboard side is shaded as shown in Appendix "A" Fig. 1. 3. Gun Support. T34/85. During the month of April, 1959, two of the T34/850 coming to the workshop for repair were fitted with a gun support as sketched in Appendix "A" Fig. 2. Tho support was fitted on the str.:rn and could be folded to the rear. The construction and fittin.., of the support were very primitive and the welding badly done. The gums of the vohicles wore of the normal pattern. 4. P54 - Angle between Cl:;cis Plate f nd Lower Nosoi;late. See Appendix "B" Fig. 1. This angle measures 62. 5. T51 - Internal fittings. (a) 4 x 12 volt, 120 Tamp/h. accumulators are fitted in a carrier situated on the right of the drivers' po.iitioz, ? s sh.,+rn in the sketch. The accumulators are positioned in two p&irs vertically above each other in the lon,itudina1 axis of the vehicle. (See Appendix "B" Fig. 2A). (b) Shell Stowagee (See Appendix "B" Fig. 213). Two alternative forms of smp;nition et--)wa;c have been soon in T54s, each situated on the starboard aide of' the driver's oomp-irttw.nt approximately 60 cm. from th,, nos, of fro vehicle One etowa,.;e variant takes 48 sholle stowed horizont%lly in !,ix layers of ui ht, the other variant 36 shells in six layers o,f six. Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246AO52200030001-8 Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80TOO246AO52200030001-8 50X1-HUM SECRET (~) Fue.,. Three internal fuol tanks have boon soon in the T.54s i) Is situated between the enoino ind the cabin partition wall and its length is identical with the width of the vehicle. The tank is sketched at Appendix "B" Pig.2C. ii) The tank sketched at Appendix "B" Fig. 2D is situated high up oz; the inside of the port side plate at the rear of the AFV. iii) The tank sketched at Appendix "B" Fig;. 28 is situated in front of the ammunition stowage in the bow of the tank. 6. 3uvelenentau Fug: i Tanks. Three flat external su1plementary fuel tanks are fitted as standard equipment to the T54 and are connected by fu3l-linos to the internal tanks as followes (a) One tank (Appendix "B" Fig. 2F) is on the port side above the fifth trackcwheel and is mounted on the track-guard. This tank is connocted to tank 2D described above. (b) Two tanks (Appendix "1" Fig. 2G) are mounted on the track-guard above the fourth and fifth'brsokwheels on the starboard side, and are connected to the tank 2C daacrihod above. 7. On one occasion during the period under review two large containers as shown in Appendix "C" were seen fitted to the stern of a T54 after it had passed through the repair workshop and was in the shed in which final inspections are carried out by the Technical Control Officer. The. ccmtainure appeared to be mado of iluminium and were fitted on two esoioireular arackets at the stor-i of the AF'V. The size of each container is assessed as bc,twoon 1 and 1.2 metres in lc:nvth and 50 to 60 M. in diameter. SECRET Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80TOO246AO52200030001-8 Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246AO52200030001-8 APPENDIX A F-G 1. CLM -Wean Out , tc4K -- f0A tilt V4093 HiAvLArr - Ta4If$ CuN 6WEL 9MO i - -r34J , gyro s 0 - 14or -r, sb . . Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246AO52200030001-8 Sanitized Copy Approved for Release 2010/10/04: CIA-RDP80T00246AO52200030001-8 APPLNOI TS+. - TUNQTuJE OF GLAtK